(i) This is a combined synopsis/solicitation for commercial items, prepared in accordance with the format in subpart 12.6 of the FAR and as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a separate written solicitation will not be issued. (ii) Solicitation number 70Z04019Q60996Y00 applies and is used as a Request for Quote (RFQ). This solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2005-87, effective, 7 March 2016. (iii) It is anticipated that a competitive price purchase order shall be awarded as a result of this synopsis/solicitation. All responsible sources may submit a quotation, which if timely received, shall be considered by this agency. (iv) The U.S. Coast Guard, Surface Forces Logistics Center (SFLC) intends to award a Firm Fixed Price Purchase Order. (v) The United States Coast Guard Surface Forces Logistics Center has a requirement for the following items: (vi) Please note mandatory site visit will be held on the morning of 01/07/19 and all reservations are due on 01/04/19 by 1300 EST to Mr. Jonathon Whalen (
contact@example.gov ) ITEM 1: Perform lead paint remediation in location of Bulkhead 76 Upper Motor Room. Contractor must have certifications for the removals and disposals of lead paint. QTY: 1 JOB UNIT PRICE: ________________ ITEM 2: Perform lead paint remediation in location of Motor Room Bilge. Contractor must have certifications for the removals and disposals of lead paint. QTY: 1 JOB UNIT PRICE: ________________ ITEM 3: Perform lead paint remediation in location of Exterior Stack. Contractor must have certifications for the removals and disposals of lead paint. QTY: 1 JOB UNIT PRICE: ________________ ITEM 4: Perform lead paint remediation in location of exterior of Motor Room Upper Deck and Coaming. Contractor must have certifications for the removals and disposals of lead paint. QTY: 1 JOB UNIT PRICE: ________________ ALL LINE ITEM JOB TOTAL: ___________________ REQUIRED DELIVERY DATE: 01/22/19 PROMISED DELIVERY DATE:______________________ 1. SCOPE OF WORK: Removal of lead based paint from USCG Cutter 2. COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK: Upon acceptance, the contractor shall commence work after notice to proceed and work diligently to complete the entire work ready for use by 30 working days after contract award. 3. GENERAL REQUIREMENTS: The work consists of providing all labor, materials and equipment as required to Abate Lead Containing Coatings located at USCG Yard 2401 Hawkins Point Road Baltimore MD 21226. Cutter Mobile Bay 140' Tug. The contractor must provide all necessary labor, equipment, materials, disposals and supervision to safely perform Lead Paint remediation's listed in this statement of work. All HAZMAT must be placed and sealed in Contractor provided containers and be properly labeled. The Contractor shall provide a work plan which includes, method for completing work including equipment, tools protective measures to seal off work site, schedule, method of sampling, and disposal plan with proposal. During the performance of work a progress report must be submitted at 25% and 75% of work completion. The Contractor shall comply with all Occupational Safety and Health Administration (OSHA) requirements specified as applicable to personnel exposure to Lead HAZMAT. The Contractor shall comply with all Occupational Safety and Health Administration (OSHA) requirements specified in 29 CFR 1915, Subpart B, as applicable to Confined and Enclosed Spaces and Other Dangerous Atmospheres in Shipyard Employment. The Contractor shall comply with applicable OSHA requirements specified in 29 CFR 1915.1025 and 29 CFR 1926.62, as applicable to personnel exposure to lead. Employee training must meet the requirements of OSHA 29 CFR 1926 and Maryland Department of the Environment. All work must meet OSHA Standards, EPA CFR40, local, state, and federal requirements. Any deviations must be reported to the Coast Guard Yard staff immediately. All Contractors' equipment must meet local, state and federal environmental regulations. Environmental Protection Agency (EPA) and Maryland Department of the Environment (MDE) approval for work methods will be the responsibility of the Contractor. Any work variance approvals will be the responsibility of the Contractor. The contractor shall provide a work plan meeting state and federal regulations with the proposal including all equipment and tools that will be used. 3.1.1 Contractors must perform a site visit before bids are submitted. 3.2 Preservation particulars. The Contractor shall accomplish the below-specified surface preparation and coating application tasks. Use Coast Guard Drawing(s) listed in Section 2 (References) as guidance. 3.2.1 Surface preparation. Prepare all surfaces listed in table 1, including attached framing, stiffeners, piping, and equipment support, as applicable, by one or a combination of the following surface preparation methods: Table 1: Surface Preparation Methods ABRASIVE BLASTING MECHANICAL CLEANING Abrasive-blasting to SSPC-SP10/NACE No. 2, using grit conforming to MIL-A-22262 (1.5 to 2.5 mil anchor profile). Power tool cleaning to a SSPC-SP 11 (1.0 mil anchor profile). 3.2.3 Protective measures - general. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness. 3.2.4 Interferences. The CG Yard shall handle all interference removals in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Some interferences may not be practical for removals. The Contractor will need to cover and work around interference that cannot be removed. Known interferences include, but are not limited to the below-listed: Sheathing. Bulkhead insulation. Piping. Wiring 3.2.5 Hazardous material disclosure. The Contractor shall be aware of the presence of lead in excess of 0.06 percent by weight (0.12 mg/cm2, or 600 ppm) in existing primer coatings in the affected locations. The Contractor shall be aware of the presence of asbestos in excess of 0.01 percent in the existing anti-sweat/vermiculite coatings in the affected locations. 3.2.6 Pre-and post abatement lead/asbestos dust sampling - for non-affected spaces. Before and after completion of abatement job, the Contractor shall conduct lead dust wipe sampling in non-affected location(s) listed in Table 2. Refer to sub-paragraph paragraph titled "Lead dust wipe sampling" in SFLC Std Spec 0000, Appendix A or B, as applicable. NOTES 1. Pre-abatement sampling for non-affected adjacent compartments is for the purpose of establishing baseline of initial condition. 2. Post-abatement sampling for non-affected adjacent compartments is for verifying whether or not contamination has occurred as a result of improper protective measures. 4.0 Abatement particulars. Surface preservation: The Contractor shall abate all areas if noted in the table above, of the cutter as necessary to complete tasks. SFLC Std Spec 6310 shall be used for surface preparations and coating systems. Separate contaminated areas from other areas. Do not permit non-essential personnel in the work area. Prevent dust from migrating to other areas, as follows - o Seal doors, hatches, and all other openings between the work area and other areas with an airtight barrier, such as fire-rated polyethylene; seal both sides (inside the construction area, and inside the adjacent area) to provide a secondary dust barrier and prevent the doors and windows from being used (post alternative emergency exits, if applicable). - o Ensure that the work area remain under negative pressure in relation to adjacent areas. NOTE Negative pressure means that more air is exhausted from the area than is supplied so that lead dust and asbestos particles are contained within the work area, and do not contaminate adjacent non-affected compartments. Exhaust air must be filtered with a suitable HEPA filter. Take, at a minimum, the following measures, to protect de-contamination workers: - o Use a HEPA (high-efficiency particulate air) vacuum - never use a conventional vacuum. A HEPA vacuum removes 99.97% of particles that are less than 0.3 microns in size. - o Never use compressed air; never dry sweep. - o Workers must wear a respirator which is approved by NIOSH and has N100, P100 or R100 filters (the cartridges are usually purple); respirators must be fit-tested to insure proper seal, and employees must be medically screened and trained prior to wearing a respirator (see the OSHA Respirator Standard 29 CFR 1910.134 - covers respiratory protection for shipyard employment. - o Workers must wear full-body protective clothing, head covering and shoes (or shoe covers). - o Eating, drinking and smoking are prohibited in work areas. - o Workers must wash hands and face before eating, drinking or smoking. - o Workers must not leave the work area without having gone through a proper decontamination process, to prevent spread of lead dust to un-affected areas. - o Workers must remove work clothes and shoes before leaving the work area, and seal work clothes in plastic. - o Workers must shower and wash hair as soon as possible after leaving the work area. - o Non-disposable work clothes must be washed separately from other clothes. 4.2.1 Remove protective covers, to allow for performance of lead dust cleaning and wipe/paint sampling tasks, as specified in 3.3.2.1 (Lead dust clean-up) and 3.3.2.2.1.2 (Additional wipe Clearance sampling), respectively. Reinstall protective covers, after said tasks have been completed. 4.2.1.2 Remove and dispose of all protective covers, upon completion of work. 4.2.2 Be aware that surfaces to be abated also include all structural members associated with/adjacent to designated surfaces, in addition to lighting fixtures, pipe runs, and junction boxes. NOTES 1. SFLC Std Spec 0000, Appendix A applies to availabilities performed at contractor operated (non-USCG) facilities; Appendix B pertains to work accomplished at USCG facilities. 2. Abatement specific requirements in Appendix A or B of SFLC Std Spec 0000 include, but are not limited to the following: + Additional protective measures. + HAZMAT removal/surface preparation. + Post-surface preparation clearance sampling and inspection. + Lead dust clean-up. + Waste disposal. 4.3 Post-abatement clearance, inspection, and cleaning - order of performance. After completion of surface preparation and removal of generated debris, perform the below-specified tasks, in the specific order provided. 4.3.1 Substrate inspection. Perform visual inspection, accompanied by the CG Inspector, of all prepared surfaces. Submit a CFR. 4.3.2 Lead dust cleaning and wipe sampling. After satisfactory results of visual inspection, perform all tasks associated with lead dust cleaning and wipe sampling. Step 1 - Debris Removal: Remove all gross debris, paint chips, etc. using either a vacuum with a HEPA filter and picking up chips or large pieces of contaminated debris by hand. Step 2 - Vacuum Cleaning: Using a suitable HEPA vacuum, clean all affected surfaces, following the following guidelines: - o Begin cleaning with high areas first - with overhead surfaces and bulkheads working downward. - o Vacuum all surfaces in the compartment. - o Work in the direction furthest from the entry door toward it. Step 3 - wet cleaning: Following thorough HEPA vacuuming, wash all surfaces with any suitable cleaning detergent following the same cleaning pattern (high to low/ furthest from and toward entrance). Change the cleaning solution as it becomes dirty. Rinse all areas with a fresh cloth/mop. Do not reuse contaminated mops or cloths. Step 4 - Vacuum Cleaning: Perform a HEPA vacuum again as specified in "Step 2". Step 5 - Waste Disposal: Properly dispose of contaminated materials, in accordance with all applicable Federal, state, and local regulations. For hazardous waste the contractor will provide lab results and Government employee from the Environmental Branch MUST sign the HW Manifest copies (original and final) and Land Disposal Restriction (LDR) copies must be provided to Environmental Branch. For non hazardous waste the contractor will provide lab results and Government employee must sign the BOL/Manifest copies (original and final) must be provided to Environmental Branch. With the proposal the contractor shall provide to the Contracting Officer documentation that they have an agreement with an approved Hazardous and non hazardous disposal site. NOTES 1. Work Smart, and Work Clean. DO NOT GENERATE DUSTS. It is easier to effectively clean an area when dusts are not being generated to resettle on previously cleaned areas! Worker exposures may be high during wet sweeping. 2 A wet/dry HEPA unit is ideal for working with hazardous dust clean up. 3. Lead-contaminated objects that are porous or materials that may suffer damage from water may not be able to be sufficiently decontaminated by these methods and should be discarded. 4.3.2.1 Visual inspection. Conduct a visual inspection, in the presence of the Coast Guard Inspector, to ensure that none of the following is present. Visible coatings on any part of the substrate, including pitted areas. Dust. Cleaning material haze. 4.3.2.2 Clearance sampling. Upon acceptance of the visual inspection results by the COR, do the following: 4.3.2.2.1 Wipe sampling - lead dust. Conduct wipe sampling clearance testing, in accordance with ASTM 6966, as designated by the Coast Guard Inspector, in ten (10) total locations within the contained abatement area, but not on the bulkhead, to ensure that there exist no lead dust residues in excess of the below-listed concentrations, as specified below. Four (4) of the ten locations shall be 1ft x 1ft areas each along the deck fwd of the bulkhead and the remaining six (6) shall be on horizontal surfaces of a 4in x 4in area each. Submit a CFR with sample results. If any results are higher than the below-listed concentrations following abatement efforts, contractor shall clean affected areas and re-test until lead concentrations are lower than specified below. 40 micrograms/square foot (mcg/ft 2) - for berthing and/or food preparation areas. 200 micrograms/square foot (mcg/ft 2) -for all other areas. 4.3.2.2.1.1 Laboratory analysis. Ensure that lead dust samples are analyzed by a laboratory certified by the National Lead Laboratory Accreditation Program (NLLAP) or the American Industrial Hygiene Association. Provide proof with the proposal that the Contractor has an agreement or the ability to use a certified laboratory for lead dust and paint samples. NOTE For a listing of certified laboratories, go to www.aiha.org. 4.3.2.2 1.2 Additional wipe clearance testing. Be aware that the Coast Guard reserves the right to coordinate additional wipe clearance testing, at no cost to the Contractor, to verify the sample results. NOTE All additional wipe clearance testing conducted by the Coast Guard must be witnessed by the Contractor, to verify where and how samples were collected - and thus, prevent contract disputes. 4.3.3 General Information 5.1 Schedule Period: The start date is January 7 th. The Contractor will have 30 consecutive days to complete all work including providing safe for occupancy documentation. 5.2 Quality Control: The Contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this Statement of Work. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor's quality control program is the means by which he assures himself that his work complies with the requirement of the contract. 5.2.1 The Contractor shall submit, for Contracting Officer approval, a Quality Control Plan as part of its proposal. The plan shall include, at a minimum, the following: The quality control organizational structure. A description of the methods of identifying deficiencies in the quality of services performed before the level of performance becomes unacceptable. A description of the methods of documenting and enforcing quality control operations of Contractor, and any Subcontractor, work, including inspection and testing 5.2.2 Quality Control Reports: The Contractor shall submit a copy of the daily Quality Control Reports to the COR at end of each working day. The Quality Control Reports shall contain, at a minimum, information on the following: Daily Log Safety concerns CFR from pre job sampling and post work sampling 5.3 Hours of Operation: The United States Coast Guard Yard normal working hours are from 7:00 A.M. to 3:30 P.M., Monday thru Friday, except Federal holidays or when the Government facility is closed, due to local or national emergencies, inclement weather, administrative closings or similar Government directed facility closings. During the months of June thru August the Coast Guard Yard may switch to summer working hours which are 6:00 A.M. to 2:30 P.M Monday thru Friday. 5.3.1 The Contractor shall maintain at all times an adequate workforce for the uninterrupted performance of all tasks defined within this SOW when the Government facility is not closed. 5.3.2 To accommodate Yard work the contractor may be required to work outside of the normal working hours, nights from 1530 - 0600 and possibly on weekends. Advance notice will be given, as much as practical. 5.3.3 On days of inclement weather the Contractor shall call the U.S. Coast Guard Yard inclement weather hotline at
+1 (555) 000-0000, option #1 for that day's status. If the U.S. Coast Guard Yard is closed the contract employees will not report for that day. If there is a delayed opening the contract employees should report at that time specified in the announcement message. 5.4 Place of Performance: The work to be performed under this contract will be at the U.S. Coast Guard Yard, Curtis Bay Baltimore, MD 21226. 5.5 Security Requirements: The U.S. Coast Guard Yard, Baltimore, MD is a controlled access area. All contractors and subcontractors performing work on this contract shall utilize the RAPIDGate program. RapidGate manages the non-Common Access Credential (CAC) eligible vendor/contractor companies and their employees who require access to Coast Guard Yard, Baltimore. Vendor/contractor CAC eligibility has been restricted to only those who require physical access to Coast Guard yard and logical access to a DOD or DHS network or system. All Contractor employees are required to identify themselves with company identification on their hard hats and/or uniforms. Any Contractor employee, not following U.S. Coast Guard rules and regulations, will be removed from performance on this contract and may be barred from reentering the U.S. Coast Guard Yard. Contractor employees shall not enter restricted areas in accordance with Yard security regulations or policies. Before Contractor employees can work at the Coast Guard Yard Facility, the Contractor shall complete a security investigation on all Contractor employees in connection to this contract. Any Contractor employee with a criminal back ground must get prior authorization before they can gain access to Coast Guard Yard Facility. Contractor shall provide for each employee to the Contracting Officer, the full name and any alias, address, city and state, and date of birth. 5.5.1 All working personnel shall have a TWIC or Rapidgate card to perform work at Coast Guard Yard Baltimore: 5.5.2 Physical Security: The Contractor shall be responsible for safeguarding all Government equipment, information and property provided for Contractor use. 5.5.3 Listing of Employees: The Contractor personnel shall maintain a current listing of employees. This list will include the employee's name, social security number, and date of birth. The list shall be provided to the Contracting Officer and the Contracting Officers Representative (COR). An updated listing shall be provided when an employee's status or information changes. 5.5.4 Reporting Requirements: Contractor personnel shall report to an appropriate authority (Contacting Officer, COR, Ship Superintendant) any information or circumstances of which they are aware may pose a threat to the security of U.S. Coast Guard personnel, Contractor personnel, resources, and classified or unclassified defense information. The Contractor shall not substitute employee(s) without prior notification to the Contracting Officer and COR. Contractor employees shall receive a full safety briefing by their immediate supervisor upon initial on-base assignment of all known hazards in areas that work shall be performed. 5.6 Occupational Safety and Health Standards: The Contractor is required to follow 29 CFR 1915 (OSHA Shipyard Industry Standard), 16 CFR1303, 29 CFR 1910, 29 CFR 1915.1025, 29 CFR 1926.62, 15 U.S.C. 2601, while performing this work at the U.S. Coast Guard Yard. The Contractor must provide all required personnel safety equipment for their employees, such as, but not limited to; safety helmet, safety glasses with side shields. All safety equipment must meet OSHA standards. Failure of the Contractor employees to comply with the above requirements could result in a shutdown of operations. 5.6.1 Emergency Responses: The U.S. Coast Guard Yard has 24 hour first aid, spill response and fire protection available. If necessary, the Contractor may call
+1 (555) 000-0000 from non-Yard phones and extension 3000 from Yard phones for emergency situations. The U.S. Coast Guard Yard will provide emergency first aid only. Injuries must be reported immediately and followed up with a written report to the Contracting Officer Representative (COR). 5.7 ISO Qualifications: Contractor shall comply with all the U.S. Coast Guard Yard International Organization for Standardization (ISO) 9001 Quality Management and ISO 14001 Environmental Management Systems certifications. ISO 14001 EMS training will be provided by the CG Yard. The Contractor may be periodically audited to ensure conformity to these certifications and standards. In the event the Contractor creates an unsafe work environment and will cause yard work operations to cease, the Contractor will be held responsible and damages shall be assessed for the length of the work delay. 5.8 Post Award Conference/Periodic Progress Meetings: The Contractor will agree to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart (FAR) 42.5. The contracting officer, COR, and other Government personnel, as appropriate, will meet before any work commences and may meet periodically with the Contractor to review the Contractor's performance and schedule. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government. 5.9. Contracting Officer's Representative (COR): The COR will be identified by separate letter. The COR will monitor all technical aspects of the contract and assist in contract administration. The COR is authorized to perform only those functions designated in the letter, issued by the Contracting Officer. A letter of designation, issued to the COR (a copy of which will be sent to the Contractor), states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in performance dates. The COR is not authorized to change any of the terms and/or conditions of the contract. All contract changes that impact price or cost, quality of work and the performance schedule may only be approved or made by the Contracting Officer. 6.1. Key Personnel: The Contractor shall provide a Supervisor who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the Contractor when the Supervisor is absent shall be designated in writing to the Contracting Officer. The Supervisor or alternate shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. The Supervisor or alternate shall be available between 7:00 a.m. to 4:30 p.m., Monday thru Friday except when the Government facility is closed for administrative reasons. 6.1.0 Coordination with COR: The Contractor shall coordinate all work requirements, stated herein, with the Contracting Officer and the COR, the COR will communicate with the Supervisor to ensure adherence with the SOW. There may be occasions in which the U.S. Coast Guard Yard will request the Contractor to cease work or move to a different location on the vessel due to U.S. Coast Guard Yard production requirements. 6.1.1 Damage to Government Property: The Contractor shall be held liable for any damage to government property caused by the Contractor. The Contractor shall provide protective coverings on all vulnerable equipment and surfaces. It shall be the responsibility of the Contractor to ensure that the covering is adequate. Any concerns as to the adequacy of the coverings must be brought to the attention of the COR. The Contractor shall inspect the area before work commences and may request a technical inspection from the COR, however such an inspection does not relieve the Contractor from responsibility for damage. 4. SITE VISIT: All bidders are strongly encouraged to visit the site on 01/07/19 to verify any/all quantities before submitting bids, reservations for site visit are due by 01/04/19 at 1200hrs. Interested parties shall make arrangements for a site visit with Jonathon Whalen ENG2
5. DESIGNATED CONTRACTING OFFICER'S QA EVALUATOR (QAE) REPRESENTATIVE: The designated contracting officer's QAE representative and Point of Contact for this project is Whalen, Jonathon T ENG2 . Inquiries concerning any phase of the specification before or after award shall be made to Jonathan Whalen +1 (555) 000-0000. 6. CONDITIONS AFFECTING THE WORK: The offeror should visit the site and take such other steps as may be reasonably necessary to ascertain the nature and location of the work, the general and local conditions, which can affect the cost of the work thereof. Failure to do so will not relieve bidders from responsibility for estimating properly the difficulty or cost of successfully performing the work. The government will assume no responsibility for any understanding or misrepresentations concerning conditions made by any of its officers or agents prior to the execution of the contract, unless included in the request for quotes, the specification or related documents. 7. AFTER AWARD OF THE CONTRACT: The contractor must immediately notify the contracting officer's QAE representative of the intended start date. The work shall be done in accordance with the specification. 8. ORAL MODIFICATION: No oral statement of any person other than the contracting officer shall in any manner or degree, modifies or otherwise affect the terms of this contract. 9. WORKMANSHIP: All work shall be accomplished with the best standard practices, and by workmen thoroughly experienced in the required trades. The work shall be supervised by experienced personnel and shall be satisfactory to the Contracting Officer. 10. PERMITS: The contractor shall without additional expense to the government, obtain all appointments, licenses, and permits required for the prosecution of the work. The contractor shall comply with all applicable federal, state and local laws. 11. CLEAN UP: All trash and debris shall be removed from the site daily. The job site shall be left in a clean and neat manner. 12. WORK OUTSIDE REGULAR HOURS: If the contractor desires to carry on work on Saturday, Sunday, holidays or outside the unit's regular hours, must submit their request in writing to the Contracting Officer's QAE Representative for approval consideration. The contractor shall allow ample time to enable satisfactory arrangements to be made by the government for inspecting the work in progress. 13. UPON COMPLETION OF WORK: Contact the Contracting Officer's QAE Representative to arrange for inspection/acceptance of work. 14. IDENTIFICATION OF CONTRACTOR PERSONNEL AND VEHICLES: All contractors and subcontractors performing work onboard the Coast Guard YARD shall utilize the RAPIDGate Program (www.rapidgate.com) if repeat access to the CG Yard is required for seven (7) or more days annually. RAPIDGate manages the non-Common Access Credential (CAC) eligible vendor/contractor companies and their employees who require access to Coast Guard Yard, Baltimore. Vendor/contractor CAC eligibility has been restricted to only those who require physical access to Coast Guard Yard AND logical access to a DoD or DHS network or system. Costs incurred for delays at the gate due to the contractor's failure to comply with this requirement or to provide qualified, authorized personnel will not be reimbursed by the Government. Additionally, consideration may be negotiated for performance delays caused by the contractor's failure to comply with RAPIDGate requirements, or for delays caused by the disqualification of contractor employees. Each contractor provided vehicle or towed trailer shall show the contractor's name so that it is clearly visible on the vehicle. A valid state license plate and safety inspection sticker is required. All vehicles operated on government property shall be maintained in a good state of repair. 15. SAFETY REQUIREMENTS: a. Responsibilities: (1) All contractors working on CG Mobile Bay shall abide by all federal safety regulations as published by the Occupational Health and Safety Administration, 29 CFR 1910 (series) and 29 CFR 1926 (series). Contractor written safety programs shall be reviewed by the Base Safety Office Jason Deyo +1 (555) 000-0000 prior to starting work. (2) Written notification must be provided to the YARD Safety Officer , in their capacity as Fire Marshal of any activity that could potentially cause fire or explosion or that changes or reduces the capability of fighting a fire or explosion. Some examples of qualifying activities are: a fire hydrant or fire suppression system that must be taken out of service for any reason, electrical work that affects fire alarm systems, introduction of hazardous or flammable material onto the unit, and blocking of any egress routes or emergency vehicle routes. Inclusion of this information in the contract constitutes written notification as long as the outsource review sheet is signed by Base Safety Officer. (3) Copies of the following must be provided to the YARD Safety Office prior to starting work in affected areas: Confined Space Entry Permits, Hot Work Chits, and Dig Chits. Confined space clearance must be conducted by a certified marine chemist and permit required spaces will have a copy of the permit posted on site during work. Hot work will only be conducted with permission and a fire watch must be posted during work. A facility dig chit is required in addition to a Miss Utility dig chit. (4) Lock Out/Tag Out requires notification and coordination with facilities and will not be conducted by a contractor on Mobile Bay. A representative from CG YARD is required for all contractor Lock Out/Tag Out needs. - b. Rights: - 1. Every employee working on the CG Yard has the right to a safe and healthy work place. The contractor has the responsibility and right to stop unsafe work. QAE's and the...