This Solicitation opportunity from Florida was posted on October 9, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Lift Station # 9 Rehabilitation Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The City of Hallandale Beach is soliciting bids from qualified firms to undertake a comprehensive lift station rehabilitation project, with an estimated budget of approximately $3.3 million. The scope of work encompasses site preparation, civil, mechanical, structural, and electrical renovations at Lift Station #9, including the removal and replacement of existing pumps, piping, valves, electrical components, and the installation of new equipment such as a meter vault, flow meter, and a new diesel generator. The project also involves infrastructure upgrades like driveway and fence construction, utility coordination, dewatering, bypass pumping, and ensuring continuous sanitary service during construction. Additionally, a new telemetry system will be installed to enhance emergency response and system monitoring capabilities, leveraging modern technology for early detection of storm risks or failures. Funding for this project is supported by a combination of federal and local resources, notably a $14.88 million grant from the Community Development Block Grant-Mitigation program, aimed at retrofitting multiple lift stations and pipelines to improve resilience and service reliability. The project specifically targets low to moderate-income communities, with a median household income of around $32,718 and a significant portion of residents earning less than $25,000 annually. The City is also contributing approximately $2.07 million, bringing the total project cost to nearly $17 million. The contract, identified as "Lift Station #9 Rehabilitation Project," is open for responses until December 1, 2025, with a project size estimated between $3 million and $3.6 million, and it is managed under NAICS code 925120.
General Info
Place of Performance
FL, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Full Description
The work to be performed includes site, civil, mechanical, structural and electrical work associated with the Lift Station # 9 Rehabilitation Project in the City of Hallandale Beach.
This project consists of the removal of two existing sanitary sewer pumps, associated piping, valves, fittings, supports, and electrical items including the existing diesel generator from the existing lift station, removal and replacement of the existing wet well top and valve vault, installation of a new meter vault, flow meter and three new submersible wastewater pumps along with the associated piping, valves, fittings, supports, electrical items including a variable frequency drive, reconnecting the new piping to the force main, installation of a new diesel generator, drum scrubber, driveway, fence, all as shown on the Drawings. The construction activities include but are not limited to survey, locating and protecting existing utilities, coordination with the City, existing utility owners, and jurisdictional agencies, coordinating the replacement of the FPL transformers, maintenance of traffic, dewatering if required, bypass pumping, maintaining continuous sanitary service and property access, preparation and submittal of shop drawings and record drawings, testing, and other restorations.
The City of Hallandale Beach has been awarded Fourteen Million Eight Hundred Seventy-Nine Thousand Two Hundred Nineteen Dollars and Zero Cents ($14,879,219.00) in CDBG-MIT (Community Development Block Grant-Mitigation) and Federal Register Notice (84 FR 45838, 8/30/2019) funding for the retrofitting of four lift stations and two force main pipelines. A new telemetry system will also be installed to improve emergency response capabilities by enabling City staff to monitor and control the retrofitted system remotely. This modernization allows for early detection and mitigation of storm risks or system failures. This project will satisfy the Low to Moderate Income (LMI) National Objective; there are 11,484 housing units within the project area, and the median household income is estimated to be $32,718, with approximately 38% earning less than $25,000 annually. The City of Hallandale is leveraging $2,072,752.00 for this project for a total project cost of $16,951,971.00.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS