Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Lake Morena Views Consolidation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Lake Morena Views Consolidation project, managed by the State Water Resources Control Board Division of Financial Assistance under solicitation 3700924-001C, aims to merge the Lake Morena Views Mutual Water Company, Lake Morena's Oak Shores Mutual Water Company Inc., and Lake Morena County Park water systems into a single distribution network in San Diego County. The scope of work includes the installation of transmission and distribution pipelines to connect wells, treatment systems, and storage tanks, as well as the construction of a new office, meeting, and storage area. To enhance system oversight, the project will implement upgraded monitoring and control systems featuring nitrate analyzers, groundwater level sensors, flow meters, and a hard-wired communication system, alongside the installation of new customer water meters across the service areas. The project is governed by the California Environmental Quality Act, having adopted a Mitigated Negative Declaration to address potential impacts on biological resources, hydrology, and noise. Key compliance requirements include the preparation of a Storm Water Pollution Prevention Plan and the submission of a Preliminary Technical Report to the State Water Resources Control Board at least six months before construction begins. All new pipelines must adhere to current Drinking Water Regulations, and contractors must provide certification that any imported materials are free of contamination. The project is led by Environmental Scientist Abbygayle Guevara and is categorized under NAICS code 237110.

General Info

Consolidating three San Diego water systems via new pipelines, facilities, and monitoring systems.

Agency

California → SWRCB, Division of Financial Assistance

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

CA, 91906

Set-Aside

NONE

Documents

(6)

Lake Morena Views Consolidation Project Summary Form

PDFother

Lake Morena Views MWC Notice of Intent to Adopt Mitigated Negative Declaration

PDFnotice-of-intent

Notice of Completion - Lake Morena Views Consolidation Project

PDFnotice-of-completion

Lake Morena Views MWC Initial Study Public Circulation Draft

PDFinitial-study

Notice of Determination for Lake Morena Views Consolidation Project

PDFnotice-of-determination

2026 Environmental Document Filing Fee Cash Receipt - Lake Morena Views Consolidation

PDFreceipt

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → SWRCB, Division of Financial Assistance
Contacts1 person available
OfficeN/A
Organization / Agency
California → SWRCB, Division of Financial Assistance
Office AddressN/A
Contacts
Abbygayle GuevaraEnvironmental Scientist

Interested Companies (1)

Show more
Nv5
Andover, MA

Full Description

Show more
The State Water Resources Control Board (State Water Board) is the Lead Agency for the Project. The Project includes the consolidation of the Lake Morena Views Mutual Water Company (LMVMWC), Lake Morena’s Oak Shores Mutual Water Company Inc. (LMOSMWC), and Lake Morena County Park (LMCP) water systems into a single water distribution system. The Project includes the following: the installation of transmission pipeline to carry water from LMVMWC wells to the LMOSMWC treatment system and tanks, then from the LMOSMWC system to the LMVMWC storage tanks; the installation of distribution pipelines to connect the LMOSMWC distribution system to the existing LMCP distribution system, as well as a transmission pipeline that conveys treated water from LMCP’s Well No. 2 to the existing LMOSMWC tanks or treatment system; the improvements and the replacements of LMVMWC distribution system to eliminate dead ends and to extend to the LMOSMWC water distribution system; and the installation of two pressure-reducing stations and appurtenant facilities. Monitoring and controls system of the consolidated water system will be improved through additional analyzers (nitrate), groundwater level sensors, flow meters, storage tank water level sensors, and a hard-wired communication system. New customer water meters will be installed throughout the existing LMOSMWC and LMVMWC service areas. Approximately three water meters will also be installed to supply LMCP. Minor improvements will be made to LMOSMWC’s well sites and to its treatment facility site, in addition to the capacity expansion

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements (Redesign) Project in Kerman, California. This comprehensive infrastructure project involves the demolition of existing facilities and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening and compaction units, a new influent eccentric manhole, a flow meter vault, and the replacement of influent pumps and surface aerators. Additionally, the scope covers the installation of a sludge dewatering pipeline and ponds, a reinforced concrete pad for an emergency generator, and a new CMU operations and electrical building equipped with HVAC and plumbing. The project also requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as asphalt resurfacing, grading, and piping. This opportunity is open to small businesses and certified disadvantaged, minority, and women-owned business enterprises across a wide range of NAICS codes related to heavy and civil engineering construction. Interested parties must submit their responses by October 21, 2026, and can coordinate with the primary point of contact, Christina Pauls.
GSE Construction Co., Inc.

POSTED

about 9 hours ago

DEADLINE

in 29 days
View Details
NAICS: 237110
New
JCSD Intervalley Pipeline Project; PN C155003
Solicitation # PN C155003
The Jurupa Community Services District Intervalley Pipeline Project, solicitation number PN C155003, involves the installation of 3.3 miles of potable water transmission pipeline located on Country Village Road in Jurupa, California. Managed by Filanc, the project has an engineer's estimate of 36,000,000 dollars and is subject to American Iron and Steel (AIS) and Build America, Buy America (BABA) requirements. The scope of work is comprehensive, encompassing pipeline infrastructure such as valves, welding, cathodic protection, jack and bore, and precast vaults, as well as civil works including paving, striping, flatwork, fencing, and potholing. Technical services required include videography, testing and inspections, settlement monitoring, survey, and E&IC, alongside compliance tasks such as SWPPP, traffic control, and asbestos pipe demolition and removal. The solicitation is open to a wide range of small business set-asides, including SDB, WOSB, HUBZone, and Veteran-owned businesses, with a strong emphasis on the participation of SBE, MBE, and WBE firms. Filanc has committed to providing assistance to qualified small businesses regarding bonding, insurance, credit lines, and equipment to encourage diverse subcontracting. Bids for the various project scopes are due by September 23, 2026. Interested parties can obtain plans and specifications through the primary point of contact, Julia Masaitis.
Filanc

POSTED

about 9 hours ago

DEADLINE

in about 23 hours
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, involves extensive infrastructure installation for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project also requires the installation of various large-diameter valves, including contractor-furnished valves and Metropolitan-furnished 54-inch and 132-inch valves, along with 54-inch and 145.5-inch diameter tie-ins and associated fittings. Additional construction requirements include the installation of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The project encompasses electrical upgrades, instrumentation and controls, piping systems, the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation, issued by James W. Fowler Co., is open to small businesses, including SDVOSB, MBE, and WBE certified firms, with a response deadline of September 29, 2026. The prime contractor encourages M/W/DBE participation and the use of apprentices, offering assistance with bonding, insurance, and materials to qualified subcontractors.
James W. Fowler Co.

POSTED

about 9 hours ago

DEADLINE

in 7 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS