Lift Station # 1 Seawall Replacement-Repair Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The City of Cocoa has contracted for the Lift Station No. 1 Seawall Replacement-Repair Project located at 210 Riverside Drive, Cocoa, Florida. The scope of work involves the repair and replacement of approximately 60 linear feet of seawall and the maintenance and modification of an existing stormwater outfall pipe. The contractor is responsible for providing all necessary labor, materials, equipment, and supervision to complete the project in accordance with the provided engineering plans and specifications. Key project phases include mobilization, the installation of temporary erosion control measures such as turbidity barriers to protect the Indian River Lagoon, and the demolition of the existing deteriorated seawall. The contractor will install heavy-duty sheet piling with corresponding tieback systems and a concrete or composite cap. Final requirements include site restoration, backfilling, and demobilization. The contractor is responsible for obtaining all necessary permits and providing a detailed work schedule upon receiving the notice of award.
General Info
Agency
Place of Performance
Set-Aside
Documents
0No documents available
Documents will appear here when they are available.
AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Potential competitors
5 companies- RANDY KINDER EXCAVATING INC 20%
- RUSSELL BOATS INC. 20%
- TRI-STATE DESIGN CONSTRUCTION CO INC/KC CONSTRUCTION COMPANY - A JOINT VENTURE 20%
- Other companies 40%
Review awarded contracts behind each match to see who has relevant experience.
Explore potential competitorsGet what you need to respond
No documents were posted with this contract.
- Buyer contactEmail
- Original solicitationLink to the source posting
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Contract opportunity posted
Submission deadline
Organization & Contact Information
Interested Companies (54)
See All 54 Interested Companies
Get full access to view all interested companies, their contact details, and full contractor profiles.
Full Description
1. Mobilization and General Requirements • Description: Includes all initial activities, administrative setups, and facility provisions necessary to mobilize personnel, equipment, and materials to the site. • Key Tasks: o Obtain all required local, state, and environmental permits prior to construction start. o Establish temporary project signage, safety fencing, and secure staging/storage areas around Lift Station 1. o Implement maintenance of traffic (MOT) plans if construction access impacts local roadways or public right-of-ways. o Coordinate utility locates (Sunshine 811) and protect existing on-site electrical, water, and wastewater infrastructure. 2. Temporary Erosion Control • Description: Installation and maintenance of Best Management Practices (BMPs) to prevent sediment runoff and protect adjacent waterways (e.g., the Indian River Lagoon) during construction. • Key Tasks: o Install turbidity barriers, silt fencing, and floating silt curtains around the marine work zone. o Maintain and inspect erosion control devices daily, especially after heavy rain events, throughout the duration of the project. o Remove and properly dispose of all temporary erosion controls once final site stabilization is achieved. 3. Excavation and Site Work • Description: Controlled excavation, grading, and removal of existing failed structure elements to prepare for the new alignment. • Key Tasks: o Carefully demolish and haul away approximately 60 linear feet of the deteriorated existing seawall structure (and legacy cap/panels). o Perform necessary localized earthwork, soil excavation, and grading behind the new wall alignment to facilitate tieback and cap installation. o Backfill and compact subgrades safely around critical lift station infrastructure without causing structural settlement or utility disruption. 4. Sheet Pile Material and Installation • Description: Procurement, driving/installation, and capping of roughly 60 linear feet of heavy-duty sheet piling designed for marine durability and structural load support. • Key Tasks: o Supply specified sheet pile materials (e.g., vinyl, composite, or reinforced concrete/steel per engineering design) engineered for local tidal ranges and soil conditions. o Drive or vibrate sheet piles to the specified design depth along the 60 linear foot alignment. o Install corresponding tieback systems, deadmen, wales, and a robust poured-in-place concrete or composite seawall cap to lock the system together. 5. Site Restoration, Final Clean Up, and Demobilization • Description: Restoring the work area to its original or improved condition, removing equipment, and completing final project closeout. • Key Tasks: o Backfill remaining voids, grade disturbed earth, and restore ground surfaces (e.g., sodding, gravel replacement, or concrete flatwork repair). o Remove all construction equipment, remaining materials, temporary facilities, and structural debris from the site. o Conduct a thorough final clean-up of the work area, including sweeping access paths and removing temporary turbidity curtains once water conditions stabilize. All work shall be constructed according to the Construction Plans and Specifications and are made part of the contract by reference as Exhibit A.
The Contractor shall construct the project per: • The jurisdiction for the project site is the City of Cocoa, Florida. All work shall be permitted and undertaken in accordance with applicable codes and ordinances. • Prime contractor is assumed to be familiar with all general condition’s/contract requirements associated with the contract between owner and contractor as they apply to the work noted on the detailed construction plans and specifications, attached herein as Exhibit A.[DK2.1][JF2.2][BD2.3][DK2.4] Prime contractor shall transfer all such requirements to all subcontractors. • All contractors shall examine job site prior to submission of a bid to observe all visible existing conditions. submission of bid will be taken to confirm familiarity with conditions of the work, so the bid price includes all work necessary to provide a completed, ready-to-occupied project. • Contractor shall obtain all permits required to undertake the work unless noted otherwise. • Prior to receiving a notice-to-proceed, the owner will file a notice-of-commencement with appropriate authority. • The contractor shall deliver a work schedule immediately after receiving a notice of award showing all tasks and completion dates. • The contractor will be responsible for providing all labor, materials, and equipment necessary to perform the work.
Similar Contracts
Same NAICS industry code
Earlier notices in this NAICS code
Posted before this notice, open and closed
Get AI-powered intelligence on this solicitation and the ones like it
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
