This Solicitation opportunity from Pennsylvania was posted on October 6, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Laurel Run PS Pump Replacement and Improvements
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Laurel Run Pump Station Pump Replacement and Improvements Project for the Muhlenberg Township Authority in Berks County, Pennsylvania, involves comprehensive mechanical, structural, and electrical upgrades. The scope of work is divided into three contracts covering general, electrical, and HVAC and plumbing services. Key deliverables include replacing sewage pumps and motors with 110 horsepower units featuring variable speed drivers, installing a new pump control system, replacing the emergency generator, and adding new channel grinders and bypass piping connections. Structural improvements encompass the replacement of the roof, windows, doors, and hatches, as well as the installation of a new air handling system and a hoist. Electrical work includes all necessary wiring and lighting to power the new equipment. The project also requires miscellaneous site improvements, such as tree removal and the application of specialized coatings to floors and walls. Bids must be submitted electronically via the PennBid program by 11:00 AM local time on November 4, 2026, and must include a bid security of at least ten percent of the bid amount. The contract will be awarded to the responsible bidder submitting the lowest responsive bid. Successful contractors must comply with the Commonwealth of Pennsylvania Prevailing Wage Act and the Public Works Employment Verification Act. The work must be substantially completed within 270 days from the Notice to Proceed, noting that pump equipment has an estimated lead time of 24 to 28 weeks. The project is governed by EJCDC Standard General Conditions and requires performance and payment bonds, as well as adherence to specific Water Quality Management and GP-11 permits.
General Info
Place of Performance
Set-Aside
Documents
11AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 12 days
- Lift Station No. 85 ReplacementOpen now, due in 23 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Solicitation number changed from Muhlenberg Township Authority, Berks County to 256655. The notice description changed.
Deadline has passed
Submission Closed
Organization & Contact Information
Interested Companies (150)
See All 150 Interested Companies
Get full access to view all interested companies, their contact details, and full contractor profiles.
Full Description
Sealed Bids will be received online by Muhlenberg Township Authority until 11:00 AM local time on November 4, 2026. A pre-bid meeting is to be scheduled at a later date. Online bids shall be submitted by way of the PennBid Program. Paper bids will not be accepted for this project. All documents and solicitation details are available online at no cost except to the successful bidder at PennBid – https://pennbid.bonfirehub.com/. Bidders assume responsibility that their Bid is received prior to the designated bid opening time and date.
The Work to be performed for the project includes supplying all labor, equipment, and materials necessary for the Laurel Run Pump Station Pump Replacement and Improvements Project for the Muhlenberg Township Authority. The Work generally consists of the replacement of existing sewage pumps and motors to include new pumps with variable speed drivers, a new pump control system, replacing the emergency generator, new channel grinders, the addition of new bypass piping connections, and removal of the old generator and associated equipment. Structural improvements include roof, window, door and hatch replacement, installing a hoist, generator platform modifications, and furnishing and installation of a new air handling system. Electrical improvements include wiring, lighting, and electrical work associated with powering and controlling the new equipment. The project also includes miscellaneous site improvements. The Work must be substantially completed within two hundred seventy (270) days from the issue of the Notice to Proceed.
Each Proposal for the Project shall be accompanied by a Bid Security in the form provided by the Contract Documents, drawn to the order of the Muhlenberg Township Authority, and in an amount not less than ten percent (10%) of the extended Bid Amount, as a guarantee that if the Proposal is accepted, a Contract will be entered into and the performance thereby properly secured.
Attention is called to the fact that prevailing minimum wage rates as determined by the Secretary of the Department of Labor and Industry must be paid by the Contractors on this project and that employees and applicants for employment shall not be discriminated against because of their race, age, color, religion, sex, national origin, or handicap. Each Bidder is required to meet the requirements of Public Works Employment Verification Act, Act 127 of 2012.
The Muhlenberg Township Authority, Owner, hereby reserves the right, which is understood and agreed to by all bidders, to refuse and reject any or all bids submitted, to waive any informality in bids received, and to accept the Bid, which is in the best interest of the Authority, consistent with the laws affecting municipal contract awards.
More opportunities from Pennsylvania → Berks County
Same awarding agency
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
