Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on December 17, 2020. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

LD4 Concrete Supply & Pumping

Awarded
W912ES21Q0013Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This contract, titled LD4 Concrete Supply and Pumping, involves the provision of all labor, equipment, and materials for concrete work during Lock 4 Winter Maintenance. The primary scope requires the supply and pumping of 56 cubic yards of concrete for the downstream bulkhead sill beam, with work to be completed by March 12, 2021. The contractor is responsible for up to eight hours of on-site pumping for this initial placement. Additionally, the government maintains the option to request up to seven additional deliveries of up to 10 cubic yards each for vertical concrete repairs on the Land and Intermediate walls. These optional placements may require a pump truck for up to six hours per delivery, with the government paying only for actual hours utilized. The government must provide at least two business days' notice for these options, which must be exercised by March 1, 2021, for completion by March 12, 2021.

General Info

Contract Value

$38,348

NAICS

327320 - Ready-Mix Concrete Manufacturing

Place of Performance

MN, USA

Set-Aside

NONE

Award Issued Date

Documents

3

A22+21Q0013+Amendment+1.pdf

PDF

W912ES21Q0004+LD4_Pump_Truck_Setup+ATTACHMENT+1.pdf

PDF

W912ES21Q0013+LD4+Concrete+and+Pumping.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseAwarded
Posted

Solicitation

Deadline changed

Response deadline changed from Dec 9, 2020 to Dec 11, 2020.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W07V Endist St Paul
Contacts2 people available
OfficeSAINT PAUL, MN, 55101-1323, USA
Office AddressSAINT PAUL, MN, 55101-1323, USA

Full Description

Show more
The work shall consist of the concrete being supplied for Lock 4 Winter Maintenance. The placement area includes the downstream bulkhead sill beam. Options for placement for vertical concrete repair located on the Land and Intermediate wall inside the lock chamber are included. The quote shall provide for all labor, equipment, materials, and supplies necessary for this work. 56 CY of concrete shall be supplied and placed by method of pumping (up to 8 hours of on-site pumping in accordance with paragraph 6 of scope of work) for the downstream bulkhead sill beam. Placement can begin any time after submittal approval and shall be completed by 12 March 2021. As options, the Government may require up to 7 additional deliveries/placement of up to 10 cubic yards (CY) of concrete per placement. The option deliveries may require the use of a pump truck, at the request of the government (up to 6 hours of on-site pumping in accordance with paragraph 6). The use of the pump truck is included in 2 options of 21 hours each. Should the pump truck be required with the additional concrete delivery/deliveries, the Government will exercise the option at that time. And, the contractor shall only charge the government for the actual hours the pump truck is utilized to place concrete. The Government shall notify the contractor a minimum of 2 business days prior to the need for the additional concrete delivery. Pricing for the option CLINs shall include the price for delivery and method of placement (Pump Truck when requested) of up to 10 CY of the approved concrete mix. The options may be exercised any time prior to 1 March 2021 for completion no later than 12 March 2021.

More opportunities from Department Of Defense → W07V Endist St Paul

Same awarding agency

NAICS: 334513
New
Federal
Industrial Variable Frequency Drives (VFDs)
Solicitation # W912ES26QA115
Solicitation W912ES26QA115, issued by the U.S. Army Corps of Engineers St. Paul District, is a total small business set-aside for the procurement of factory-new, commercial-off-the-shelf ABB ACS880 Series Variable Frequency Drives (VFDs). These units are required for critical operations on the Dredge Goetz, including the cutter head, main pump motors, ladder, swing, spud, and carriage drives. To ensure system compatibility and prevent unacceptable downtime, the government has issued a brand name justification limiting competition to ABB brand spares. The requirement consists of four line items: one 690V Drive Module (430A), one 500V Wall-Mounted Drive (302A), one 500V Wall-Mounted Drive (124A), and two 690V Drive Modules (721A), all featuring specific factory-installed plus-codes and technical specifications. The contract will be awarded as a single firm-fixed-price agreement to the responsible offeror providing the most advantageous price. All equipment must be 100 percent factory-new, meeting IEEE, UL, and CE standards, and must include a minimum 12-month warranty from commissioning or 18 months from delivery. Deliverables include a technical data package and a Certificate of Conformance. Items must be crated per ASTM industrial standards, moisture-barrier wrapped, and marked with permanent OEM nameplates and DoD unique identification per MIL-STD-130. Delivery is required by February 26, 2027, to the Civil Works Service Base in Fountain City, Wisconsin, with shipping costs included in the CLIN pricing. Offers must be submitted in PDF format via the PIEE Solicitation Module by the final deadline of November 9, 2026.
Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial Process Variables

POSTED

about 18 hours ago

DEADLINE

in 11 days
View Details
NAICS: 332439
New
Federal
2-20 foot Containers with Gantry Beam and Chain Lift
Solicitation # W912ES27QA004
Solicitation W912ES27QA004 is a total small business set-aside for a firm-fixed-price contract to procure two brand-new 20-foot High Cube open-side storage containers for the U.S. Army Corps of Engineers. The containers require custom structural steel fabrication of a 1-ton capacity Load Handling Equipment crane and hoist system, featuring a 6-foot external extension and an internal counterweight system. Key technical requirements include a design safety factor of 5:1 per ASME B30 standards, PE-stamped structural calculations, and compliance with EM 385-1-1. All modified components must be coated in industrial Safety Yellow paint and the units must be marked with DoD Item Unique Identification in accordance with MIL-STD-130. The contractor is responsible for turnkey ground delivery to Fountain City, Wisconsin, with a final delivery deadline of March 1, 2027. Final acceptance is contingent upon a physical inspection and successful field demonstration by USACE staff, including a 125% proof load test and verification that the hoist traverses the full length of the gantry rails without binding. Offerors must submit technical descriptions, product data sheets, and drawings via the PIEE Solicitation Module. Evaluation will be based on technical acceptability, price consistency with historical data, and risk assessments conducted through the Supplier Performance Risk System.
Other Metal Container Manufacturing

POSTED

about 18 hours ago

DEADLINE

in 7 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS