Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 8 at 2:00 PM EDT

Register Free →

Laura Lake Solar Well Installation

Active
AG-569R-S-17-0033Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of Agriculture → Usda-fs Pps Incident ProcurementView Agency

NAICS

237110 - Water and Sewer Line and Related Structures Construction View NAICS

Place of Performance

Chequamegon-Nicolet National Forests Wisconsin, ID, USA

Set-Aside

SBA

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

2 updates
PhaseSolicitation
Amendment 1

Contract was updated

Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Amendment 3

Contract was updated

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Usda-fs Pps Incident Procurement
Contacts2 people available
OfficeBoise, ID, 837055354, USA
Organization / Agency
Department Of Agriculture → Usda-fs Pps Incident Procurement
View Agency Profile
Office AddressBoise, ID, 837055354, USA
Contacts
Tamie ThompsonContract Specialist
Michelle BernardCivil Engineer

Similar Contracts

NAICS: 237110
New
SLED
Hickory Street 24-Inch Water Transmission Main Replacement ProjectThe East Larimer County Water District is seeking qualified contractors to rehabilitate or replace approximately 2,500 linear feet of a 24-inch ductile iron water transmission main located west of College Avenue along Hickory Street in Fort Collins, Colorado. Constructed in 1978, the pipeline has suffered multiple breaks over the past five years due to external corrosion, prompting the need for a durable solution that meets current American Water Works Association standards and ensures reliable service for the district’s 25,000 customers. The project requires the complete removal and replacement or rehabilitation of the pipeline segment, including installation of a new blowoff valve and air release valve, hydrostatic testing, disinfection, tie-ins, traffic management, and full surface restoration in compliance with ELCO and AWWA specifications. Contractors must propose solutions capable of providing at least an additional century of service life using materials and technologies that satisfy the RFP’s minimum requirements. The solicitation, titled Hickory Street 24-Inch Water Transmission Main Replacement Project and numbered 2026-1A, was posted on June 26, 2026, with proposals due by August 7, 2026. ELCO, established in 1962 to serve rural areas north and east of Fort Collins, operates over 275 miles of water infrastructure and is now focused on upgrading aging components to maintain system integrity. The selected contractor will be responsible for both design support and full construction execution, with all work to be performed at the specified location in Colorado. Interested parties must submit proposals through the official portal and direct inquiries to Dave K. Myer, the designated point of contact, via email or phone. The district is seeking technically sound, cost-effective, and long-term solutions to prevent future failures and ensure uninterrupted water delivery to its service area.
East Larimer County Water District

POSTED

2 days ago

DEADLINE

in about 1 month
View Details
NAICS: 237110
New
SLED
Chapel Road Water Main ReplacementThe Chapel Road Water Main Replacement project involves the installation of new ductile iron water mains to replace outdated cast iron infrastructure, spanning from the intersection of Chapel Road and SR 125 to approximately 1,475 feet northeast of Amelia Park Drive. The scope includes approximately 59 linear feet of 6-inch diameter pipe, 128 linear feet of 8-inch diameter pipe, and 4,917 linear feet of 12-inch diameter water main, along with associated services and connections to ensure full water distribution coverage. Nine new fire hydrants will be installed along the alignment to enhance public safety and fire protection capabilities within the area. The work necessitates careful coordination with existing utilities and infrastructure, with all materials and installation methods complying with current engineering standards for durability and operational reliability. The project is solicited under RFB-6401-60234-0-2026/MS by the Clermont County Board of Commissioners in Ohio, with bids due by August 6, 2026. The solicitation is open to eligible contractors under a state and local government procurement process, though no specific set-aside provisions are indicated. Performance is expected to occur entirely within Clermont County, Ohio, and no point of contact information is provided in the solicitation details. Interested parties must review the full solicitation on the DemandStar portal to understand all technical specifications, compliance requirements, and submission guidelines before the deadline.
Clermont County - Board of Commissioners

POSTED

2 days ago

DEADLINE

in about 1 month
View Details