Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on July 3, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Levi’s Stadium Main Kitchen Equipment Project

Closed
RFB-FY26-0096State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
Solicitation 70LGLY27RSSB00001 is a total small business set-aside for a single firm fixed price contract to perform comprehensive interior renovations of Building 262 at the Federal Law Enforcement Training Center in Glynco, Georgia. The scope of work includes replacing corridor and classroom flooring with LVP and carpet tiles, fully remodeling restrooms, updating doors and life-safety components, and repainting interior surfaces. Technical upgrades involve installing raised flooring with integrated electrical distribution for classrooms, replacing variable air volume systems, and updating lighting controls and plumbing. The project is scheduled for a period of performance from January 11, 2027, to March 11, 2028, with a total duration of 425 calendar days after the notice to proceed. The procurement is managed by the Department of Homeland Security, with proposals due by November 18, 2026. Award evaluation is based on three factors of equal importance: past performance, corporate relevant experience, and price. Successful offerors must provide payment and performance bonds, as well as a bid guarantee of 20 percent of the bid price or 3 million dollars. Strict security protocols are in place, requiring background checks, FBI fingerprinting, and adherence to DHS non-disclosure agreements for personnel. All work must comply with ADA accessibility guidelines and prevailing wage determinations for the Georgia region.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 5 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The project scope is comprehensive, involving selective demolition, building envelope and roofing repairs, interior reconfiguration, and the installation of new finishes. Critical infrastructure upgrades include new HVAC systems, exhaust extraction, compressed air systems, a full NFPA-compliant fire suppression system, and updated electrical distribution, lighting, and building automation controls. Additionally, the project requires site improvements such as paving removal and replacement, drainage upgrades, and hazardous materials abatement. The contract has an estimated value between 10 million and 25 million dollars with a performance period of 730 days after award. Award will be based on the lowest price, with evaluation focused on two primary exhibit line items: building renovation and paving work. Proposals are due by November 23, 2026. Depending on the proposal value, contractors may be required to provide bid, payment, and performance bonds, with bid bonds set at 20 percent of the proposal amount. The work must adhere to the Davis-Bacon Act, the Buy American statute, and ADA accessibility guidelines. Invoicing is processed monthly via Wide Area Work Flow (WAWF) and requires extensive supporting documentation, including certified payrolls and updated construction schedules.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 10 days
NAICS: 236220
New
SLED
Modify Transfer Facility NBK Bangor
Solicitation # N44255-25-R-1502
Solicitation N44255-25-R-1502 is a firm-fixed-price design-build contract for the renovation and modernization of Transfer Facility Building 6594 at Naval Base Kitsap Bangor, Washington. With an estimated magnitude between 10 million and 25 million dollars, the project involves comprehensive upgrades to the exterior enclosure, roof, plumbing, electrical, HVAC, and fire protection systems, as well as the construction of a 400 square foot addition for forklift battery charging. A critical requirement of the project is a two-phase execution strategy that ensures the facility remains operational and mission-capable between phases, necessitating multiple mobilization and demobilization cycles. Phase 1 encompasses the primary design for both phases and initial construction, while Phase 2 focuses on the installation of new building equipment, including a prefabricated paint booth and the replacement of a 40-ton bridge crane. The contract mandates strict adherence to NAVFAC, UFC, and IBC standards, alongside rigorous cybersecurity and environmental compliance, including Puget Sound Clean Air Agency regulations. Performance timelines require work to commence within 15 calendar days of award, with the base bid completion due within 360 calendar days and an optional seismic upgrade component due within 1082 calendar days. Liquidated damages are set at 4,137 dollars per day for the base bid and 280 dollars per day for the option. Proposals must be submitted via the PIEE portal by December 7, 2026, and include a completed schedule of prices and an executed bid bond. Award will be based on the proposal determined to be most advantageous to the government, with payments processed through the Wide Area WorkFlow system.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 21 days
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project follows a fire sprinkler discharge that impacted the first, second, and third floors, including dormitories, offices, and medical areas. The scope of work involves architectural repairs such as drywall replacement, painting, ceiling tile and flooring installation, rubber wall base installation, electrical repairs, and the replacement of vanities and cabinets to restore the facility to its original condition. The total period of performance is 105 days, with substantial completion required within 90 days and final completion within an additional 15 days. This is an SBA set-aside opportunity open to small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified entities. Award will be based on best value, with evaluation weights assigned to price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must attend a mandatory pre-bid site visit and provide a detailed cost breakdown, a 90-day bid guarantee, and proof of a valid Massachusetts Contractor's License. The contract is subject to the Davis-Bacon Act, NFPA-101 life safety codes, ADA, OSHA, and EPA regulations. Payment terms are Net 30, and the contractor must name Adams and Associates, Inc. as an additional insured on their automobile liability policy.
Grafton Job Corps

POSTED

about 2 hours ago

DEADLINE

in 3 days
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
Career Systems Development Corporation, operating for the U.S. Department of Labor, is soliciting proposals for the interior renovation and repair of the North Wing dormitory at the Springdale Job Corps Center in Troutdale, Oregon. The project focuses on restoring water-damaged interior spaces to safe residential use, specifically targeting sixteen residential rooms and bathrooms, as well as mechanical rooms and common areas. The scope of work includes drywall installation, joint finishing, and painting for approximately 300 square feet of floor area in utility rooms and hallways, along with the temporary disconnection and re-installation of HVAC equipment, water heaters, and furnaces. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. The project is subject to the Davis Bacon Act under wage determination OR20260100, requiring the submission of weekly certified payrolls. Awarded contractors must provide payment and performance bonding for the full project value, as well as proof of liability and worker's compensation insurance, within ten days of award. Proposals must include detailed relevant experience, a comprehensive work plan addressing project phasing and occupied-building protection, and itemized pricing by room and trade. A minimum one-year workmanship warranty is required upon final acceptance by CSD.
Career Systems Development Corporation

POSTED

about 2 hours ago

DEADLINE

in 6 days

AI Contract Overview

Show more

The project involves the complete replacement of aging kitchen service equipment in the main kitchen at Levi’s Stadium in Santa Clara, California, including demolition and disposal of existing units, procurement and installation of new food service equipment, and all necessary modifications to electrical and plumbing systems to ensure full integration and functionality. The contractor is responsible for all aspects of the work, from obtaining required permits to coordinating with other trades and adhering to strict jobsite rules outlined in Exhibit H, which governs access, safety, conduct, and operational protocols—including no smoking or alcohol, mandatory PPE, daily cleanup, and restrictions on work near major events. All work must comply with the latest edition of The Greenbook, the project’s Plans and Specifications, and Special Conditions, while meeting California labor laws, environmental regulations, and OSHA standards. Performance is measured by adherence to the 90-calendar-day schedule beginning upon Notice to Proceed and successful final inspection and acceptance at the stadium site. Bid submissions must be made electronically through the Bonfire e-Procurement Portal and include mandatory certifications and exhibits: Workers’ Compensation Certification, Public Works Contractor Registration with DIR, Payment and Performance Bonds, Procurement Integrity Guidelines, and Levi’s Stadium Jobsite Rules compliance. The evaluation and award process follows a Lowest Price Technically Acceptable (LPTA) methodology, where technical acceptability is determined by responsiveness and responsibility, and award is made solely to the lowest-priced bidder meeting minimum requirements. No CLIN or pricing breakdown is provided, as bids are submitted as a single lump sum. Contractors must also comply with non-collusion declarations, Iran contracting prohibitions, and strict social media policies, with no federal accountability codes or military standards referenced; instead, state-level compliance and stadium-specific procedures govern all contractual obligations.

General Info

Replace outdated kitchen equipment at Levi’s Stadium, coordinate utilities, secure permits, bid due August 26, 2026.

Documents

3
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstrfb
High
PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Forty Niners Stadium Management Company LLC
Contacts1 person available
OfficeN/A

Full Description

Show more
Bid #RFB-FY26-0096: The project involves the replacement of existing, aging kitchen service equipment in the main kitchen at Levi’s Stadium. The scope includes the demolition and disposal of old equipment and associated utilities. The contractor will furnish and install new food service equipment as detailed in the plans and specifications. The work also includes all necessary modifications to electrical and plumbing utilities to ensure the new equipment is fully functional and integrated. The contractor is responsible for all aspects of the project, including obtaining necessary permits and coordinating all trades.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS