Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from California was posted on June 18, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

LFG Extraction Well Installation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Seminole Boat Ramp
Solicitation # 26-0075-MA
The City of Clearwater is soliciting bids for the Seminole Boat Ramp Restoration project in Clearwater, Florida. The scope of work involves the comprehensive repair and reconstruction of eight launching ramps across four bays, designed to accommodate vessels exceeding 35 feet and weighing over 10 tons. Key project activities include the demolition of existing concrete structures, dredging and grading of native soils, placement of various gravel fills, and the installation of new concrete ramps using either a precast slab system or pour-in-place solution. Additionally, the contractor is responsible for the temporary relocation and re-anchoring of floating docks to ensure ADA-compliant travel, the installation of articulated concrete mattresses for scour protection, and the implementation of strict environmental controls, including turbidity curtains and stormwater pollution prevention plans. Bidders must be pre-qualified in Marine Construction for at least 750,000 dollars and provide a bid security deposit equal to 10 percent of their maximum bid price. The project must be completed within 180 calendar days from the Notice to Proceed, with a hard deadline for full public restoration by February 15, 2027. To minimize public disruption, the contract limits the simultaneous closure of all four ramps to a maximum of 45 calendar days. Performance will be verified through third-party topographic surveys, with acceptance based on post-grading soundings compared to the design template. Progress payments will be prorated monthly based on the physical percentage of project completion.
Public Works

POSTED

about 5 hours ago

DEADLINE

in 21 days

AI Contract Overview

Show more

The contract entails the drilling and installation of new landfill gas extraction wells on a quarterly basis, involving the creation of boreholes, installation of perforated casings, and placement of gravel packs to facilitate efficient gas collection. These wells must be properly connected to existing gas collection headers to ensure safe and effective extraction of methane and other gases from the landfill site. The work is governed under NAICS code 237990 and is structured as a subcontract under the Waste Management and Recycling agency in California, with a response deadline of July 23, 2026. All activities must comply with environmental and operational standards to support long-term landfill gas management and emissions reduction goals.

General Info

Quarterly landfill gas well drilling and installation with gas header connections for emissions reduction.

Documents

This scope was carved out of 4699.

The full solicitation package (7 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Quarterly LFG Well Installation Services, 2026

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Waste Management and Recycling
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Drilling and installing new landfill gas extraction wells, including borehole creation, placement of perforated casings and gravel packs, and connection to gas collection headers on a quarterly basis.

More opportunities from California → Waste Management and Recycling

Same awarding agency

NAICS: 237990
New
SLED
Kiefer Landfill- Module 5, Phase 1 Liner Construction
Solicitation # 4711
The County of Sacramento Department of Waste Management and Recycling is soliciting sealed bids from Class A General Engineering Contractors for the Kiefer Landfill Module 5, Phase 1 Liner Construction. This project involves the installation of a multi-layered base liner system, including a two-foot soil operations layer, nonwoven geotextiles, LCRS gravel, and two layers of 60-mil HDPE double-sided textured geomembrane separated by secondary geocomposites and Geosynthetic Clay Liners. The scope of work further encompasses earthwork for soil excavation and stockpiling, construction of leachate collection and removal systems, side slope riser piping, stormwater components, surface water drainage structures, and the extension of the perimeter access road and various utility alignments. The estimated construction cost for the project is 29,000,000 dollars, which includes a 500,000 dollar incentive for early completion by March 15, 2028. The contract duration is 350 working days. Bids must be submitted electronically via the Sacramento County Electronic Bidding Portal by November 5, 2026, at 2:00 pm. Award will be granted to the lowest qualified, responsive, and responsible bidder, with responsiveness contingent upon the inclusion of all required lump sum and unit prices. Contractors are required to provide bid security of at least 10 percent of the aggregate bid sum and must execute performance and payment bonds for 100 percent of the contract price upon award. Compliance with prevailing wage rates, CAL-OSHA regulations, and federal non-discrimination statutes is mandatory. All work must adhere to strict technical specifications and is subject to oversight by the Design Engineer and a Construction Quality Assurance Consultant, with specific requirements for material handling, storage, and welding certifications for pipe installation.
Other Heavy and Civil Engineering Construction

POSTED

2 days ago

DEADLINE

in 8 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS