Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, June 24 at 2:00 PM EDT

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Health And Human Services was posted on May 7, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Level 2 FRP Over Lab Ceilings Installation- COFC0401

Closed
75D301-26-R-73423Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Swinerton Invitation for Prequalification of Qualified Subcontractors and Suppliers: Lockers, Signage, Final CleanSwinerton is inviting qualified subcontractors and suppliers to prequalify for a collaborative design-build project at the California State University Bakersfield campus. The project involves the design and construction of a new 56,500 gross square feet Energy and Innovation Building, which will feature offices, research and teaching laboratories, a capstone design lab, an event space with flexible design, and outdoor engagement areas. This public works project is subject to prevailing wage requirements and includes specific trade bid packages such as signage, final cleaning, and solid phenolic core lockers. There is a required Disabled Veteran Business Enterprise (DVBE) participation goal of 6%. Interested subcontractors must submit completed prequalification forms by July 2, 2026, with trade bid packages expected to be posted on June 12, 2026. Construction is anticipated to start on January 1, 2026, and is scheduled for completion by June 16, 2027. Required submittals include the Swinerton Builders Prequalification form and the Master Service Agreement. For further information or to prequalify, subcontractors are directed to contact the Swinerton Prequalification Team via the provided email. Relevant documents and updates can be accessed through Swinerton’s subcontractor prequalification portal.
CSU, Bakersfield

POSTED

about 22 hours ago

DEADLINE

in 16 days
NAICS: 236220
New
SLED
Lake Mountain School District Design-Build Services Centralized District Operations & Institutional FacilityThis contract involves awarding a single Design-Build team a turnkey project to provide comprehensive services including civil engineering, architectural and structural design, utility extension, permitting, procurement, and full construction for a new approximately 25,000 square foot pre-engineered steel institutional facility. The facility will be located on a seven-acre site owned by the Lake Mountain School District in Utah County and is intended to consolidate the district's centralized operations, administrative functions, public assembly spaces, technical departments, and specialized student services into one integrated campus. The successful offeror will hold single-point responsibility for all design and construction phases, ensuring coordination and completion under one contract. The procurement is managed by Alpine School District's Department of Purchasing on behalf of Lake Mountain School District, with the solicitation number LMSD06292026. Proposals must be submitted by 4:00 PM Mountain Time on June 29, 2026. The contract duration is project-based, with construction expected to begin on October 15, 2026, and substantial completion targeted for June 2027. The selection will be made based on the highest score that meets the procurement code criteria, emphasizing responsiveness and responsibility of the proposing Design-Build teams.
Utah

POSTED

about 22 hours ago

DEADLINE

in 13 days

AI Contract Overview

Show more

The contract entails the repair and refinishing of gypsum board ceilings and walls within laboratory and adjacent spaces on the second floor of Building 401 at the CDC Ft. Collins campus. The work involves installing smooth, white fiberglass reinforced polymer (FRP) panels and trim to replace delaminated ceiling portions, with the contractor responsible for all materials, labor, equipment, demolition, surface preparation, sealing, and coordination with CDC for phased access. The project must adhere to all relevant health, safety, and environmental regulations, including dust control, temporary barriers, and protection or modification of fire protection systems to minimize disruptions to CDC operations. All tasks are to be completed in compliance with government-provided contract documents, drawings, and specifications. The period of performance requires project completion within 180 days after the Notice to Proceed. Vendor qualifications specify a minimum of three years of experience in similar construction and interior finish projects. This solicitation, titled "Level 2 FRP Over Lab Ceilings Installation- COFC0401," is a HUBZone set-aside with solicitation number 75D301-26-R-73423, issued by the CDC Office of Acquisition Services under the Department of Health and Human Services. Proposal submissions have been extended multiple times, with the current deadline set for May 18, 2026. A site visit was scheduled for April 13, 2026, to familiarize bidders with the project scope and requirements. The place of performance is Fort Collins, Colorado, and primary contract inquiries can be directed to Brad Edwards at the CDC.

General Info

Repair and refinish gypsum ceilings with FRP panels at CDC Ft. Collins, complete in 180 days.

Agency

Department Of Health And Human Services → CDC Office Of Acquisition Services

NAICS

236220 - Commercial and Institutional Building Construction View NAICS

Place of Performance

Fort Collins, CO, 80521, USA

Set-Aside

HZC

Documents

(15)

CDC Visitor Request Form - Fort Collins Campus Ver20240515

PDFvisitor-request-form

CDC Ft. Collins Building 401 Level 2 FRP Over Lab Ceilings Installation Statement of Work ASI #1 Revised August 21, 2025

PDFsow

CDC Contractor Non-Disclosure Agreement

DOCXnda

Solicitation 75D301-26-R-73423 Level 2 FRP Over Lab Ceilings Installation

PDFrfp

CDC Contractors' Employee Non-Disclosure Agreement

DOCXnon-disclosure-agreement

Solicitation 75D301-26-R-73423 Level 2 FRP Over Lab Ceilings Installation

PDFrfp

26 0427 CD Drawings 100 Percent Including ASI 1

PDFother

Amendment 00002 - Extend Proposal Due Date for Solicitation 75D301-26-R-73423

PDFamendment

100+ Percent CD Drawings

PDFother

100+Percent+CD+Specifications.pdf

PDF

26+0427+CD+Specs_100+percent_incl+ASI+1.pdf

PDF

Amendment 00003 to Solicitation 75D30126R73423 - RFI Responses and Proposal Extension

PDFamendment

Updated+Wage+Determination.txt

TXT

Amendment 00001 - Site Visit Date Added for Solicitation 75D301-26-R-73423

PDFamendment

Amendment 1 to Scope of Work for CDC Ft. Collins FRP Installation

PDFamendment

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

3 updates
PhaseClosed
Amendment 1

Contract was updated

Amendment 2

Contract was updated

Posted

Combined Synopsis

Amendment 3

Contract was updated

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Health And Human Services → CDC Office Of Acquisition Services
Contacts1 person available
OfficeATLANTA, GA, 30333, USA
Organization / Agency
Department Of Health And Human Services → CDC Office Of Acquisition Services
Office AddressATLANTA, GA, 30333, USA
Contacts

Full Description

Show more

Amendment 0003 (See Attached)
Issues responses to RFIs
Extends the date for the submission of Proposals to Monday, 18 May 2026
Incorporates additional technical documents into the solicitation

Amendment 0002 (See Attached):
Extends the date for the submission of proposals to Monday, 11 May 2026.

Amendment 0001 (See Attached):
A site visit is scheduled for April 13, 2026, at 0930 (MT). See attached amendment for instructions and the required Visitor Request Form (VRF).


SOLICITATION DETAILS


The Centers for Disease Control and Prevention (CDC) requires a contractor to repair and refinish gypsum board ceilings and walls in laboratory, laboratory support, corridors, and ancillary spaces on the second floor of Building 401 at the CDC Ft. Collins campus. The primary work includes covering designated gypsum board ceilings with smooth, white fiberglass reinforced polymer (FRP) panels and trim, installed to match existing installations in the building. The contractor will be responsible for all materials, equipment, labor, and supervision necessary to complete the work, including demolition of delaminated ceiling portions, surface preparation, installation of FRP panels and trim, sealing, and coordination with CDC for phased access to work areas.


The project also requires compliance with all applicable health, safety, and environmental regulations, provision of temporary barriers and dust control, protection and temporary modification of fire protection systems, and coordination of work to minimize disruption to ongoing CDC operations. All work must be performed in accordance with the contract documents, drawings, and specifications provided by the Government.


Period of Performance:
Completion is required within 180 days after Notice to Proceed.


Minimum Vendor Qualifications:
Offerors must demonstrate at least three years of experience with similar construction and interior finish projects.