Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 8 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Government of Canada was posted on May 8, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Lac La Biche County - Invitation to Bid - 91 Avenue Connector (Beaverhill Road To 93 Street) Infrastructure Installation

Closed
AB-2026-03658Canada

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
Call 001 612187-134319The project involves the design-build replacement of Bridge C-13-038 over State Route 116 (Chicopee Street) in District 2, Massachusetts, under procurement by the Massachusetts Department of Transportation (MassDOT). This is a lump sum contract structured as a Best Value Design-Build (BVDB) procurement, where selection is based on the lowest overall value rating—the total price divided by the cumulative technical score. The scope encompasses full civil, structural, traffic, stormwater, environmental, and utility coordination, including demolition of the existing bridge, new construction, temporary traffic control, public outreach, asbestos inspection and testing, and invasive species management. All unit prices are defined as all-inclusive, covering design, engineering, project management, quality control, equipment, transportation, installation, utilities, insurance, bonds, and warranty. The contract requires submission of both a technical proposal capped at 40 pages and a separate price proposal via the Bid Express platform, with a mandatory 5% bid bond. The technical evaluation is weighted 65% toward the design-build technical approach and 35% toward project management and coordination, with strict pass/fail gates for submission compliance, proper organization, and bid bond submission. The project must be completed within 2,039 calendar days from the anticipated Notice to Proceed date of December 8, 2026, with adjustments allowed if the completion date falls between December 1 and March 15. MassDOT mandates strict adherence to state laws, including MGL Chapter 149A (public construction labor standards), Chapter 268A (conflict of interest), and Chapter 30, §39M1/2 and §151/2 (procurement compliance). The contractor must implement a comprehensive Quality Control System with dedicated full-time managers for design, construction, and fabrication oversight, including independent oversight at fabrication plants beyond the fabricator’s own program. Non-conformance reports must be mitigated through defined procedures. Affirmative Action and Equal Employment Opportunity compliance is required, with firms of 50 or more employees and contracts over $50,000 needing an approved affirmative action plan on file with MassDOT. Disadvantaged Business Enterprise participation must be actively pursued. The contractor is responsible for all bonding, including performance and payment bonds for the full contract amount, and must comply with insurance and risk management standards. All documentation, including escrowed proposal materials, must be certified as complete and used solely
MASSDOT

POSTED

in about 2 months

DEADLINE

in about 2 months

AI Contract Overview

Show more

The contract involves comprehensive infrastructure upgrades along the 91 Avenue Connector between Beaverhill Road and 93 Street in Alberta, focusing on the replacement and installation of sanitary sewer, storm sewer, watermain, pavement, and associated public works. Key activities include the removal and disposal of existing infrastructure such as 44 meters of 200mm sanitary sewer, 18 meters of 150mm watermain, 16 meters of 525mm storm sewer, over 690 cubic meters of asphalt, and 1,700 cubic meters of gravel base course, along with curb and gutter, walkways, and other utilities. New installations include 198 meters of 300mm PVC sanitary sewer, 203 meters of 300mm C-900 watermain, and 203 meters of Ultra Rib 525mm storm sewer, all installed in shored vertical trenches at depths of 3 to 5 meters. Six new 1,200mm sulfate-resistant manholes, five floating manhole frames, and two additional CB manholes are to be supplied and installed, with connections tied into existing systems and uninterrupted service maintained throughout construction via bypass pumping for both sanitary and stormwater flows. The project also entails significant earthworks, including 7,218 cubic meters of common excavation, 304 meters of ditch construction with erosion control and seeding, over excavation of 200 cubic meters of unsuitable material with replacement using washed rock, and placement of 8,251 cubic meters of clay fill. Sub-grade preparation, geotextile, geogrid, and cement stabilization layers will be installed under new asphalt paving of 5,832 square meters in two lifts. New infrastructure includes 618 meters of concrete walkway, 832 meters of curb and gutter, 12 street lights, and 3,000 square meters of sod, along with 5,000 square meters of topsoil and 2,000 square meters of seeding. Water services are to be maintained through installation of four gate valves, three fire hydrants, and three flush points, while access to residents remains uninterrupted. Two private accesses must be restored to original or better condition, and 874 cubic meters of existing gravel base will be reused where feasible. The work is procured by Lac La Biche County under solicitation number AB-

General Info

Infrastructure installation and upgrades including sewers, watermains, roadworks, and restoration in Lac La Biche.

Agency

Government of Canada → Lac La Biche County

NAICS

237310 - Highway, Street, and Bridge Construction View NAICS

Place of Performance

Alberta, CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Lac La Biche County
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → Lac La Biche County
Office AddressN/A
Contacts
Amin Augustin Ph.D. P.EngContracting Authority

Full Description

Show more
SUMMARY OF WORK: The major items of work include the following approximate quantities: 1. General requirements including mobilization, de-mobilization and survey layout etc. 2. Remove and dispose of 44m of existing Sanitary Sewer (200mm dia.) 3. Remove and dispose of 3.4 v.m of existing 1 Manholes including Frame and Covers 4. Remove and dispose of 18m existing, 150mm dia. Watermain 5. Remove and dispose of 16m existing, 525mm dia. Storm Sewer 6. Remove and dispose of / submit 1 existing Water Valves (150mm dia.) 7. Remove and dispose of 26m of existing Monolithic Concrete Walkway 8. Remove and dispose of 692m3 existing Asphalt (100mm-120mm depth) 9. Remove and dispose of 1,724m3 existing GBC (up to 300mm depth; subject to site condition and deletion) 10. Remove and dispose of 251m of existing Curb & Gutters 11. 1,443 m3 topsoil and organic material stripping, hauling to the designated area (within 1.0km), stockpiling and dispose off (300mm depth; subject to site conditions and deletion) 12. 7,218 m3 Common excavation including cut, fills, compaction, hauling to the designated area (within 1.0km) and stockpiling (subject to site condition and deletion) 13. 304m ditch construction complete including erosion protection, topsoil and seeding (subject to site condition and deletion) 14. Supply & install new 198m of PVC DR35 Sanitary Sewer 300mm dia. (3m-5m depth) – shored vertical trench 15. Supply & install 6 new, 23.6 v.m of sulfate resistance 1,200mm diameter Manholes 16. Supply & install 5 new NF-80 (floating) Manhole’s Frame & Cover c/w Final Grade Adjustment 17. Tie-in 2 connections, 300mm dia. new Sanitary Sewer to existing Manholes 18. Maintain (uninterrupted) sanitary services to all the residents throughout construction and bypass pumping of all sanitary flows including inflow and infiltration and back up pump from start till completion of project 19. Supply & install 8,251m3 clay complete including common excavation, cuts, fills, compaction, hauling and stockpiling (subject to site condition and deletion) 20. Over excavation and disposal of approximately 200m3 of unsuitable material (subject to site condition and deletion) 21. Over excavation and placement of 200m3 of Washed Rock (subject to site condition and deletion) 22. Approximately 100m of Special Foundation (1m wide, 150mm depth concrete subject to site condition and deletion) 23. Supply & install new 203m of Ultra Rib Storm Sewer 525mm dia. (3m-5m depth) – shored vertical trench 24. Tie-in 1 connection 525mm dia. new Storm Sewer to existing Manhole 25. Supply & install 2 new, 8.5 v.m of sulfate resistance 1,200mm diameter CB Manholes 26. Supply & install 5 new 610 CB with 250mm dia. leads complete 27. Supply & install 2 new 900 CB with 450mm dia. leads combined with Trash Rack complete 28. Maintain (uninterrupted) stormwater / drainage throughout construction and bypass pumping of all stormwater / drainage flows and back up pump from start till completion of project 29. Supply & install new 262m of C-900, PVC DR18 Watermain 300mm dia. (3m depth) – shored vertical trench 30. Tie-in 2 connections 300mm dia. new Watermain to existing Watermain complete 31. Supply and install 4 new, 300mm Gate Valve c/w Valve Box complete 32. Supply and install 3 new Fire Hydrant, Valve and Lead complete 33. Supply and install 3, 50mm dia. new Flush Point with plug complete 34. Maintain (uninterrupted) water supply to all the residents throughout construction 35. Supply and install 1,060m3 Sub-Grade Preparation (150mm depth; subject to site condition and deletion) 36. Reuse and install 874m3 existing road’s Gravel Base Course (GBC; 300mm depth; subject to site condition and deletion) 37. Supply and install 2,121m3 new Gravel Base Course (GBC; 300mm depth; subject to site condition and deletion) 38. Supply and install 5,832m2 of new Hotmix Asphalt Concrete Paving (120 mm depth; two lifts; 70mm and 50mm; subject to site condition and deletion) 39. Supply and install 5,832m2 of Cement Stabilization (25Kg/m2/300mm) 40. Supply and install 7,068m2 of Geotextile (16oz/yd2; subject to site condition and deletion) 41. Supply and install 7,068m2 of Geogrid (subject to site condition and deletion) 42. Maintain (uninterrupted) access to all the residents throughout construction 43. Restore (supply & install complete) 2 existing Private Access to its original or better conditions 44. Supply and install 12 new Cobra Head Street Lights complete (subject to site condition and deletion) 45. Supply and install new 618m, 1.5m wide Concrete Walkway 46. Supply and install new 832m of 150 Curb & 250mm Gutter (straight face) 47. Supply and install 5,000m2 of new Topsoil (100 mm depth; subject to site condition and deletion) 48. Supply and install 2,000m2 Seeding (subject to site condition and deletion) 49. Supply and install new 3,000m2 Sod (subject to site condition and deletion)