Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on August 2, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Levi’s Stadium Asphalt Project

Closed
20260730025State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground utilities such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, site clearing, shoring, and subsurface investigation. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with the supply of ready mix and precast concrete. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. Qualified bidders must possess a valid California Contractor license and provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Interested firms must be certified by recognized agencies such as the SBA, MBDA, or CUCP prior to the bid opening. The deadline for responses is November 18, 2025, at 2:00 p.m., with invitations and instructions managed through the Building Connected system. Primary contact for this solicitation is Lead Estimator Ken Johnston.
Kiewit Infrastructure West Co.

POSTED

about 5 hours ago

DEADLINE

in 21 days
NAICS: 237310
New
SLED
Environmental Trust Department, Owhi Flats 2026
Solicitation # Owhi-Flats-RFB-2026.pdf
The Confederated Tribes of the Colville Reservation Environmental Trust Department is soliciting bids for the Owhi Flats 2026 watershed restoration project located within the Little Nespelem RMU. This firm-fixed-price construction contract involves decommissioning six road segments totaling 17,393 feet and installing two tank traps to improve water quality, enhance riparian habitat, and reduce road density impacts on wildlife. The scope of work includes decompacting road surfaces, applying straw mulch and woody debris, removing all non-natural materials such as culverts for approved disposal, and seeding surfaces back to natural vegetation. All work must adhere to Best Management Practices and specific Tribal Law and Order Codes regarding forest practices, water quality, hydraulic practices, fire management, and industrial safety. Selection will be awarded to the lowest responsive and responsible bidder who demonstrates specific experience in road decommissioning, stream crossings, and bank stabilization. Bidders must provide proof of at least 1,000,000 dollars in liability insurance and submit a complete bid packet including a work plan, equipment list, and Sams.gov registration. This solicitation is subject to Indian Preference and Tribal Employment Rights Ordinance (TERO) regulations, requiring a minimum of 51 percent of seasonal or temporary employees to be of Indian preference. Additionally, a 5 percent employment rights fee applies to contracts of 5,000 dollars or more. Sealed proposals must be received by 2 P.M. on October 29, 2026.
Confederated Tribes of the Colville Reservation

POSTED

about 10 hours ago

DEADLINE

in about 20 hours
NAICS: 237310
New
SLED
Silverbell Road Roadway Improvements - El Camino del Cerro to Goret Road
Solicitation # 270146
The Silverbell Road Roadway Improvements project, solicitation number 270146, is a major infrastructure initiative by the City of Tucson's Department of Transportation and Mobility. The project involves the reconstruction and widening of 3.27 miles of roadway, specifically 2.63 miles of Silverbell Road from 0.25 miles north of El Camino Del Cerro to 0.2 miles north of Goret Road, 0.50 mile of El Camino Del Cerro, and 0.14 mile of Sweetwater Drive. The scope of work includes the construction of four roadway lanes with medians, curbs, sidewalks, a multi-use path, traffic signals, street lighting, landscaping, irrigation, drainage facilities, and extensive utility work. The estimated price range for the project exceeds 10 million dollars. The contract is divided into two primary phases: a 730-calendar day construction phase and a subsequent 730-calendar day landscape establishment period. Bids are evaluated based on responsiveness and responsibility, with the award granted to the lowest responsive and responsible bidder. Key requirements include a bid security of 10 percent of the total offer and a 5 percent Small Business Enterprise participation goal. The project must adhere to various standards, including the 2015 Pima Association of Governments specifications and HUD guidelines for federally funded programs. Additionally, contractors must comply with stringent data protection and cybersecurity frameworks, ADA requirements, and environmental restrictions regarding herbicide use in protected washes.
Transportation & Mobility

POSTED

about 11 hours ago

DEADLINE

in 23 days
NAICS: 237310
New
SLED
Transit Area Asphalt Resurfacing
Solicitation # 26-044
The Transit Area Asphalt Resurfacing project, solicitation number 26-044, is a municipal construction contract for the City of Turlock, California, with an engineer's estimate of 233,000.00 dollars. The scope of work involves the cold milling and removal of a two-inch asphalt concrete layer, scarifying the native subgrade to 95 percent relative compaction, and applying a new asphalt concrete overlay across approximately 28,400 square feet of pavement at an active Transit Corporation Yard. The project concludes with the installation of permanent thermoplastic striping for bus parking stalls, which must be performed seven calendar days after paving to allow for proper curing. Due to the facility's role in daily CNG bus fueling, the project is subject to strict operational constraints, requiring work to be phased within tight weekend-only windows. The contract will be awarded to the lowest responsive and responsible bidder possessing either a Class A General Engineering or Class C-12 Earthwork and Paving contractor license. Required securities include bid and indemnity bonds of at least 10 percent of the bid amount, and performance and payment bonds equal to 100 percent of the contract price. All work must adhere to California prevailing wage rates for Stanislaus County and City of Turlock Standard Specifications. Performance is tightly scheduled, with substantial completion required within ten days of the Notice to Proceed.
Municipal Services-Engineering

POSTED

about 12 hours ago

DEADLINE

in 7 days
NAICS: 237310
New
SLED
Pedestrian Crossing Safety Improvements (FHWA)
Solicitation # 2025-041
The Pedestrian Crossing Safety Improvements project, solicitation number 2025-041, is a public works contract issued by the Seattle Department of Transportation with an estimated value between 3,250,000 and 3,350,000 dollars. The scope of work involves comprehensive infrastructure and safety enhancements across multiple locations in Washington, including 15th Ave S and Lander St, 33rd Ave S and Myrtle Pl, and several intersections along Rainier Ave S and Beacon Ave S. Key deliverables include the removal and restoration of sidewalks and pavement, installation of pedestrian islands, curbs, curb ramps, drainage structures, and the implementation of RRFB and traffic signals, signing, and channelization. The project also specifically includes electrical and rebar installation. The contract must be physically completed within 120 working days from the Notice to Proceed. Award will be granted to the lowest responsive bidder who meets mandatory and supplemental responsibility criteria, with a tie-breaker preference for the highest use of recycled materials. Compliance requirements are extensive, including a 13 percent Federal Small Business Enterprise goal, adherence to Buy America mandates, and compliance with Federal and State prevailing wage rates. Bidders must provide a bid guaranty of five percent of the total bid and are required to be registered with the federal System for Award Management. Submissions are primarily handled through the OpenGov portal, and the project adheres to the Americans with Disabilities Act and various City of Seattle and APWA general standard provisions.
Public Works

POSTED

about 13 hours ago

DEADLINE

in 7 days

AI Contract Overview

Show more

The Levi’s Stadium Asphalt Project is a construction contract for the repair and resurfacing of Gold Lots 4 and 5 and the south access road, Bill Walsh Way, located at Levi’s Stadium in Santa Clara, California. The scope of work includes crack sealing, application of slurry seal across the entire asphalt surface, and installation of new striping that matches existing conditions. The contractor is responsible for providing all labor, materials, equipment, tools, transportation, and permits, as well as the demolition, removal, and recycling of old materials. Work must be coordinated with Stadium Manager personnel to avoid disruptions to scheduled events and must comply fully with the Contract Documents, including Exhibit B (Plans and Specifications), Caltrans Standard Specifications and Plans (2025), and The Greenbook, while adhering to Cal/OSHA regulations, California environmental laws, and state recycling mandates. The project has a 60-calendar-day performance period beginning on the Notice to Proceed date, with all work required to be completed on-site at the stadium. The solicitation follows a Lowest Price Technically Acceptable (LPTA) evaluation model, where the award is made solely to the lowest responsive and responsible bidder after confirming technical acceptability—no qualitative scoring or trade-offs between cost and non-cost factors are used. Bids must be submitted electronically through the Stadium Manager’s e-Procurement Portal by the September 1, 2026 deadline, using only the official bid forms provided; substitutions or non-conforming formats will be rejected. Required submissions include a bid bond, payment and performance bonds, insurance documentation, certified payroll records, and a list of subcontractors responsible for more than 0.5% of the bid amount. Contractors must be registered under California labor laws, pay prevailing wages, and submit weekly certified payrolls and compliance forms. No contract value is stated due to blank pricing fields in the bid schedule, and no specific contracting officer, COR, or COTR is named, with oversight delegated to the Stadium Manager’s Representative. All work is subject to final inspection and acceptance at the project site, and the contractor bears full responsibility for corrections or rework at their expense.

General Info

Repair and resurface Gold Lots 4 and 5 and Bill Walsh Way with slurry sealing, new striping, and full material recycling.

Documents

1

RFB-FY26-0099 Levi's Stadium Asphalt Project

PDF, High priority: read this firstrfb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Forty Niners Stadium Management Company LLC
Contacts1 person available
OfficeN/A

Full Description

Show more
Bid #RFB-FY26-0099: The Levi’s Stadium Asphalt Project involves the repair of Gold Lots 4 and 5 and the south access road (Bill Walsh Way) to the parking lots. The scope of work includes sealing existing asphalt cracks, applying slurry seal to the entire asphalt surface in the specified lots and road, and installing new striping to match the previous design/existing conditions. The contractor is responsible for furnishing all labor, materials, equipment, tools, services, transportation, and permits. This also includes proper demolition, disposal, and recycling of old equipment and materials. The contractor must coordinate all work with Stadium Manager personnel to ensure no interruptions to scheduled events at Levi’s Stadium. The project requires adherence to all Contract Documents, including making necessary adjustments and coordination between various trades and existing building systems.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS