Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on September 16, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Liberator Request for Information (previously Liberator & Hunter Classified Industry Day)

Closed
N00024-25-R-6318Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

N/A

Place of Performance

DC, 20003, USA

Set-Aside

NONE

Documents

1

N00024-25-R-6318 Liberator Terms of Use Agreement

PDF, Low priorityspecial-notice
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

7 updates
PhaseClosed
Posted

Sources Sought

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Response deadline changed from Jul 15, 2025 to Sep 29, 2025. The notice title changed. The notice description changed. The point of contact changed.

Notice updated

The notice title changed. The notice description changed. The point of contact changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navsea Hq
Contacts2 people available
OfficeWASHINGTON NAVY YARD, DC, 20376-5000, USA
Office AddressWASHINGTON NAVY YARD, DC, 20376-5000, USA
Contacts
Caryl Williams
Antoinette Miles

Full Description

Show more
Date: 16 September 2025 This Industry Day Notice is updated to a Request for Information (RFI). Documents provided: Draft Liberator Statement of Work (SOW) (Rev. C) (ATTACHMENT 1) To obtain access to the draft SOW, interested parties shall submit a completed Liberator Terms of Use Agreement (TOU), provided as a ATTACHMENT 2 to this notice AND request access to the restricted document in the SAM post. Entity POC(s) requesting access to the restricted document in SAM must have either the Administrator or Data Entry role associated with their SAM profile. It is the responsibility of the entity to ensure appropriate role mapping and structure in the SAM system. Restricted documents will not be provided via other means outside of SAM. The entity POC requesting access to the restricted document in SAM must be represented on the signed TOU form. Government Furnished Information (GFI): (available upon request) Top Level Requirements Document (TLRD) draft - (CLASSIFIED) Concept/General Government Information - (CLASSIFIED) Requests for the CLASSIFIED GFI shall be directed to: Mr. Alex Deluca at alexander.b.deluca.civ@us.navy.mil Provide your Company's JCP certification, full mailing address, and point of contact (POC) (including email and phone number) where the classified material can be delivered. Government Request for Information (RFI) from Industry by 29 September 2025: Please review Liberator draft SOW and available GFI. Provide comments, recommendations or proposed changes to improve the documentation package for final Solicitation, should one be released. The solicitation will cover the development, test and initial Liberator system prototypes, if released. The Government will not provide individual feedback or responses to RFI responses, rather use this information to improve the Solicitation documentation, should one be released. Please submit your UNCLASSIFIED draft SOW and GFI comments/questions/recommendations to: Agreements Officer, Ms. Antoinette Miles, antoinette.m.miles.civ@us.navy.mil Agreements Specialist, Ms. Caryl Williams, caryl.a.williams.civ@us.navy.mil Format Requirements of the RFI responses: 10-page limit, inclusive of contact information. Times New Roman 10 (or larger) Single-spaced. Smaller type may be used in figures and tables but must be clearly legible. No pictures of a marketing/advertising nature or hyperlinks are allowed. File format must be Microsoft Word or PDF. These RFI submissions will be shared with the Government; therefore, all information must be non-proprietary. Do not submit classified information. Additional Government Request: If your company has the capability to eventually deploy or retrieve the Liberator system (whether you are interested in becoming the Liberator prime contractor(s) or not), please provide details of such capability for consideration to the UNCLASSIFIED POCs, Antoinette Miles (antoinette.m.miles.civ@us.navy.mil ) and Caryl Williams (caryl.a.williams.civ@us.navy.mil). There is currently no Security Classification Guideline for the Liberator program. Consider the following criteria when responding to the RFI, as this information is considered SECRET: Mission specific, capabilities, design details and limitations Program Protection specifics Specific payloads and payload quantities Planned production quantities This RFI is issued solely for information purposes. It does not constitute a Solicitation or a promise to issue a Solicitation in the future. This RFI does not commit the Government to contract for any supply or service in any manner. Respondents are advised that the U.S. Government will not pay for any information or administrative costs incurred in response to this RFI; all costs associated with responding to this RFI will be solely at the interested parties' expense. Not responding to this RFI does not preclude participation in any future Solicitation, if any is issued. --------------------------------------------------------------------------------------- Industry Day Overview: On 24 and 25 July 2025 the Program Executive Office Unmanned and Small Combatants (PEO USC), Unmanned Maritime Systems Program Office (PMS 406) will host an Industry Day to present and discuss the Liberator and Hunter programs. This Industry Day aims to improve Industry's understanding of the Liberator and Hunter programs. The objective is to provide Government information and solicit Industry feedback to inform the development and procurement strategy of future Liberator and Hunter systems. The target audience for this event includes both existing and new Industry partners with at least a SECRET clearance. This Special Notice is for information and planning purposes only and shall not be construed as a solicitation for proposals, proposal abstracts, proposal quotations, or as an obligation on the part of the Government. Industry Day Information: Industry Day event will be held in person in the Washington, D.C. metro area. Attendance requires pre-registration, which will be available on a first-come-first-served basis. Companies must complete and submit the Liberator-Hunter Industry Day Pre-Registration Form attached to this notice to pre-register. Only pre-registered and confirmed companies will receive the event location via separate correspondence. On-site registration will not be permitted. Due to space limitations, attendance is limited to two representatives per company; no more than two individuals per company will be allowed in the event space. Industry Day will include information classified up to the SECRET level, and the Government will present information considered Distribution Statement D. Access is restricted to U.S. DoD Contractors with an active Defense Security Service (DSS)-issued SECRET facility and personnel clearances only. Attendees may not bring phones, laptops, or any recording devices into the event. While lock boxes/storage lockers will not be available, a central location will be provided for storing mobile devices. The registration deadline is 1700 ET on 15 July 2025, or when the attendance limit is reached, whichever comes first. ATTENDEES MUST POSSESS AT LEAST A SECRET CLEARANCE. ONLY THOSE INDIVIDUALS WITH VALIDATED SECURITY CLEARANCES AND UNITED STATES CITIZENSHIP WILL BE PERMITTED TO ATTEND. (1) All potential attendees must submit a visit request in DISS with the following information no later than 1700 EST on 15 July 2025.Attendees who fail to submit a DISS request will not be allowed to attend. CACI INC. FEDERAL 1201 M St SE, Suite 400 Washington, DC 20003 SMO Code: 868S6 Attn: CACI Technical POC Name & Phone Number (Needed for DISS) TPOC: Jon Buttram, 202.807.4662 Security POC: Iris McPhatter, 202.807.4739 (2) Once the DISS visit request has been submitted, your company must email confirmation that the request has been submitted to the Government points of contact provided in this notice, along with the following information: Company information, including Company Name, Company address, Commercial and Government Entity (CAGE) Code; Confirmation statement regarding capability to meet the aforementioned attendance information; Attendee information to include full name, email, and phone number; A completed Liberator-Hunter Industry Day Pre-Registration Form, the template for which is provided as ATTACHMENT 1 to this notice; and A completed Liberator-Hunter CUI Information Sheet Terms of Use Agreement, the template for which is provided as ATTACHMENT 2 to this notice. Companies determined to have the required clearances will be registered for the Industry Day and will be sent a Distro D Controlled Unclassified Information (CUI) information sheet ahead of the Industry Day. If, after reviewing the CUI information sheet, a company no longer wishes to attend the Industry Day, that company shall notify the POCs identified on the registration form. Government Points of Contact: Caryl Williams Lead Contract Specialist caryl.a.williams.civ@us.navy.mil Emma Culver Contract Specialist emma.r.culver2.civ@us.navy.mil The Industry Day will be conducted in two parts: Part 1. Main presentation to all attendees on 24 July 2025 from 0900 to 1400 ET with the Government presenting Liberator and Hunter information at the SECRET level. Part 2. Individual engagement sessions between individual companies and the Government on 25 July 2025. Engagement sessions are not required in order to attend the main presentation. Engagement sessions will be scheduled on a first-come-first-served basis but are not guaranteed. The location and time of a company's engagement session will be provided directly to each company. There will be no hand-out materials provided to industry for this event. Written questions must be UNCLASSIFIED and may be submitted before, during, or after the event using the Liberator-Hunter Question-Feedback Form, provided as ATTACHMENT 3 to this notice. Unclassified Industry questions or feedback and Government responses will be distributed after the event. Notional Liberator and Hunter Industry Day Agenda: The notional agenda for the Industry Day is provided below. This agenda is subject to change. Day 1 (Thursday 24 July 2025): Government Main Presentation (SECRET) 0830-0900: Check-In 0900-1100: Government Presentation 1100-12:00: Lunch (not provided) 1200-1330: Government Presentation Continues 1330-1400: Wrap Up Day 2 (Friday 25 July 2025): Engagement Sessions 0900-1700: Engagement Sessions As part of the engagement sessions, the Government is interested in industry feedback in the following areas: The Government is interested in obtaining operational prototypes as quickly as possible. What is an aggressive but achievable schedule for delivering operational prototypes including system design, fabrication, and functional testing? What impact does the quantity of operational prototypes have on achievability of schedule? The Government is interested in understanding industry's capacity and availability for system design, prototype fabrication, and prototype testing. What are the key risk areas to deliver operational prototypes quickly? The Government is interested in understanding industry's relevant experience with comparable efforts. The Government is interested in understanding industry's capacity to scale to production of Liberator and Hunter systems following delivery and test of operational prototypes. Attachments: 1. Liberator-Hunter Industry Day Pre-Registration Form 2. Liberator-Hunter CUI Information Sheet Terms of Use Agreement 3. Liberator-Hunter Question-Feedback Form DISCLAIMER: This pre-solicitation notice is for information only and shall not be construed as a commitment by the Government to solicit contractual offers or award contracts. Prior to release of a formal solicitation, the Government will not solicit, nor will it accept proposals as a result of this synopsis. The Government will not reimburse the cost of any submission in response to this announcement; the entire cost of any submission will be at the sole expense of the source submitting the information. If a solicitation is issued in the future, it will be announced under Contract Opportunities via the System for Award Management (SAM) website (https://sam.gov/) and interested parties must comply with that announcement. The Government will not reimburse respondents for any questions submitted or information provided as a result of this notice.

More opportunities from Department Of Defense → Navsea Hq

Same awarding agency

NAICS: 334511
New
Federal
AN/BYG-1 Applications Re-Architecture
Solicitation # N0002426R6222
Solicitation N0002426R6222, issued by the Naval Sea Systems Command (Navsea HQ), seeks a contractor for the AN/BYG-1 Applications Re-Architecture. This effort involves the re-architecting of applications associated with the AN/BYG-1 system. The solicitation was posted on October 7, 2026, with a response deadline of November 5, 2026. The primary point of contact for the effort is Michael Ravnitzky, with Matthew C. Hedrick serving as the Contracting Officer. Due to the sensitive nature of the work, strict security and data handling requirements are in place. Offerors must possess a SECRET security clearance and provide a verified DD Form 2345 Military Critical Technical Data Agreement and a signed Terms of Use Agreement to access Government Furnished Information, source code, and technical documents. All data must be handled in accordance with NISPOM standards, and the transmission of information to foreign nationals or outside the United States is prohibited without a valid export license. Furthermore, the use of public cloud repositories or external AI tools for processing technical data is strictly forbidden. Contractors are required to destroy all provided data within 180 days of the RFP closing and maintain destruction records for five years.
Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing

POSTED

1 day ago

DEADLINE

in 16 days
View Details
NAICS: 334511
New
Federal
Navy Electronic Chart Display and Information System (ECDIS) Hardware and Software Production
Solicitation # N00025-26-R-5246
The U.S. Navy, through the Portfolio Acquisition Executive Mission Systems and Program Manager Warfighting / Applications (PMW/A 520), is soliciting proposals for the development, production, integration, testing, fielding, and lifecycle sustainment of the Electronic Chart Display and Information System (ECDIS) hardware and software. This full and open competition supports both surface and subsurface platforms, specifically focusing on the manufacture and assembly of AN/SYN-1 and Scalable IBS (S-IBS) hardware, alongside the maintenance and modification of software using Government Furnished Information. The contract is structured with one base year and four one-year option periods beginning in FY27, with award anticipated in Q4 FY27. The procurement utilizes a best-value tradeoff process, prioritizing technical approach and management approach over total evaluated cost and price, while past performance is rated on an acceptable or unacceptable basis. Hardware deliverables are priced via a stepladder structure, while software and hardware engineering support are provided as cost-plus-fixed-fee level-of-effort tasks. Key requirements include a Secret facility and personnel clearance, compliance with ANSI/ASQ/ISO9001:2015 quality standards, and strict adherence to cybersecurity and CUI protection frameworks. Deliveries are generally FOB Destination, with specific timelines ranging from 60 days to 18 months after award or option exercise.
Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing

POSTED

1 day ago

DEADLINE

in 3 months
View Details
NAICS: 336611
New
Federal
USS MAKIN ISLAND (LHD 8) FY28 Docking Selected Restricted Availability (DSRA) Request for Proposal(s)
Solicitation # N0002426R4421
The Naval Sea Systems Command (NAVSEA) is soliciting proposals for the USS MAKIN ISLAND (LHD 8) Fiscal Year 2028 Docking Selected Restricted Availability (DSRA). This Signature Availability is a comprehensive effort combining maintenance, modernization, and repair, requiring a contractor with substantial West Coast facilities, including a capable pier and dry-dock. The scope of work is extensive, with estimated man-days of approximately 284,631 for maintenance and 38,416 for modernization, covering areas such as hull structure, propulsion and electric plants, auxiliary systems, and structural welding. The government anticipates making a single Firm Fixed-Price award in or before March 2027, with performance beginning in November 2027 and an expected completion date of October 30, 2029. The procurement is not set aside for small businesses due to the complexity and magnitude of the requirements. Proposals will be evaluated based on Best Value using trade-off procedures, focusing on technical eligibility, physical resource capacity, past performance, manpower, small business participation, and the proposed schedule and execution approach. Key deliverables include an integrated production schedule and an initial duration analysis due 60 days post-award. The contract includes specific provisions for growth work, including an estimated 211,989 direct labor hours and over 9.5 million dollars in materials, as well as a Small Dollar Value Growth incentive program. Offerors must be registered in the System for Award Management and submit proposals via the PIEE Solicitation Module by November 9, 2026.
Ship Building and Repairing

POSTED

5 days ago

DEADLINE

in 20 days
View Details
NAICS: 333415
Federal
Shipboard Air Conditioning Plant System Sustainment Plan (SSP)
Solicitation # N0002427R4452
Navsea HQ is conducting market research under solicitation N0002427R4452 to identify capable sources for the Shipboard Air Conditioning Plant System Sustainment Plan (SSP). This initiative aims to standardize and scale the sustainment of centrifugal, reciprocating, and rotary air conditioning plants for U.S. Navy surface ships worldwide. The government is evaluating various acquisition strategies, including a single-award Indefinite Delivery, Indefinite Quantity (IDIQ) contract or multiple-source arrangements, to improve materiel condition and operational availability across diverse ship classes and geographic locations. The contemplated scope of work encompasses six primary capability areas: executing Major AC Plant Pit Stops and overseeing Minor Pit Stops, both of which must be completed within a mandatory six-week window; providing embedded AC&R technical expertise at Shore Intermediate Maintenance Activities (SIMAs) for Sailor training and oversight; supplying OEM AC plant materiel and repair parts; managing a global warehouse and rotable pool for Overhaul Parts Packages (OPPs); providing configuration-specific engineering, technical data, and integrated product support; and delivering global unplanned and emergent field services. Interested respondents must submit a response by October 28, 2026, including a completed Capability Certification Matrix and supporting evidence of their ability to perform these requirements organically or through teaming arrangements.
Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing

POSTED

7 days ago

DEADLINE

in 8 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS