Site Visit - Removal of Old Fluid Cell
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Maintenance Support Group at Robins Air Force Base, Georgia, requires a contractor to provide all labor, equipment, materials, and transportation to decommission, remove, and dispose of one Quintus ABB QFC 1.6 x 4-1400 fluid cell press located in building 140. The scope of work includes dismantling and rigging heavy components, such as a 148,000 lb unwound main cylinder and an 86,000 lb lower filler piece, relocating them to a designated on-base cutting site, reducing the materials to recyclable sizes, and hauling all scrap and debris off-base. The contractor is also responsible for restoring the work area and any cutting sites to their original pre-project conditions, ensuring they are free of industrial waste and grease. A critical requirement is the submission of a Draft Technical Removal Plan within 14 calendar days of the award, which must be formally approved by the Contracting Officer before any physical work begins. Operational constraints include a strict floor loading limit of 350 PSI on concrete floors and the requirement to secure daily DAF Form 592 hot work permits for any on-base cutting activities. Additionally, the contractor must maintain operational fire extinguishers at all cutting sites. This sources-sought opportunity, solicitation number 82247, includes a site visit scheduled for December 14, 2026, requiring visitors to provide identification and vehicle documentation at the Robins AFB Visitor's Center.
General Info
Place of Performance
Warner Robins, GA, 31098, USASet-Aside
Timeline
Response Deadline
Organization & Contact Information
Full Description
The Contractor shall provide to the Maintenance Support Group (MXSG) all the tools, parts, materials, equipment, labor, and transportation necessary to decommission, remove, and dispose of one (1) Quintus ABB QFC 1.6 x 4-1400 fluid cell press. The equipment is located in building 140 at Robins Air Force Base (AFB), Georgia. Decommissioning services shall include dismantling, rigging, relocating the components to a designated on-base cutting site, reduction of major components to recyclable sizes, and hauling all resulting scrap and debris off Robins AFB.
Upper Filler Piece: 64,000 lbs; Pressure Plate: 32,000 lbs; Lower Filler Piece: 86,000 lbs; Unwound Main Cylinder: 148,000 lbs; Plating attached to Lower Filler: 7,000 lbs (see Performance Work Statement for full details)
Similar Contracts
Same NAICS industry code
More opportunities from Department Of Defense → FA8571 Maintenance Contracting Afsc Pzim
Same awarding agency
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
