Lampasas Ave & Rio Linda Blvd Project

Closed
B2715111101State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment
Solicitation # HD-S3135
Kiewit Infrastructure West Co. is soliciting quotes for the Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment project in Long Beach, California. This heavy civil infrastructure project encompasses a broad scope of work, including site preparation, earthwork, asbestos abatement, tunneling, utility installation, paving, and electrical systems. The solicitation specifically targets qualified Small Business Enterprises, Veteran-Owned Small Business Enterprises, and Disadvantaged Business Enterprises, requiring SBE and VSBE firms to provide certification from the Department of General Services and the Port of Long Beach via the PlanetBids portal. The project is subject to the California Labor Code, prevailing wage rates, and a Project Labor Agreement. Firms performing onsite work must be signatory to collective bargaining agreements with specific trades or demonstrate the ability to maintain labor harmony. Funding is provided through multiple grants, including FHWA, LACMTA, the State of California Transportation Agency, and the U.S. DOT MARAD, necessitating compliance with DBE Program requirements. Responsive bidders must hold a valid California Contractor’s license, provide acceptable insurance, and may be required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Interested firms must coordinate through the BuildingConnected system by the September 15, 2026, deadline.
Kiewit Infrastructure West Co.

POSTED

about 13 hours ago

DEADLINE

in 3 days
NAICS: 237310
New
SLED
NH-093-1(035) Farrington Highway Widening
Solicitation # B27000387
The Farrington Highway Widening project, solicitation B27000387, is an invitation for bids issued by the Hawaii Department of Transportation to develop an auxiliary lane between Nanakuli Avenue and Mohihi Street in the District of Ewa, Oahu. The scope of work includes excavation, cold-planing, paving, striping, signage, drainage structure modifications, and the installation of retaining walls. The estimated construction cost is between 35 million and 37 million dollars, with a performance period of 780 calendar days from the start work date. Bidders must hold a valid State of Hawaii General Engineering A license and submit their proposals via HiePRO by October 28, 2026. The contract will be awarded to the lowest responsible and responsive bidder based on the summation of unit bid prices and approximate quantities. Key requirements include the submission of a surety bid bond for proposals exceeding 25,000 dollars, as well as performance and labor and material payment bonds. The project adheres to federal and state regulations, including the Davis-Bacon Act, the Build America, Buy America Act, and Hawaii Revised Statutes Chapter 103D. Contractors are required to comply with strict prompt payment terms, paying subcontractors within 10 calendar days of receiving progress payments from the agency. Final acceptance is determined by the Engineer based on full compliance with contract documents, including specific quality standards for pavement smoothness and compaction.
Department of Transportation

POSTED

about 19 hours ago

DEADLINE

in about 2 months
NAICS: 237310
New
SLED
FY 2027 Patching and Repair Project
Solicitation # PE-66204-NONST-2027-000000005
The FY 2027 Patching and Repair Project is a unit price contract issued by the City of Walnut Grove, Georgia, for asphalt patching and mill, patch, and inlay services. The scope of work includes providing all labor, materials, and equipment necessary for repairs at various locations, such as Greenhill Way, Valley Drive, Woodland Circle, and Walnut Court. Key technical requirements include the use of asphalt containing hydrated lime and adherence to GDOT 652 and 653 standards for striping and marking, as well as MUTCD Chapter 6 for temporary traffic control. The contract term is 180 calendar days from the notice to proceed, with a mobilization period of 60 business days. Work is restricted to between 7:00 AM and sundown on weekdays, with specific restrictions for residential areas on weekends and a total prohibition of work on Sundays and select holidays. The contract will be awarded to the lowest responsible bidder who is prequalified by the Georgia Department of Transportation. Bidders must submit a comprehensive proposal including a 5% bid bond, bidder qualifications, and proof of insurance. The successful contractor is required to provide a 100% performance-payment bond and a certificate of insurance naming the City of Walnut Grove as additionally insured within seven days of the award. Payments are processed monthly based on certified invoices for services performed and accepted. Final payment is contingent upon the submission of all test results, including cores and photo reports, and the completion of a final site cleanup.
City of Walnut Grove

POSTED

about 21 hours ago

DEADLINE

in about 1 month
NAICS: 237310
New
SLED
MS1-00005 Massachusetts St 14th St to 23rd St Multimodal Improvements Project
Solicitation # 2600030
The MS1-00005 Massachusetts St 14th St to 23rd St Multimodal Improvements Project is a construction solicitation issued by the City of Lawrence, Kansas, with a response deadline of October 13, 2026. The project focuses on street maintenance and reconstruction, featuring the installation of 8,000 square yards of concrete separated bike lanes, pavement reconstruction via milling and overlay, storm sewer improvements, and the replacement of sidewalks, including two blocks of 5-foot-wide sidewalk infill. Additional work includes improvements at the 19th and Mass Streets intersection and partial disturbance of a 16-foot-wide grass planter strip. Contractors must coordinate concurrent relocation efforts with AT&T and Black Hills Energy, who are permitted to operate within the contractor's temporary traffic control. The contract requires substantial completion within 340 calendar days and final completion within 365 calendar days of the Notice to Proceed. Bidders must provide an electronic bid bond of at least 5 percent of the bid amount and are subject to KDOT required documents, Davis-Bacon and Related Acts, and Buy America domestic steel requirements. Evaluation for award considers total cost, bidder location, and Disadvantaged Business Enterprise participation efforts. Technical standards include NEMA TS-1 for traffic signals and NSF 61 for potable water materials. Payment is structured through a mix of unit pricing and lump sum for demolition, with payments due within 30 days after completion. Final acceptance by the City is followed by a joint inspection 11 months later.
MSO - CMED

POSTED

about 21 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The Lampasas Ave at Rio Linda Blvd Intersection Safety Improvements Project is a municipal infrastructure initiative led by the City of Sacramento’s Department of Public Works, Engineering Services, aimed at enhancing intersection safety and multimodal mobility. The scope includes reconfiguring vehicle turning movements, installing ADA-compliant curb ramps and median refuge islands, implementing rectangular rapid flashing beacons, and restriping the roadway between Del Paso Blvd and Eleanor Ave to reduce travel lanes and introduce a dedicated bike lane. All work must comply with the City of Sacramento Standard Specifications, November 2020 edition, including Addendum #1 from March 2025, as well as Caltrans Standard Specifications and Standard Plans. The project is subject to Buy America requirements under the Surface Transportation Assistance Act of 1982, as amended by MAP-21, mandating that all materials and components be manufactured in the United States. A 10% bid bond is required, and the contractor must commence work within 15 calendar days of the Notice to Proceed, completing all construction within 95 working days. The contractor is responsible for furnishing all labor, materials, equipment, and transportation in a workmanlike manner, adhering strictly to approved plans and special provisions. Compliance obligations extend to labor, environmental, and administrative requirements under federal and state regulations. The contractor must adhere to Davis-Bacon Act wage requirements, submit certified weekly payrolls via LCPTracker, and ensure all subcontractors comply with drug-free workplace policies, nondiscrimination rules, and EEO obligations. Disadvantaged Business Enterprise participation goals apply, and documentation of good faith efforts to meet those goals must be maintained. All materials, including conductors AWG #10 or larger, require permanent labeling with silkscreened or phenolic screw-on labels using Times New Roman font, and must include UL listing, voltage rating, AWG size, and City of Sacramento identification, labeled every foot along the conductor. No adhesive or sticker labels are permitted. Inspection and acceptance occur on-site by the City’s Engineer, with non-compliant work subject to removal and replacement at the contractor’s expense. The contractor must retain records related to payrolls, DBE participation, safety training, and subcontractor compliance for the duration of the contract and for three years after final acceptance. While no formal FAR clauses are cited, the contract includes locally drafted provisions on anti-retaliation, subcontracting restrictions, C&D debris recycling, insurance, and general contract terms. The solicitation number is B2

General Info

Sacramento installs safety upgrades at Lampasas Ave and Rio Linda Blvd with Buy America compliance, ADA features, bike lane, and strict labor and material requirements.

Agency

California → Public Works Dept - Engineering Services Department of City of SacramentoView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

915 I Street, Room 2000 Sacramento, California 95814, CA, USA

Set-Aside

NONE

Documents

(2)

T15205500 Lampasas 100 Plan - Signing and Stripping Notes

PDFspecifications

Lampasas Ave at Rio Linda Blvd Intersection Safety Improvements Project Bid Package

PDFrfp

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Contract opportunity posted

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Public Works Dept - Engineering Services Department of City of Sacramento
Contacts1 person available
OfficeCA, USA
Organization / Agency
California → Public Works Dept - Engineering Services Department of City of Sacramento
View Agency Profile
Office AddressCA, USA
Contacts
James KraghContact

Full Description

Show more
Scope: The Lampasas Ave at Rio Linda Blvd Intersection Safety Improvements Project proposes to reconfigure the intersection and vehicle turning movements, upgrade pedestrian crossing improvements including median refuge islands, ADA compliant curb ramps, rectangular rapid flashing beacons (RRFBs), and restripe the roadway between Del Paso Blvd and Eleanor Ave to reduce the number of travel lanes and provide for a bike lane.
Notes: THIS PROJECT IS SUBJECT TO THE “BUY AMERICA” PROVISIONS OF THE SURFACE TRANSPORTATION ASSISTANCE ACT OF 1982 AS AMENDED BY MAP-21. AS SUCH, THE CONTRACTOR SHALL COMPLY WITH ALL BUY AMERICA REQUIREMENTS STATED IN THE SPECIAL PROVISIONS AND THE TECHNICAL SPECIFICATIONS.
Bid Bond: 10.00%

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS