This Solicitation opportunity from Colorado was posted on September 17, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
HighAI Summary for 2024-068M23 Replace Parking Lots, Roads, & Lighting - Information for Bidders: This document provides instructions for bidders for Project No. 2024-068M23 (Replace Parking Lots, Roads, & Lighting) at Lamar Community College. It outlines requirements for the bid form, bid security (5% for bids over $50,000), compliance with Colorado laws regarding prevailing wages and embodied carbon emissions, and the method of award based on the lowest responsible bidder using additive and deductible alternates.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Lamar Community College Pavement Rehabilitation Project - Bid Plans: Construction bid plans and general notes for the Pavement Rehabilitation Project at Lamar Community College, dated August 27, 2025 (Revision I). The document includes a sheet index covering various parking lots and service roads, project general notes regarding permits, insurance, safety, and warranties, and identifies the project engineer as Ron Nies, P.E.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Lamar Community College Pavement Rehabilitation Project Specifications: Technical specifications for the pavement rehabilitation of parking lots and access roads at Lamar Community College. The document covers general requirements, submittal schedules, site work, selective demolition, excavating, backfilling, and asphalt paving standards, including material requirements and environmental limitations for installation.
DOCX
DOCX, High priority: read this firstafb
HighAI Summary for LCC 26-05: Replace Parking Lots, Roads, & Lighting Across Campus Wide: Advertisement for Bids (AFB) issued on 9/17/25 by Lamar Community College for project 2024-068M23. The project involves milling, resurfacing, and replacing parking lots and roads, including lighting and striping, with an estimated cost of $1,975,000. The document outlines Colorado state legal requirements (labor, prevailing wage, Buy Clean Colorado Act), minimum contractor qualifications, and the project scope.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for LCC Lighting Drawing IFC - Lighting Fixture Schedule: Issued for Construction (IFC) lighting drawing and fixture schedule dated 09-09-2025. The document specifies technical requirements for solar-powered LED parking lot area lights (Acuity Brands), including quantities, lumen output, and substitution rules (OR EQUAL, NO EQUAL, SUBJECT TO REVIEW).
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for SBP-6.131 Bid Alternates 2025 R1: A bid alternates form (SBP-6.131) used for capturing pricing for additive and deductive alternates. The document provides instructions for bidders on how to modify the base bid and includes pricing tables for up to ten additive and ten deductive alternates.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for SBP-6.13 Bid Form 2025: A standard State of Colorado bid form (SBP-6.13) used by bidders to submit proposals for public works projects. The document includes sections for base bid pricing, project completion timelines, certifications regarding Colorado labor requirements (80%), SDVOSB status, and bid guarantee requirements. It outlines the bidder's commitment to execute the contract and provide necessary bonds and insurance upon award.
DOCX
DOCX, High priority: read this firstspecifications
HighAI Summary for State of Colorado Direct Labor Burden Calculation Form: A State of Colorado Office of the State Architect form used to calculate direct labor burden for construction agreements. It requires contractors and major subcontractors to list labor overhead percentages (taxes, benefits, etc.) to be used in Exhibit A and for future Change Order Proposals.
DOCX
DOCX, Low prioritybid-bond
LowAI Summary for SBP-6.14 Bid Bond Template: A standard bid bond template from the State of Colorado Office of the State Architect, State Buildings Program. It outlines the requirements for a guarantee of 5% of the total bid price to ensure the principal executes the agreement and provides required bonds/insurance if awarded. Failure to provide a properly executed bond and power of attorney results in a non-responsive proposal.
DOCX
DOCX, Low priorityaward
LowAI Summary for SBP-6.15 Notice of Award: A template for a Notice of Award from the State of Colorado Office of the State Architect, State Buildings Program. It notifies a contractor that their proposal for a Design/Bid/Build or Design/Build lump sum agreement has been accepted and outlines the requirements for executing the agreement and providing necessary bonds and insurance within ten days.
DOCX
DOCX, Low prioritynotice-to-proceed
LowAI Summary for SBP-6.26 Notice to Proceed (Design/Bid/Build Agreement): A template for a Notice to Proceed issued by the State of Colorado Office of the State Architect, State Buildings Program. This document authorizes a contractor to begin work on a Design/Bid/Build project following the receipt of required bonds and insurance certificates.