Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on July 10, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

LIFT STATION REDESIGN B20128

Closed
FA857126Q0079Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
SLED
2025 CDBG- No. 25p-y-095-1-6798
Solicitation # 25P-Y-095-1-6798
Solicitation 25P-Y-095-1-6798 is a request for sealed bids from the McIntosh County Board of Commissioners for water system improvements in Georgia. The scope of work includes the construction of approximately 8,956 linear feet of 6-inch C900 Class 150 PVC water main, the installation of seven 6-inch mechanical joint ductile iron gate valves, twelve 3-way fire hydrant assemblies, and two connections to existing water mains. Additionally, the project requires the installation of a new 5,000-gallon hydropneumatic tank, 40 square yards of Class A pavement removal and replacement, and all necessary erosion control and appurtenances. All work must be completed within 60 consecutive calendar days from the date of the notice to proceed. This is a Section 3 Covered Contract under the HUD Act of 1968, and bidders must provide Section 3 documentation prior to the notice of award. The project also mandates compliance with the Build America, Buy America (BABA) Act. Bids must be submitted on the provided proposal forms and accompanied by a bidder's bond for 10 percent of the bid amount. Successful bidders will be required to furnish payment and performance bonds along with insurance certificates. The deadline for submission is 1:00 PM local time on December 1, 2026, at the McIntosh County Commissioners Office in Darien, Georgia.
Mcintosh County Board of Commissioners

POSTED

about 2 hours ago

DEADLINE

in about 1 month
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the existing Morgans Branch Pumping Station in North Carolina. The scope of work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Additional deliverables include the installation of new gravity sewers, manholes, and a fully operational pumping station equipped with mechanical and electrical systems, a generator, and odor control equipment. The project has an estimated value of 16,690,000 dollars. This solicitation is set aside for Small Businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone Small Businesses. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation criteria focusing on qualifications, financial ability, and strict adherence to bidding documents, including the submission of MWBE Good Faith Efforts and Table A. The agreement is based on EJCDC standard forms, requiring performance and payment bonds, as well as proof of insurance. Bids are due by November 10, 2026, with a final bid opening date of November 12, 2026. Contract administration involves monthly progress payments due 30 days after presentation to the owner, subject to review by the Engineer and the Resident Project Representative. The contractor must adhere to rigorous technical standards, including AWS D1.2 for welding and NEMA standards for motors. Materials must be delivered in original manufacturer packaging with specific labeling and storage requirements, such as maintaining a minimum ambient temperature of 45 degrees Fahrenheit for coatings. The project commences upon the issuance of a Notice to Proceed, which typically occurs within 30 to 60 days of the bid opening or effective date.
Don Moorhead Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 12 days

AI Contract Overview

Show more

The Contractor is tasked with designing, supplying, and installing a redesigned lift station system for the Commodities Maintenance Group at Robins Air Force Base in Georgia, specifically for the safe transportation of hazardous liquid chemical waste such as acid and chrome waste. Each lift station must include two electric pumps constructed of CPVC or 316 Stainless Steel, with CPVC fittings no larger than two inches nominal size, capable of delivering 25 gallons per minute per pump under a 30-foot total dynamic head. The system must feature a polypropylene tank with a 50- to 75-gallon capacity in a single-tank containment configuration, and the entire unit must fit within dimensions of four feet long, three feet wide, and four feet high. The control panel enclosure must be stainless steel, powered by either 120V or 208V, and each pump must be equipped with disconnect switches, hands-off-auto controls, and automated level sensors to enable fully automated on/off operation. The Contractor is responsible for providing all tools, parts, materials, equipment, labor, transportation, startup, and training required for full system deployment and operation. The contract, identified as LIFT STATION REDESIGN B20128 under solicitation number FA857126Q0079, is a total small business set-aside under FAR 19.5 and falls under NAICS code 237110 for sewer and wastewater systems construction. Performance will occur at Warner Robins, Georgia, with a response deadline of July 17, 2026. The Contractor must deliver commercial drawings, status reports on EMS and EnMS training, a safety plan, and incident reporting documentation, as outlined in six CDRLs and WR-ALC Appendix C. No pricing, delivery schedule, inspection criteria, or contract value details are available in the provided documentation. The primary point of contact is Phillip Braswell, with Andrew Harth as secondary, and all communications must be directed through the Department of Defense office at Robins AFB. While the scope emphasizes full turnkey delivery and compliance with technical specifications, critical elements such as performance period, payment terms, acceptance standards, insurance, bonding, and safety compliance are not detailed in the available information.

General Info

Redesign and deliver lift stations at Robins AFB with pumps, tanks, controls, training, and startup.

