Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Subcontract opportunity from California was posted on December 15, 2020. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Lawn Mowing and Turf Maintenance

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 561730
New
SLED
Invasive Plant Control Services
Solicitation # RFP-012-3090502-ST
The County of Orange, through OC Community Resources, is soliciting proposals for Invasive Plant Control Services to protect wildlife habitats and biodiversity across up to 20 park facilities. The scope of work involves treating non-native species in wildland settings using manual removal, mechanical weed removal, and herbicide applications. The project is divided into two regions and is governed by the OC Parks Integrated Pest Management Plan, County Best Management Practices, and a specific Weed Priority List. The contract includes a three-year base term and a two-year option term, with labor and equipment requested on an as-needed basis. Respondents must submit electronic proposals via the County's eProcurement Portal, organized into three parts: Compliance Statements, Company Profile and References, and a Response section limited to 30 pages. Evaluation is based on a points system involving written responses and potential oral interviews, with a preference policy granting a five percent score increase to certified Local Small Businesses (OCLSB) or Disabled Veteran Business Enterprises (DVBE). Key requirements include compliance with California Labor Code prevailing wages, the use of non-toxic dyes for herbicide marking, and strict adherence to site cleanliness and storage regulations. All legal disputes are subject to the exclusive venue of Orange County, California, and the contractor must provide a valid UEI and D-U-N-S number prior to award.
OC Community Resources

POSTED

about 19 hours ago

DEADLINE

in 27 days

AI Contract Overview

Show more

The Lawn Mowing and Turf Maintenance subcontract, managed by the California Public Works agency, covers comprehensive landscaping services for the grounds of Goleta City Hall and the local library. The scope of work includes recurring mowing, edging, aeration, fertilization, and weed control to ensure the upkeep of the facility lawns. This opportunity was posted on December 15, 2020, with a response deadline of January 28, 2021. The contract is categorized under NAICS code 561730, focusing on landscaping services for these specific municipal locations.

General Info

Place of Performance

CA, USA

Set-Aside

NONE

Documents

This scope was carved out of 4-20.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Landscape Maintenance Services for Goleta City Hall and Goleta Library

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Public Works
ContactsNo contacts available
OfficeN/A
Organization / AgencyCalifornia → Public Works
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Recurring mowing, edging, aeration, fertilization, and weed control for lawns at Goleta City Hall and Library grounds.

More opportunities from California → Public Works

Same awarding agency

NAICS: 238210
New
SLED
On-Call Industrial Electricians for Regional Water Quality Control Plant
Solicitation # IFB199384
The City of Palo Alto is soliciting bids for on-call industrial electrical services at the Regional Water Quality Control Plant to maintain equipment that supports wastewater treatment discharging into the South San Francisco Bay. The contract, issued under solicitation IFB199384, requires a contractor with a valid California C10 Electrical Contractor license and experience with systems up to 12kV. The scope of work includes scheduled preventative maintenance, troubleshooting, and 24-hour emergency response for power distribution, motor control centers, VFDs, and standby generators. The anticipated performance period runs from February 1, 2027, to January 30, 2032, with estimated annual needs for 1,100 journeyman and 100 master electrician hours, though the City may authorize expenditures up to 800,000 dollars annually. Awardees must adhere to strict compliance standards, including California Department of Industrial Relations registration and the payment of prevailing wages. Mandatory requirements include providing performance and payment bonds at 100 percent of the contract sum, as well as comprehensive insurance coverage, including Builder's Risk and Pollution Liability. The contract is structured via task orders and includes a 5 percent payment retention. Contractors are responsible for providing labeled wiring and using equipment rated for wet, corrosive, or classified locations. Bids must be submitted electronically by the specified deadline, including a non-collusion declaration and a detailed list of references and key personnel.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

about 16 hours ago

DEADLINE

in 29 days
View Details
NAICS: 237310
New
SLED
West Linda Multi-Use Basin Phase II Project
Solicitation # 3260070
The West Linda Multi-Use Basin Phase II Project (Contract No. 3260070) is a general construction solicitation issued by the Yuba County Public Works agency in California. With an estimated cost of $1,121,293.00, the project involves infrastructure improvements at the West Linda Detention Basin, including the construction of parking lot improvements, a multi-use path, a ramp to the basin, workout and bench areas, storm drains, and landscape enhancements. The work must be performed in accordance with 2025 Caltrans Standard Plans and Yuba County Improvement Standards. The project timeline is divided into three milestones: general work must be completed within 60 working days, plant establishment within 90 working days, and total project completion within 150 working days. Bids are due by 2:00 p.m. on November 19, 2026, and will be awarded to the lowest responsive and responsible bidder. Submissions must be sealed and include a bid bond or cashier's check for 10 percent of the total bid price. The successful contractor is required to provide separate performance and payment bonds, maintain insurance for the contract duration plus five years, and adhere to prevailing wage laws. Key compliance requirements include a Quality Assurance Program for material testing, a Worker Environmental Awareness Program for tribal cultural resources, and strict adherence to environmental commitments regarding dust control and biological protections. There is no DBE goal for this project, and no pre-bid meeting is scheduled.
Highway, Street, and Bridge Construction

POSTED

2 days ago

DEADLINE

in 7 days
View Details
NAICS: 237310
New
SLED
Katella Ave & State College Blvd Rehabilitation Project
Solicitation # RCP2025-23565
The Katella Ave and State College Blvd Rehabilitation Project (RCP2025-23565) is a public works initiative by the City of Anaheim to improve roadway structure and pedestrian safety. The scope of work includes removing and reconstructing asphalt concrete pavement using rubberized asphalt concrete, installing ADA access ramps, sidewalks, curb and gutter, and adjusting utility pull-boxes. The project also encompasses the installation of striping, signage, and pavement markings. Work is located on Katella Avenue from Auburn Way to Douglass Road and State College Boulevard from Katella Avenue to Gene Autry Way. The estimated construction cost has been updated to 5,041,243.00 dollars, with a performance period of 70 working days from the Notice to Proceed. The contract is governed by the 2024 Standard Specifications for Public Works Construction and specific project special provisions. Award will be granted to the lowest responsive and responsible bidder holding a General Engineering (A) license. Bidders must be registered with the Department of Industrial Relations and agree to be bound by the Community Workforce Agreement. Key submission requirements include a 10 percent bid bond, a non-collusion declaration, and the use of the OpenGov portal for proposals. Performance is subject to strict scheduling, with work affecting CALTRANS Right-Of-Way restricted to overnight hours between 10:00 p.m. and 5:00 p.m. Monday through Friday. Final payment is contingent upon the approval of As-Built Plans submitted 21 days prior to the final invoice.
Highway, Street, and Bridge Construction

POSTED

5 days ago

DEADLINE

in 1 day
View Details
NAICS: 561730
New
SLED
Independence Jail Landscaping
Solicitation # ZP 24-020
The Independence Jail Landscaping project, managed by the Inyo County Public Works Department under solicitation ZP 24-020, involves comprehensive landscaping services including excavation, grading, irrigation installation, and planting. The project requires a contractor with at least one year of landscaping experience and a valid CA State License Board number. Key technical requirements include adherence to the Model Water Efficient Landscape Ordinance (MWELO), the provision of a Soil Management Report, and the implementation of an irrigation system with a distribution uniformity low quarter of 0.65 or higher. The contractor is responsible for providing all labor, materials, and equipment, as well as delivering training on planting techniques and ongoing maintenance. All work must comply with the 2010 Americans with Disabilities Act (ADA), Inyo County Public Works Standard Specifications from May 2020, and prevailing wage rates. Bids must be submitted electronically via the OpenGov portal by December 11, 2026. Required submission materials include a bid proposal, vendor certifications, and a proposal guarantee of ten percent of the total bid amount. Upon contract award, the contractor must provide a Faithful Performance Bond and a Labor and Materials Payment Bond, both for 100 percent of the contract amount. The estimated construction cost for the project is 97,140.00. Final acceptance is contingent upon a Certificate of Completion certified by a licensed landscape contractor or architect, supported by as-built drawings, irrigation audit reports, and soil analysis documentation.
Landscaping Services

POSTED

5 days ago

DEADLINE

in about 1 month
View Details
NAICS: 541330
New
SLED
Etnies Skatepark Improvement Project (25P03)
Solicitation # 25P03
The City of Lake Forest is soliciting proposals for the Etnies Skatepark Improvement Project (25P03) to modernize its 62,000 square foot facility. The selected consultant will refine two preliminary concept designs into a final design and prepare a complete, bid-ready Plans, Specifications, and Estimates (PS&E) package. Key project enhancements include the addition of an 8,000 square foot all-wheel pump track, improvements to street lanes, the street plaza, and various bowls, the removal and replacement of the cradle, and the integration of public art. The consultant must coordinate with a separate ongoing project for skatepark building renovations and develop a construction phasing plan that minimizes operational disruptions. Proposals are due by December 4, 2026, and must be submitted via the City's eProcurement portal. The prime consultant can be any qualified firm providing a team with expertise in public skatepark design, municipal civil engineering, and public art. Evaluation is based on a pass/fail review of licenses and conflicts of interest, a qualitative assessment of technical knowledge, and a cost proposal evaluated on a time and materials, not-to-exceed basis. The anticipated project start date is February 9, 2027, with an initial contract term running through January 19, 2030, and options for two additional one-year extensions. Consultants who prepared the preliminary concept designs are ineligible to participate in this phase.
Engineering Services

POSTED

5 days ago

DEADLINE

in 23 days
View Details
NAICS: 237310
New
SLED
Tustin Legacy Linear Park - Phase 3 Between Armstrong to Warner (CIP No. 20083)
Solicitation # CIP 20083
The City of Tustin is soliciting bids for the Tustin Legacy Linear Park Phase 3 project (CIP No. 20083), located between Armstrong and Warner. This construction project involves the development of a multi-modal park featuring a 12-foot main multi-modal path, a 6-foot secondary walking trail, a playground with PIP rubber surfacing, fitness pods, and an Esplanade along Compass Avenue using concrete pavers. Additional scope includes landscaping, irrigation, pedestrian and street lighting, and the implementation of a planted bioretention swale for stormwater management in compliance with Orange County NPDES requirements. The engineer's estimate for the project is 11,100,000 dollars, with a construction duration of 190 working days and a subsequent 90-working-day plant establishment and maintenance period. Bids are due electronically via OpenGov by December 10, 2026, at 2:00 PM PT, with a mandatory hard copy of the bid bond delivered to the City Clerk. The contract will be awarded to the apparent low bidder who meets all responsiveness requirements, including the submission of a Class A contractor's license, project references, and a list of subcontractors for work exceeding 0.5 percent of the total bid. Awarded contractors must provide payment, faithful performance, and guaranty bonds within 10 working days of notification. Payment will be issued through monthly progress payments at 95 percent of the work value, with the final 5 percent retained until 60 days after the recordation of the Notice of Completion. All work must adhere to 2008 ADA Standards for Accessibility and Cal-OSHA safety requirements.
Highway, Street, and Bridge Construction

POSTED

5 days ago

DEADLINE

in 29 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS