Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

La Quinta Retention Basin Upgrades

Active
RFB-26-340State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Yuma is soliciting proposals for the La Quinta Retention Basin Upgrades to address ongoing issues with standing water at the 29th Lane Linear Park retention basin. The project involves significant grading modifications to the existing basin, installation of new catch basins, and the construction of an 18-inch storm drain system that will connect to a newly constructed storm water lift station. The purpose of these upgrades is to redirect water from the retention basin to a large adjacent field to the east, where increased surface area and percolation rates will enhance natural dissipation through infiltration and evaporation, thereby minimizing or eliminating standing water nuisances. The storm water lift station will be the central component of the system, engineered to pump accumulated water efficiently from the basin to the eastern field. This solution aims to improve long-term water management without relying on traditional storm sewer outfalls, instead leveraging the natural capacity of the adjacent land. The solicitation, numbered RFB-26-340, was posted on July 31, 2026, with proposals due by September 3, 2026. All work is to be performed in Arizona, and the project is being managed directly by the City of Yuma, with no set-aside requirements specified. Interested parties can access additional details through the provided online portal.

General Info

Yuma to upgrade La Quinta Basin with catch basins, 18-inch drain, and lift station to redirect water east for natural dissipation.

Agency

Arizona → City Of YumaView Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

AZ, USA

Set-Aside

NONE

Documents

(6)

RFB-26-340 Certification & Addendum Acknowledgement Form

PDFcertification-acknowledgement-form

RFB-26-340 Offer and Acceptance Form

PDFoffer-and-acceptance

RFB-26-340 Arizona Statutory Bid Bond Form

PDFbid-bond-form

RFB-26-340 Construction Services Contract for La Quinta Retention Basin Upgrades

PDFcontract-document

RFB-26-340 La Quinta Retention Basin Upgrades Plans

PDFrfb

RFB-26-340 General Conditions and Special Conditions for La Quinta Retention Basin Upgrades

PDFrfb

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyArizona → City Of Yuma
ContactsNo contacts available
OfficeAZ, USA
Organization / Agency
Arizona → City Of Yuma
View Agency Profile
Office AddressAZ, USA
ContactsNo contact information available

Interested Companies (10)

Show more
Gov Alpha
Brooklyn, NY
Cendien
Carrollton, TX
Nobrainer Labs

See All 10 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
Grading modifications to the existing retention basin including new catch basins and a new 18" storm drain system to connect to the new storm water lift station. The new storm water lift station will pump standing water from the existing retention basin at 29th Lane Linear Park to the existing large field on the adjacent property to the east, in order to improve the dissipation rate of the water via increased percolation rate and surface area for infiltration and evaporation in order to minimize and/or prevent standing water related nuisances.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
AIRFIELD 2029 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure improvements at the Port of Seattle, focusing on modernization and safety enhancements across multiple systems. Key components include replacing airfield lighting circuits with low megger readings with new LED fixtures and signs to improve reliability and energy efficiency, replacing deteriorating pavement and critical utilities to maintain operational integrity, and implementing comprehensive wildlife hazard management measures such as removing turf edge dams, installing anti-perching devices on signs, and regrading areas with new storm drainage to eliminate ponding and reduce bird attractants. Additionally, failing flush fire hydrant access hatches will be replaced to ensure rapid and unobstructed access for emergency response. The project is part of the AIRFIELD 2029 ALL PROJECTS initiative, classified under NAICS code 237990 for other heavy and civil engineering construction, and is managed by the Aviation Project Management Group under the Port of Seattle. Solicitations are open with a posted date of July 31, 2026, and inquiries should be directed to Yanet Maldonado, the primary point of contact. The work is critical to maintaining airfield safety, regulatory compliance, and long-term operational readiness, with all efforts centered on upgrading aging infrastructure to meet current aviation standards.
Aviation Project Management Group

POSTED

12 minutes ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
AIRFIELD 2030 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure upgrades at the Port of Seattle, focusing on enhancing safety, efficiency, and compliance. Key components include replacing aging airfield lighting circuits with low megger readings with modern LED fixtures and signs to improve visibility and reduce maintenance costs. Concurrently, failing pavement sections and critical utilities will be removed and replaced to ensure structural integrity and operational reliability. Wildlife hazard mitigation measures involve removing turf edge dams along runways, taxiways, and access roads, installing anti-perching devices on signs to deter birds, and addressing ponding issues through regrading and new storm drainage infrastructure. Additionally, deteriorating flush fire hydrant access hatches will be replaced to ensure rapid access for emergency response teams. The project is categorized under NAICS code 237990 and falls under the Aviation Project Management Group, with the Port of Seattle as the overseeing agency. The solicitation is posted as a forecast with no set-aside classification, indicating it is open to all eligible contractors. Primary point of contact for inquiries is Yanet Maldonado, reachable via email or phone, and additional details can be accessed through the provided portal link. The project is anticipated to begin after the posted date in July 2026, with all work taking place at the airport facility.
Aviation Project Management Group

POSTED

12 minutes ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
EXT REC | CMD Micro-Set-Aside - CON27-0005 GGP ADA
Solicitation # CON27-0005
This contract is a Micro Local Business Enterprise (LBE) Set-Aside solicitation for the GGP ADA Parking Project under identification CON27-0005, with a cost estimate of $550,000. Only firms certified as Micro-LBEs by the City and County of San Francisco’s Office of Economic and Workforce Development are eligible to bid, and the winning bidder must self-perform at least twenty-five percent of the total contract value. While subcontracting to other Micro-LBEs is encouraged, it is not required. The project falls under the Neighborhood LBE Pilot Program, which provides additional bid discounts to firms whose principal place of business is within Supervisorial District 1 and the specified zip code of 94121, where the work will be performed in Golden Gate Park. The project is governed by the Administrative Code provision 14B.7(K), requiring certification alignment with contractor licensing standards. The pre-bid meeting will be held on August 6, 2026, at the corner of Martin Luther King Dr. and Hagiwara Tea Garden Drive, and all inquiries must be submitted by August 13, 2026. Bids are due by August 27, 2026, at 2:30 p.m., and must be submitted electronically. The contract is administered by the San Francisco Recreation and Parks Department, with designated points of contact for questions and submissions, and is classified under NAICS code 237990 for Other Heavy and Civil Engineering Construction.
San Francisco Recreation and Parks

POSTED

1 day ago

DEADLINE

in 26 days
View Details

More opportunities from Arizona → City Of Yuma

Same awarding agency