Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on November 2, 2011. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

LCC 20 USS Mount Whitney 3-D Space Modeling for SSDG Replacement

Awarded
N00033-12-P-9006Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The Military Sealift Command plans to award a contract to Photo Measurement Solutions, LLC through a non-competitive process to assist with an electrical upgrade on the LCC 20 USS Mount Whitney. This upgrade involves installing two new Ship Service Diesel Generators adjacent to the existing one, requiring significant modifications to the onboard spaces housing the generators and associated exhaust systems. To facilitate this, the contractor will perform professional photogrammetry services to capture a digital photographic survey of six internal ship spaces, which will then be processed into detailed 3-D AutoCAD models. These models must comprehensively represent all aspects within these spaces, including pipes, machinery, bulkheads, wiring, and HVAC ducting. The contractor is required to use a non-targeted data acquisition method that does not interfere with the ship’s operations, personnel, or machinery, given that work will be ongoing during shipyard availability. The photogrammetry equipment must be durable enough to withstand challenging environmental conditions such as high temperatures, vibration, and potential power interruptions. Timely completion is critical, with the contract period culminating by December 30, 2011. Though the contract is set aside for an emerging small business and will be awarded based on FAR criteria, all qualified sources are encouraged to submit proposals or capability statements for consideration.

General Info

Contract awarded to Photo Measurement Solutions for photogrammetry to support USS Mount Whitney generator upgrade.

Contract Value

$52,401

NAICS

541330 - Engineering Services

Place of Performance

VA, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

2 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice description changed.

Justification (J&A)

Justification & Approval published

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Military Sealift Command
Contacts1 person available
OfficeNORFOLK, VA, 23511-2419, USA
Office AddressNORFOLK, VA, 23511-2419, USA
Contacts

Full Description

Show more
Contract N00033-12-P-9006 is a fixed-price Contract awarded to Photo Measurement Solutions, LLC on an other than full and open competition basis in accordance with FAR 13.106-1 (b)(1) for the following requirement: Background: The LCC 20 USS MOUNT WHITNEY will be undergoing an electrical upgrade in which two (2) new Ship Service Diesel Generators (SSDGs) will be installed adjacent to the existing one. Major modifications must be done to the existing spaces on-board the vessel where the SSDGs will be located and where the new exhaust trunks will run. To help plan the modifications of these spaces, MSC requires a 3-D AutoCAD model of the spaces as they exist now. Scope of Work: This task provides for professional photogrammetry services to conduct a digital photographic survey of several internal spaces of the ship, followed by the processing and conversion of those photos to create a 3-D model in AutoCAD format showing the layout of those spaces (to include everything in each space, i.e. pipes, structure, bulkheads, machinery, pumps, tanks, lights, deck, overhead, wiring, HVAC ducting, intake and exhaust piping, etc.). The method the Contractor uses to do this shall not interfere with the operation of the ship, ship's personnel, or running of machinery, as this task will be completed while the ship is undergoing an availability in the shipyard. There will be personnel working in the designated spaces, and they must not be interrupted or interfered with. To ensure this, the Contractor shall use a non-targeted data acquisition process to perform the photogrammetry services; therefore, physical reflective targets used for measurement references (or any other type of physical measurement reference tools) shall not be placed on the objects being measured. Due to the ongoing work being accomplished on-board the ship during the shipyard, there could be high temperatures, excessive vibration variations, or interruption of electrical power that cannot be controlled; therefore, the photogrammetry tools (scanner, digital camera, etc.) used must be able to withstand these environmental factors. Due to the time constraints of the availability of the ship for shipcheck and the need for these 3-D models for modifications to take place on the vessel, the Contractor shall expedite both the data acquisition process while onboard the vessel and the time to deliver the final product to MSC. Specific Tasks: The Contractor shall perform a Photographic Measurement Survey of six (6) specific spaces on the USS MOUNT WHITNEY. The Contractor shall create a 3-D model of each space in 3-D AutoCAD format that will be provided to MSC. Deliverables: The Contractor shall provide 3-D models of the six (6) spaces listed in AutoCAD format to the TPOC. The Contractor shall provide a Shipcheck Report consisting of the following: the names of the personnel attending the ship, dates attended, spaces worked in, names of any shipboard personnel contacted for any reason, any problems experienced or areas not able to be accessed, and any assumptions that had to be made during the shipcheck because of a lack of information or access. The format of the Shipcheck report shall be an electronic copy in MS Word and shall be submitted to the TPOC 5 business days after the shipcheck. The Period of Performance for the Contract is 31 October 2011 through 30 December 2012.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS