Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Lift Station # 1 Seawall Replacement-Repair Project

Open
State & Local
Response DeadlineDue in 41 days
Solicitation #
city-of-cocoa-B-27-06-COC-2027

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Cocoa has contracted for the Lift Station No. 1 Seawall Replacement-Repair Project located at 210 Riverside Drive, Cocoa, Florida. The scope of work involves the repair and replacement of approximately 60 linear feet of seawall and the maintenance and modification of an existing stormwater outfall pipe. The contractor is responsible for providing all necessary labor, materials, equipment, and supervision to complete the project in accordance with the provided engineering plans and specifications. Key project phases include mobilization, the installation of temporary erosion control measures such as turbidity barriers to protect the Indian River Lagoon, and the demolition of the existing deteriorated seawall. The contractor will install heavy-duty sheet piling with corresponding tieback systems and a concrete or composite cap. Final requirements include site restoration, backfilling, and demobilization. The contractor is responsible for obtaining all necessary permits and providing a detailed work schedule upon receiving the notice of award.

General Info

City of Cocoa contracts seawall replacement and stormwater pipe repair at Lift Station 1.

Place of Performance

Not specified

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Potential competitors

5 companies
5similar awards
  • RANDY KINDER EXCAVATING INC 20%
  • RUSSELL BOATS INC. 20%
  • TRI-STATE DESIGN CONSTRUCTION CO INC/KC CONSTRUCTION COMPANY - A JOINT VENTURE 20%
  • Other companies 40%
  1. 2RUSSELL BOATS INC.1 similar awards
  2. 4W. F. MAGANN CORP1 similar awards
  3. 5Weinrich Contracting1 similar awards

Review awarded contracts behind each match to see who has relevant experience.

Explore potential competitors
Due in 41 days

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

Contract opportunity posted

Response Deadline

Submission deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more

Interested Companies (54)

A & P Heavy CivilNORTH MIAMI BEACH, Florida
allied
AquafinElkton, Maryland

See All 54 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
The Contractor shall furnish all necessary labor, materials, equipment, supervision, and incidentals required to complete the City of Cocoa Lift Station No. 1 Seawall Replacement-Repair Project. The project entails the repair and replacement of approximately 60 linear feet (LF) of seawall and maintaining/modifying an existing stormwater outfall pipe that outfalls into the lagoon, located at 210 Riverside Drive, Cocoa, Florida 32922, in strict accordance with the project specifications and engineering plans.
1. Mobilization and General Requirements • Description: Includes all initial activities, administrative setups, and facility provisions necessary to mobilize personnel, equipment, and materials to the site. • Key Tasks: o Obtain all required local, state, and environmental permits prior to construction start. o Establish temporary project signage, safety fencing, and secure staging/storage areas around Lift Station 1. o Implement maintenance of traffic (MOT) plans if construction access impacts local roadways or public right-of-ways. o Coordinate utility locates (Sunshine 811) and protect existing on-site electrical, water, and wastewater infrastructure. 2. Temporary Erosion Control • Description: Installation and maintenance of Best Management Practices (BMPs) to prevent sediment runoff and protect adjacent waterways (e.g., the Indian River Lagoon) during construction. • Key Tasks: o Install turbidity barriers, silt fencing, and floating silt curtains around the marine work zone. o Maintain and inspect erosion control devices daily, especially after heavy rain events, throughout the duration of the project. o Remove and properly dispose of all temporary erosion controls once final site stabilization is achieved. 3. Excavation and Site Work • Description: Controlled excavation, grading, and removal of existing failed structure elements to prepare for the new alignment. • Key Tasks: o Carefully demolish and haul away approximately 60 linear feet of the deteriorated existing seawall structure (and legacy cap/panels). o Perform necessary localized earthwork, soil excavation, and grading behind the new wall alignment to facilitate tieback and cap installation. o Backfill and compact subgrades safely around critical lift station infrastructure without causing structural settlement or utility disruption. 4. Sheet Pile Material and Installation • Description: Procurement, driving/installation, and capping of roughly 60 linear feet of heavy-duty sheet piling designed for marine durability and structural load support. • Key Tasks: o Supply specified sheet pile materials (e.g., vinyl, composite, or reinforced concrete/steel per engineering design) engineered for local tidal ranges and soil conditions. o Drive or vibrate sheet piles to the specified design depth along the 60 linear foot alignment. o Install corresponding tieback systems, deadmen, wales, and a robust poured-in-place concrete or composite seawall cap to lock the system together. 5. Site Restoration, Final Clean Up, and Demobilization • Description: Restoring the work area to its original or improved condition, removing equipment, and completing final project closeout. • Key Tasks: o Backfill remaining voids, grade disturbed earth, and restore ground surfaces (e.g., sodding, gravel replacement, or concrete flatwork repair). o Remove all construction equipment, remaining materials, temporary facilities, and structural debris from the site. o Conduct a thorough final clean-up of the work area, including sweeping access paths and removing temporary turbidity curtains once water conditions stabilize. All work shall be constructed according to the Construction Plans and Specifications and are made part of the contract by reference as Exhibit A.
The Contractor shall construct the project per: • The jurisdiction for the project site is the City of Cocoa, Florida. All work shall be permitted and undertaken in accordance with applicable codes and ordinances. • Prime contractor is assumed to be familiar with all general condition’s/contract requirements associated with the contract between owner and contractor as they apply to the work noted on the detailed construction plans and specifications, attached herein as Exhibit A.[DK2.1][JF2.2][BD2.3][DK2.4] Prime contractor shall transfer all such requirements to all subcontractors. • All contractors shall examine job site prior to submission of a bid to observe all visible existing conditions. submission of bid will be taken to confirm familiarity with conditions of the work, so the bid price includes all work necessary to provide a completed, ready-to-occupied project. • Contractor shall obtain all permits required to undertake the work unless noted otherwise. • Prior to receiving a notice-to-proceed, the owner will file a notice-of-commencement with appropriate authority. • The contractor shall deliver a work schedule immediately after receiving a notice of award showing all tasks and completion dates. • The contractor will be responsible for providing all labor, materials, and equipment necessary to perform the work.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
International
Lac La Biche County - Request for Quotes - Drainage Program TR-32-2026-18
Solicitation # TR-32-2026-18
Lac La Biche County is seeking quotations for the provision of drainage services on an as-needed basis for a three-year period. The scope of work includes ditching, grading, excavation, culvert installation and replacement, cleaning, drainage restoration, erosion control, and assistance with beaver control operations. These services will be performed at various locations throughout the county, primarily along county roads, within rights-of-way, and within drainage systems. The successful contractor must provide all necessary labor, equipment, and materials, ensuring that all personnel are qualified and equipment is maintained in good working condition with appropriate safety devices. The contract is open to multiple contractors, and the county reserves the right to award the work to a bidder other than the lowest-priced respondent based on factors such as capability, schedule, and qualifications. Bidders must submit two hard copies and one electronic PDF copy on a USB flash drive by December 14, 2026, at 2:00 p.m. Alberta Time. Pricing must be submitted in Canadian dollars using the provided pricing sheet, covering mobilization, minimum callout rates, and hourly equipment rates. Payment terms are set at 30 days upon receipt of a satisfactory invoice, which must include the purchase order number and separate GST details. All deliverables are delivered F.O.B. Destination, and the county maintains the right to reject any equipment or operators deemed unsuitable or unsafe.
Lac La Biche County

POSTED

about 8 hours ago

DEADLINE

in 18 days
View Details
NAICS: 237990
New
SLED
Culvert Cleaning
Solicitation # 70-80500-26-17254
The New Mexico Department of Transportation is establishing a price agreement for statewide culvert cleaning services to remove silt, sand, debris, and vegetation from drainage structures, including catch basins, manholes, and drop inlets. The scope of work includes performing cross-section surveys of inlets and outlets both before and after cleaning, implementing environmental controls for water discharge, and hauling waste materials to approved landfills. All work must be performed within the department's right-of-way limits and is subject to the direction and approval of the District Engineer or their designee. Bids will be awarded based on the lowest cost following a determination of product acceptability and technical qualifications. The state may issue multiple awards to ensure timely delivery, with selection for specific projects typically based on the lowest individual project estimate or the ability to meet the project schedule. Contractors must perform at least 40% of the work with their own organization and provide performance, payment, and materials bonds equal to 100% of the total purchase order. Additionally, contractors with six or more employees working an average of 20 hours per week over six months must provide health insurance if the aggregate annual contract value exceeds $250,000. Payment terms are Net 30, with invoices submitted directly to the using agency.
NM DEPARTMENT OF TRANSPORTATION

POSTED

about 11 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SLED
The Awesome Spot Playground - Phase 1B
Solicitation # 2027-04
The City of Modesto is soliciting bids for project number 2027-04, the construction of The Awesome Spot Playground - Phase 1B in Modesto, California. The scope of work includes site preparation, selective demolition, earthwork, grading, and the installation of concrete work, metal fabrications, and playground equipment. Key deliverables include the installation of poured rubber and synthetic turf surfacing, decorative metal fencing, irrigation, and various site furnishings such as benches, shade canopies, and custom art. The contractor is responsible for coordinating electrical work with another contractor and installing City-provided elements. The project has an estimated base bid value of $2,074,305 and must be completed within 80 working days from the Notice to Proceed. Bids must be submitted electronically via the OpenGov Procurement Portal by December 15, 2026. Requirements include a bid security of at least 10 percent of the bid amount, a Local Hire Certification, and a Skilled and Trained Workforce Certification. The contractor must provide a five-year special warranty covering structural failures and material deterioration upon substantial completion. All playground equipment must comply with ASTM F1487 and carry the IPEMA Certification Seal. The project requires the payment of prevailing wages and adherence to ADA compliance and California safety orders. Administrative management, including progress payments and submittals, will be handled through the e-builder Project Management Information System. There is no set-aside status specified for this solicitation.
City of Modesto

POSTED

about 15 hours ago

DEADLINE

in 19 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS