Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

FRONT RANGE CONSTRUCTION INC

UEI: UFNYGJ2528F8CAGE: 7FNY5

FRONT RANGE CONSTRUCTION INC is a federal contractor, registered under UEI UFNYGJ2528F8 and CAGE code 7FNY5. It has been awarded $60,398,820 in federal contracts. Primary work spans Plumbing, Heating, and Air-Conditioning Contractors, Commercial and Institutional Building Construction, and Water and Sewer Line and Related Structures Construction. Top awarding agencies include Department Of Commerce, Department Of Justice, and Department Of Defense.

Contact Information

Registration and classification details

Registration

UEI Code

UFNYGJ2528F8

CAGE Code

7FNY5

Entity Structure

Corporate Entity (Not Tax Exempt)

Established

N/A

Business Classifications

For Profit OrganizationSubchapter S CorporationMinority-Owned BusinessAsian-Pacific American OwnedDOT Certified DBE

NAICS Codes

221210Natural Gas Distribution
221310Water Supply and Irrigation Systems
221320Sewage Treatment Facilities
221330Steam and Air-Conditioning Supply
236115New Single-Family Housing Construction (except For-Sale Builders)
+43 more

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

AI Capability Profile

Front Range Construction Inc. specializes in the design, construction, and maintenance of mission-critical infrastructure for federal facilities, with deep expertise in commercial and institutional building construction, as well as plumbing, heating, and air-conditioning systems. The contractor deli...

Front Range Construction Inc. specializes in the design, construction, and maintenance of mission-critical infrastructure for federal facilities, with deep expertise in commercial and institutional building construction, as well as plumbing, heating, and air-conditioning systems. The contractor delivers full-scope renovations, including laboratory upgrades, water main repairs, valve replacements, and exhaust fan system demolitions and installations. They provide integrated HVAC maintenance, boiler and pump replacements, chiller preventative maintenance, and ventilation system upgrades, demonstrating proficiency in both new construction and complex retrofit projects within sensitive government environments. Their technical capabilities include engineering analysis of existing building conditions, coordination of hazardous material abatement, and precision installation of mechanical systems to meet stringent federal operational standards. The company maintains a consistent presence with the Department of Commerce, where they execute water infrastructure upgrades and building renovations, and frequently supports the Department of Health and Human Services and the Department of Energy with HVAC system modernizations and facility maintenance. They also deliver services to the Department of Agriculture, General Services Administration, and other agencies, indicating a pattern of trusted, repeat engagement on mission-critical infrastructure projects requiring high reliability and regulatory compliance. Front Range Construction Inc. primarily operates under NAICS 236220 and 238220, positioning them as a specialized trade contractor focused on institutional building construction and mechanical systems integration. Their market focus is on federal facilities requiring precision mechanical work, lifecycle maintenance, and code-compliant renovations in laboratory, research, and administrative settings. As a small business structured as a 2L entity based in Colorado Springs, Colorado, the company serves federal clients across the Western U.S., with a strong regional footprint in Colorado and surrounding states. While no formal government certifications are listed, their consistent performance on complex, high-stakes projects demonstrates operational maturity and reliability within the federal contracting landscape.

Key Performance Metrics

Awards Count

99

All time

Active

9

Currently performing

Completed

90

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency Over Time
Awards by Place of Performance

Compete with FRONT RANGE CONSTRUCTION INC

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for FRONT RANGE CONSTRUCTION INC

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS

Open opportunities in FRONT RANGE CONSTRUCTION INC's top NAICS codes and agencies

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center in Glynco, Georgia, is a single firm fixed price contract for the comprehensive interior modernization of Building 262, with potential options for Buildings 261 and 263. The scope of work includes replacing corridor and classroom flooring with composite modular materials, fully renovating restrooms with new vanities and lavatories, and updating interior surfaces through repainting and the removal of vinyl wall coverings. Technical upgrades involve installing raised flooring, updating electrical distribution with simple dimming controls and new ceiling fans, replacing variable air volume systems, and correcting plumbing deficiencies. The contractor is also responsible for providing new signage and managing the movement and protection of all loose furniture. The period of performance is scheduled from January 11, 2027, to March 11, 2028, with a total delivery timeline of 425 calendar days after the Notice to Proceed. Award will be determined using the best suited negotiate methodology, evaluating price alongside past performance and corporate relevant experience, with minimum ratings of Satisfactory and Acceptable required, respectively. The contractor must provide performance and payment bonds equal to 100 percent of the contract price and adhere to strict quality control, safety, and ADA accessibility standards. Proposals must be submitted electronically to the Contracting Officer by November 9, 2026, and must include a detailed bid schedule in Excel and technical documentation in PDF format.
Bristol Alliance of Companies

POSTED

about 6 hours ago

DEADLINE

in 12 days
View Details
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The project is estimated between 10 million and 25 million dollars with a performance period of 730 days after award. The comprehensive scope of work includes selective demolition, building envelope repairs, new roofing with a 20-year warranty, and exterior wall system updates. Interior improvements consist of reconfiguration, new finishes, epoxy mortar flooring, and the installation of a full NFPA-compliant fire suppression system. Infrastructure upgrades encompass new HVAC systems, exhaust extraction, compressed air systems, electrical distribution, lighting, low-voltage systems, and building automation controls. Additionally, the project requires site improvements including paving removal and replacement, drainage upgrades, and hazardous materials abatement. The contract is divided into two primary exhibit line items: ELIN 0001 for building renovation and ELIN 0002 for paving work. Award will be based on the lowest price, and bidders must propose on all line items to avoid rejection. Performance is subject to the Davis-Bacon Act and Buy American requirements. Bonding requirements are tiered, with proposals exceeding 150,000 dollars requiring bid, payment, and performance bonds. Quality control is managed through a three-phase process requiring a government-accepted QC Plan and adherence to various ASTM and NFPA standards. Administrative requirements include monthly invoicing via Wide Area Work Flow using NAVFAC Form 7300/30 and the submission of detailed monthly work-hour and safety reports.
Bristol Alliance of Companies

POSTED

about 6 hours ago

DEADLINE

in 26 days
View Details
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project for the City of Belmont in North Carolina involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the existing Morgans Branch Pumping Station. Key infrastructure work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The scope further encompasses the installation of mechanical and electrical systems, including pumps, a generator, and odor control equipment, along with gravity sewers, manholes, stormwater facilities, and site restoration. The project has an estimated value of 16,690,000 dollars and a substantial completion timeline of 560 calendar days. This solicitation, identified as SRP-W-134-0290, is a unit price contract awarded to the responsible bidder submitting the lowest responsive bid. Bidders must provide a completed EJCDC C-410 Bid Form, a bid bond, and evidence of authority to sign, while also demonstrating good faith efforts toward MWBE goals. The contract requires performance and payment bonds and adherence to strict technical standards, including AWWA Specification C-600 for pipelines and NEMA standards for motors. Payment is processed via monthly applications for payment, with funds becoming due 30 days after presentation to the owner. The project is set aside for small businesses, including certified veteran-owned, women-owned, and HUBZone small businesses.
Don Moorhead Construction, Inc.

POSTED

about 6 hours ago

DEADLINE

in 12 days
View Details
NAICS: 811310
New
Kubota M8200 Clutch Replacement
Solicitation # kubota-m8200-clutch-replacement
Management & Training Corporation is soliciting bids for the clutch replacement of a Kubota M8200 tractor with front wheel assist, located at the Earle C. Clements Job Corps Center in Morganfield, Kentucky. The contractor is responsible for providing all transportation, labor, supervision, tools, and materials necessary to diagnose and repair the clutch assembly and power take-off system. The scope of work includes disassembling tractor components, replacing friction discs, bearings, oil seals, and O-rings, resurfacing the flywheel, and replacing hydraulic pipes and filters as needed. All work must be performed according to manufacturer specifications and verified through rigorous testing of clutch engagement and PTO operation under load before final acceptance by the Facility Maintenance Department. This is a fee-for-service contract awarded on a best-value basis, with a submission deadline of November 3, 2026. Eligible bidders include various small business categories, including VOSB, SDVOSB, WOSB, and HUBZone concerns. Proposals must include a bid sheet with a lump sum fee, a completed supplier packet with a W-9, proof of insurance, and detailed information regarding labor, parts, and warranties. The contract incorporates several Federal Acquisition Regulation clauses, including requirements for combating trafficking in persons, equal opportunity for veterans and workers with disabilities, and compliance with Service Contract Labor Standards for wages in Kentucky.
Earle C. Clements Job Corps Center

POSTED

about 6 hours ago

DEADLINE

in 6 days
View Details
NAICS: 238220
New
WOJC - Multi-Building Plumbing Leak Repair Project
Solicitation # WOJC – Multi-Building Plumbing Leak Repair Project
Education and Training Resources is seeking quotes for a multi-building plumbing leak repair project at the Westover Job Corps Center in Chicopee, Massachusetts. The scope of work includes replacing leaking shower P-trap drain pipes in Rooms 123 and 213, repairing a cracked drain pipe in the pipe chase of Room 216, and replacing heat pipe sections in the Administration Building and King Hall. All work must comply with the Massachusetts State Plumbing Code, International Plumbing Code, OSHA regulations, and NFPA Standard No. 101. Contractors are responsible for providing new commercial-quality materials, performing all necessary cutting and patching, and removing all debris from the site daily. Interested bidders must submit a detailed quote by October 30, 2026, including a comprehensive cost breakdown of labor and materials, a proposed service schedule, and a quote validity period of at least 60 days. Required administrative documentation includes a SAM.gov UEI number, active registration, Massachusetts business licenses, a signed W-9, and the ETR Vendor Acknowledgement form. Award selection is not based solely on the lowest price; ETR will evaluate cost, qualifications, and administrative compliance. The project is subject to federal regulations, including the Davis-Bacon Act, the Service Contract Act, and FAR clauses regarding debarment and anti-lobbying. Depending on the final contract value, payment and performance bonds may be required for projects exceeding 35,000 dollars.
Westover Job Corps Center

POSTED

about 6 hours ago

DEADLINE

in 1 day
View Details