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

Warner Robins, GA, 31098, USA

Set-Aside

SBA

Documents

8

BAF 78451 Lift Station Redesign B20128 Appendix C Industrial Safety and Health Requirements

PDF, High priority: read this firstsafety-and-health-requirements
High

CDRL A002 Status Report EMS Training

PDF, High priority: read this firstcdrl
High

CDRL A003 Status Report - Energy Management System Training

PDF, High priority: read this firstcdrl
High

CDRL A004 Contractor's Safety Plan for Lift Station Redesign

PDF, High priority: read this firstcdrl
High

CDRL A005 Accident/Incident Report for Lift Station Redesign

PDF, High priority: read this firstcdrl
High

CDRL Amendment A001 - Commercial Drawings

PDF, High priority: read this firstcdrl
High

Purchase Description for Lift Station Redesign B20128

PDF, High priority: read this firstpurchase-description
High

Solicitation FA857126Q0079 Lift Pump Station Redesign

PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Combined Synopsis

Deadline changed

Response deadline changed from Jun 22, 2026 to Jul 17, 2026.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA8571 Maintenance Contracting Afsc Pzim
Contacts2 people available
OfficeROBINS AFB, GA, 31098-1672, USA
Office AddressROBINS AFB, GA, 31098-1672, USA
Contacts
Phillip Braswell

Full Description

Show more

The Contractor shall provide all the tools, parts, materials, equipment, labor, transportation, startup, and training for a redesigned lift station to the Commodities Maintenance Group (CMXG) at Robins Air Force Base (AFB), Georgia. These lift stations will be used to transport liquid chemical waste that could present environmental danger (i.e. acid waste, chrome waste).


Each Lift Station shall have the following features:
• Two (2) electric pumps made of CPVC or 316 Stainless Steel. Pump fittings must be CPVC with a two (2) inch maximum nominal size. The pump flowrate should be 25 gallons per minute per pump. The pump must have a 30-foot total dynamic head.
• The tank material shall be polypropylene, with a volume of 50 to 75 gallons and a single tank containment style.
• The dimensions of the lift station shall be four (4) feet long, three (3) feet wide, and four (4) feet high.
• The control panel enclosure shall be made of stainless steel.
• The power supply shall be 120V or 208V.
• Each pump shall have disconnect switches, hands-off-auto, and level sensors for automation on/off pump operation.

More opportunities from Department Of Defense → FA8571 Maintenance Contracting Afsc Pzim

Same awarding agency

NAICS: 334511
New
Federal
FARO Focus Core 100M Scanner
Solicitation # FA857127Q0015
Under solicitation FA857127Q0015, the Department of Defense is seeking a contractor to provide a FARO Focus Core 100M Scanner, including all necessary software, accessories, and training, for the 402d Maintenance Group (MXSG) at Robins Air Force Base, Georgia. This firm-fixed-price contract aims to improve the speed, quality, and accuracy of engineering designs and enable the creation of as-built facility layouts. The contractor is responsible for the delivery and setup of the equipment, with a required delivery timeline of 90 calendar days after the date of award. Performance and training will take place at the Warner Robins Air Logistic Complex, specifically within building 321. Key deliverables associated with the procurement include a COTS manual, EMS training, status reports, and a contractor safety plan. The contract mandates strict adherence to cybersecurity standards, including the Cybersecurity Maturity Model Certification (CMMC) and the safeguarding of covered defense information. Payment and invoicing must be processed electronically through the Wide Area Workflow (WAWF) module of the Procurement Integrated Enterprise Environment (PIEE). Additionally, contractors must comply with base access security protocols, including criminal background checks and the submission of valid identification and vehicle documentation to the Contract Surveillance Management Office.
Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing

POSTED

6 days ago

DEADLINE

in 1 day
View Details
NAICS: 562111
Federal
Site Visit - Removal of Old Fluid Cell
Solicitation # 82247
The Maintenance Support Group at Robins Air Force Base, Georgia, requires a contractor to provide all labor, equipment, materials, and transportation to decommission, remove, and dispose of one Quintus ABB QFC 1.6 x 4-1400 fluid cell press located in building 140. The scope of work includes dismantling and rigging heavy components, such as a 148,000 lb unwound main cylinder and an 86,000 lb lower filler piece, relocating them to a designated on-base cutting site, reducing the materials to recyclable sizes, and hauling all scrap and debris off-base. The contractor is also responsible for restoring the work area and any cutting sites to their original pre-project conditions, ensuring they are free of industrial waste and grease. A critical requirement is the submission of a Draft Technical Removal Plan within 14 calendar days of the award, which must be formally approved by the Contracting Officer before any physical work begins. Operational constraints include a strict floor loading limit of 350 PSI on concrete floors and the requirement to secure daily DAF Form 592 hot work permits for any on-base cutting activities. Additionally, the contractor must maintain operational fire extinguishers at all cutting sites. This sources-sought opportunity, solicitation number 82247, includes a site visit scheduled for December 14, 2026, requiring visitors to provide identification and vehicle documentation at the Robins AFB Visitor's Center.
Solid Waste Collection

POSTED

8 days ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS