This Solicitation opportunity from Government of Canada was posted on June 1, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Lac La Biche County - Invitation to Bid - 91 Avenue Connector (Beaverhill Road To 93 Street) Infrastructure Installation

Closed
AB-2026-03658International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
Call 010 B1CBA2602088-0
Solicitation # B1CBA2602088-0
Solicitation B1CBA2602088-0, issued by the Georgia Department of Transportation (GADOT), involves the widening and reconstruction of 0.284 miles of SR 124 (Braselton Hwy) at Hamilton Mill Road and Hamilton Mill Parkway in Gwinnett, Georgia. The project scope requires the contractor to provide all machinery, tools, and materials necessary to add an additional lane, with a scheduled completion date of July 31, 2028. Key deliverables include an ITS Project Management Plan, staging and temporary traffic control plans, and as-built plans. The work must adhere to the 2021 Standard Specifications and 2024 Supplemental Specifications, with specific technical requirements for micropiles, asphalt mix designs, and ITS hardware. The contract is subject to various federal and state regulations, including the Davis-Bacon Act for labor standards, the Buy America preference for steel and iron, and the Americans with Disabilities Act (ADA). Compliance with nondiscrimination and equal opportunity laws is mandatory, and contractors must certify they are not debarred or suspended via SAM.gov. While the required Disadvantaged Business Enterprise (DBE) goal is set at 0%, the contract maintains strict inspection and acceptance criteria, with final acceptance contingent upon the receipt and transfer of all warranties to GADOT. Proposals must be submitted using the Proposal Schedule of Items and remain valid for thirty calendar days following the opening date.
GADOT

POSTED

about 3 hours ago

DEADLINE

in about 10 hours
NAICS: 237310
New
SLED
Call 009 B1CBA2601755-0
Solicitation # B1CBA2601755-0
Solicitation B1CBA2601755-0, issued by the Georgia Department of Transportation (GDOT), is for a construction project in Fulton County involving 3.087 miles of milling and plant mix resurfacing on SR 70, extending from east of the Cedar Branch Creek bridge to east of SR 154. The scope of work includes traffic control, recycled asphalt concrete patching and superpave, tack coat application, asphalt pavement milling, and the installation of white and yellow wet weather thermoplastic traffic stripes and various raised pavement markers. The complete contract is scheduled for completion by July 31, 2027, with a bid opening date of August 21, 2026. The contract is subject to stringent federal and state regulations, including the Davis-Bacon Act for labor standards, 49 CFR Part 26 for Disadvantaged Business Enterprise (DBE) participation, and Title VI of the Civil Rights Act of 1964. Bidders must submit a Request For Eligibility To Bid by noon the day preceding the letting to be eligible. Award eligibility is based on bidder responsibility and responsiveness, with a requirement to submit supporting documentation within three working days following the bid opening. Compliance with these certifications and the submission of weekly certified payrolls are mandatory, as breaches of these stipulations may result in the withholding of progress or final payments.
GADOT

POSTED

about 3 hours ago

DEADLINE

in about 6 hours
NAICS: 237310
New
SLED
Call 012 B1CBA2602578-0
Solicitation # B1CBA2602578-0
The Georgia Department of Transportation (GDOT) is soliciting proposals for project M006688, which involves 4.390 miles of milling, inlay, and plant mix resurfacing on SR 31, extending from the south end of the I-16/SR 404 bridge to SR 26 in Laurens County. The scope of work includes extensive pavement activities such as recycled asphalt concrete patching and Superpave application, as well as the installation of various thermoplastic and reflective pavement markings and raised markers. Additionally, the contract incorporates Intelligent Transportation Systems (ITS) specifications, requiring the delivery of NEMA TS 4 compliant LED display matrices, IP-based CCTV cameras, wireless communication systems, and mobile Environmental Sensor Stations (ESS). The contract is scheduled for completion by July 31, 2027, with a specific 60-calendar day timeframe associated with the completion of paving operations. Compliance with federal and state regulations is mandatory, including the Davis-Bacon Act, the Americans with Disabilities Act, and Georgia's E-Verify requirements. Quality standards are strictly enforced, requiring ISO 9001 or Six Sigma certification and third-party laboratory testing for ITS equipment. Acceptance is contingent upon a field test and a minimum 30-day burn-in period. Bidders must submit eligibility forms to the GDOT Office of Construction Bidding Administration by 12:00 p.m. the day preceding the August 21, 2026, letting date to avoid being rendered non-responsive.
GADOT

POSTED

about 3 hours ago

DEADLINE

in about 6 hours
NAICS: 237310
New
SLED
Call 005 B1CBA2602556-0
Solicitation # B1CBA2602556-0
The Georgia Department of Transportation is soliciting bids for the construction of a roundabout at the intersection of US 41/SR 247 and Anthony Road (CR 5104 and CR 5481) in Bibb County, with a contract completion deadline of March 31, 2029. The project involves comprehensive roadway construction including grading, base and pavement installation with recycled asphalt concrete, curb and gutter placement, storm drainage systems, sanitary sewer and force main modifications, temporary and permanent traffic control, and installation of various traffic control devices including thermoplastic striping and raised pavement markers. Advanced transportation systems are also part of the scope, requiring installation of ESS environmental and pavement sensors, a wireless communications network supporting PtP, PtMP, and repeater configurations, and a sliding gate system with EAG mechanical components. All materials must meet strict specifications, including delivery in labeled 50-pound containers, proper preservation and handling of reinforcement steel, and end-cap protection for cable ends. The project adheres to multiple regulatory standards, including USDA, ASTM, AWWA, ANSI, GDOT Utility Accommodation Policy, and Georgia EPD guidelines, with precise acceptance criteria for micropiles, ride quality, and bridge bearing elevations. Contract compliance is governed by federal and state requirements including Davis-Bacon prevailing wage regulations, Buy America mandates for all permanently installed materials, and strict non-discrimination provisions under Title VI of the Civil Rights Act, ADA, and equal employment opportunity laws. The contractor must submit a 5% proposal guaranty and a state-approved contract bond to ensure work completion and material quality. DBE participation requirements apply if a goal is set, necessitating submission of proposed DBE participants with the bid. Prompt payment clauses mandate that subcontractors be paid within ten calendar days of the prime contractor’s receipt of payment, and all bids must include certifications addressing debarment status, lobbying activity, boycott of Israel prohibitions under Georgia law, non-collusion, and sexual harassment prevention. Payment for materials is tied to e-Ticket documentation, and as-built plans, GPS coordinates, and an ITS Project Management Plan must be submitted within 30 days of installation completion. Bids must be submitted by August 21, 2026, to the Georgia DOT bidding office in Atlanta, and failure to satisfy any certification or regulatory requirement renders a bid non-responsive.
GADOT

POSTED

about 3 hours ago

DEADLINE

in about 10 hours

AI Contract Overview

Show more

The contract involves comprehensive infrastructure upgrades along the 91 Avenue Connector between Beaverhill Road and 93 Street in Alberta, focusing on the replacement and installation of sanitary sewer, storm sewer, watermain, pavement, and associated public works. Key activities include the removal and disposal of existing infrastructure such as 44 meters of 200mm sanitary sewer, 18 meters of 150mm watermain, 16 meters of 525mm storm sewer, over 690 cubic meters of asphalt, and 1,700 cubic meters of gravel base course, along with curb and gutter, walkways, and other utilities. New installations include 198 meters of 300mm PVC sanitary sewer, 203 meters of 300mm C-900 watermain, and 203 meters of Ultra Rib 525mm storm sewer, all installed in shored vertical trenches at depths of 3 to 5 meters. Six new 1,200mm sulfate-resistant manholes, five floating manhole frames, and two additional CB manholes are to be supplied and installed, with connections tied into existing systems and uninterrupted service maintained throughout construction via bypass pumping for both sanitary and stormwater flows. The project also entails significant earthworks, including 7,218 cubic meters of common excavation, 304 meters of ditch construction with erosion control and seeding, over excavation of 200 cubic meters of unsuitable material with replacement using washed rock, and placement of 8,251 cubic meters of clay fill. Sub-grade preparation, geotextile, geogrid, and cement stabilization layers will be installed under new asphalt paving of 5,832 square meters in two lifts. New infrastructure includes 618 meters of concrete walkway, 832 meters of curb and gutter, 12 street lights, and 3,000 square meters of sod, along with 5,000 square meters of topsoil and 2,000 square meters of seeding. Water services are to be maintained through installation of four gate valves, three fire hydrants, and three flush points, while access to residents remains uninterrupted. Two private accesses must be restored to original or better condition, and 874 cubic meters of existing gravel base will be reused where feasible. The work is procured by Lac La Biche County under solicitation number AB-

General Info

Infrastructure installation and upgrades including sewers, watermains, roadworks, and restoration in Lac La Biche.

Agency

Government of Canada → Lac La Biche CountyView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Alberta, CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Lac La Biche County
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → Lac La Biche County
View Agency Profile
Office AddressN/A
Contacts
Amin Augustin Ph.D. P.EngContracting Authority

Full Description

Show more
SUMMARY OF WORK: The major items of work include the following approximate quantities: 1. General requirements including mobilization, de-mobilization and survey layout etc. 2. Remove and dispose of 44m of existing Sanitary Sewer (200mm dia.) 3. Remove and dispose of 3.4 v.m of existing 1 Manholes including Frame and Covers 4. Remove and dispose of 18m existing, 150mm dia. Watermain 5. Remove and dispose of 16m existing, 525mm dia. Storm Sewer 6. Remove and dispose of / submit 1 existing Water Valves (150mm dia.) 7. Remove and dispose of 26m of existing Monolithic Concrete Walkway 8. Remove and dispose of 692m3 existing Asphalt (100mm-120mm depth) 9. Remove and dispose of 1,724m3 existing GBC (up to 300mm depth; subject to site condition and deletion) 10. Remove and dispose of 251m of existing Curb & Gutters 11. 1,443 m3 topsoil and organic material stripping, hauling to the designated area (within 1.0km), stockpiling and dispose off (300mm depth; subject to site conditions and deletion) 12. 7,218 m3 Common excavation including cut, fills, compaction, hauling to the designated area (within 1.0km) and stockpiling (subject to site condition and deletion) 13. 304m ditch construction complete including erosion protection, topsoil and seeding (subject to site condition and deletion) 14. Supply & install new 198m of PVC DR35 Sanitary Sewer 300mm dia. (3m-5m depth) – shored vertical trench 15. Supply & install 6 new, 23.6 v.m of sulfate resistance 1,200mm diameter Manholes 16. Supply & install 5 new NF-80 (floating) Manhole’s Frame & Cover c/w Final Grade Adjustment 17. Tie-in 2 connections, 300mm dia. new Sanitary Sewer to existing Manholes 18. Maintain (uninterrupted) sanitary services to all the residents throughout construction and bypass pumping of all sanitary flows including inflow and infiltration and back up pump from start till completion of project 19. Supply & install 8,251m3 clay complete including common excavation, cuts, fills, compaction, hauling and stockpiling (subject to site condition and deletion) 20. Over excavation and disposal of approximately 200m3 of unsuitable material (subject to site condition and deletion) 21. Over excavation and placement of 200m3 of Washed Rock (subject to site condition and deletion) 22. Approximately 100m of Special Foundation (1m wide, 150mm depth concrete subject to site condition and deletion) 23. Supply & install new 203m of Ultra Rib Storm Sewer 525mm dia. (3m-5m depth) – shored vertical trench 24. Tie-in 1 connection 525mm dia. new Storm Sewer to existing Manhole 25. Supply & install 2 new, 8.5 v.m of sulfate resistance 1,200mm diameter CB Manholes 26. Supply & install 5 new 610 CB with 250mm dia. leads complete 27. Supply & install 2 new 900 CB with 450mm dia. leads combined with Trash Rack complete 28. Maintain (uninterrupted) stormwater / drainage throughout construction and bypass pumping of all stormwater / drainage flows and back up pump from start till completion of project 29. Supply & install new 262m of C-900, PVC DR18 Watermain 300mm dia. (3m depth) – shored vertical trench 30. Tie-in 2 connections 300mm dia. new Watermain to existing Watermain complete 31. Supply and install 4 new, 300mm Gate Valve c/w Valve Box complete 32. Supply and install 3 new Fire Hydrant, Valve and Lead complete 33. Supply and install 3, 50mm dia. new Flush Point with plug complete 34. Maintain (uninterrupted) water supply to all the residents throughout construction 35. Supply and install 1,060m3 Sub-Grade Preparation (150mm depth; subject to site condition and deletion) 36. Reuse and install 874m3 existing road’s Gravel Base Course (GBC; 300mm depth; subject to site condition and deletion) 37. Supply and install 2,121m3 new Gravel Base Course (GBC; 300mm depth; subject to site condition and deletion) 38. Supply and install 5,832m2 of new Hotmix Asphalt Concrete Paving (120 mm depth; two lifts; 70mm and 50mm; subject to site condition and deletion) 39. Supply and install 5,832m2 of Cement Stabilization (25Kg/m2/300mm) 40. Supply and install 7,068m2 of Geotextile (16oz/yd2; subject to site condition and deletion) 41. Supply and install 7,068m2 of Geogrid (subject to site condition and deletion) 42. Maintain (uninterrupted) access to all the residents throughout construction 43. Restore (supply & install complete) 2 existing Private Access to its original or better conditions 44. Supply and install 12 new Cobra Head Street Lights complete (subject to site condition and deletion) 45. Supply and install new 618m, 1.5m wide Concrete Walkway 46. Supply and install new 832m of 150 Curb & 250mm Gutter (straight face) 47. Supply and install 5,000m2 of new Topsoil (100 mm depth; subject to site condition and deletion) 48. Supply and install 2,000m2 Seeding (subject to site condition and deletion) 49. Supply and install new 3,000m2 Sod (subject to site condition and deletion)