Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

Lighting Control Systems Equipment Supply

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Lighting Control Systems Equipment Supply involves providing specialized lighting control hardware and software for prime contractors working on Department of Energy projects at the Idaho National Laboratory. The scope of work includes the delivery of controllers, sensors, switches, and control software licenses specifically designed to improve functionality and reduce energy consumption. All materials must be delivered to the TAN-675 facility in Idaho Falls, Idaho, in accordance with DOE/INL technical specifications. The contract is managed by the Battelle Energy Alliance for the Department of Energy under NAICS code 335122. It was posted on March 24, 2026, with a response deadline of January 30, 2027. The primary objective is the delivery of completed hardware and software packages that meet the rigorous technical requirements of the facility.

General Info

Supply lighting control hardware and software for DOE projects at Idaho National Laboratory.

NAICS

335122 - Commercial, Industrial, and Institutional Electric Lighting Fixture Manufacturing

Place of Performance

Idaho Falls, ID, 83415, USA

Set-Aside

NONE

Documents

This scope was carved out of INL-26-036.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

TAN 675 Lighting Controls Upgrade

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Energy → Battelle Energy Alliance–doe Cntr
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies specialized lighting control hardware and software for prime contractors on Department of Energy (DOE) projects at the Idaho National Laboratory. Provides controllers, sensors, switches, and control software licenses designed to reduce energy consumption and enhance functionality. Delivers materials to the TAN-675 facility per DOE/INL technical specifications. Delivers completed hardware and software packages.

Similar Contracts

Same NAICS industry code

More opportunities from Department Of Energy → Battelle Energy Alliance–doe Cntr

Same awarding agency

NAICS: 335910
New
Federal
Long-Duration Energy Storage (LDES) Battery System
Solicitation # INL-26-050
Idaho National Laboratory and Argonne National Laboratory are seeking non-lithium, rechargeable electrochemical long-duration energy storage battery systems for benchmark performance testing. This Expression of Interest serves as a preliminary step to identify qualified vendors for a future Request for Proposal process. The required systems must be capable of at least 10 hours of continuous discharge at rated power and must export both AC and DC power. Specifically, the laboratories are seeking two module-scale systems with at least 10 kW continuous power and 100 kWh usable energy, and one full-scale system with at least 100 kW continuous power and 1,000 kWh usable energy. Systems must have a minimum field lifetime of 15 years and operate between 0 to 50 degrees Celsius without significant performance loss. Technical requirements include compliance with NFPA 855, UL 9540/9540A, and NEC/IEEE standards, as well as support for SCADA protocols such as Modbus TCP/IP, DNP3, or IEC 61850. Deliverables include 70 percent, 90 percent, and final design packages, along with Factory and Site Acceptance Testing reports. Modules are to be delivered to INL within approximately 3 months of final design acceptance, while the full-scale system is to be delivered to ANL within approximately 6 months. Interested vendors must submit a consolidated document by September 24, 2026, including technology descriptions, safety certifications, hazard assessments, indicative pricing, and a detailed project schedule. All data acquired from the testing will be available for publication.
Battery Manufacturing

POSTED

6 days ago

DEADLINE

in about 3 hours
View Details
NAICS: 541715
New
Federal
Alternative Fuels & Feedstock Initiative to Add Value to Seed Oil Crops through Improved Preprocessing, Scalability, and Valorization of Product Streams
Solicitation # INL-26-052
Battelle Energy Alliance, LLC, acting as the Management and Operating Contractor for the Department of Energy owned Idaho National Laboratory, is seeking Expressions of Interest for research to enhance the value of seed oil crops. Funded by the Alternative Fuels and Feedstock Office, this initiative focuses on improving post-harvest preprocessing, storage, separations, and scalable fractionation to reduce costs and increase yields. The scope specifically targets the valorization of non-oil components and requires that any bench-scale research demonstrate clear scalability to field applications. Research involving agronomy, genetic engineering, or new conversion technologies is explicitly excluded. Qualified industry partners or U.S. universities are encouraged to apply, with a preference for teams possessing strong technical credentials, impactful publications, and established ties to agricultural or energy sectors. Selected awardees will collaborate with the Biomass Feedstock National User Facility to generate data for an INL-led technoeconomic assessment. The anticipated project duration is between 12 and 24 months. This EOI serves as a preliminary screening process to identify qualified vendors who may be invited to submit a formal Request for Proposal. Submissions must be received by October 23, 2026, and include core team qualifications and a brief research statement.
Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)

POSTED

7 days ago

DEADLINE

in 23 days
View Details
NAICS: 332420
Federal
CFA-686 Carbon-based Fuels Capability - CO2 Storage Vessel
Solicitation # INL-26-056
Battelle Energy Alliance, LLC, acting as the Management and Operating Contractor for the Department of Energy's Idaho National Laboratory, is seeking Expressions of Interest for the design, fabrication, testing, and inspection of the V-738 pressure vessel. This vessel is a 200 cubic foot, ASME BPVC Section VIII, Division 1 code U-stamped unit intended for gaseous CO2 service within the Central Facilities Area Carbon-based Fuels Capability. The horizontal vessel will be constructed from 304/304L stainless steel with a design pressure of 1,800 psig and a temperature range of -40 to 500 degrees Fahrenheit. It features a 36-inch inner diameter, seven nozzles, nine band heating elements, and Foamglas insulation with aluminum sheathing. The unit must be designed for static, seismic, and wind loading per IBC 2024, ASCE 7-10, and ACI 318-19 to withstand the high desert environment of Idaho. The procurement process begins with this Expression of Interest to identify qualified vendors, with selected firms invited to a subsequent Request for Proposal for a firm-fixed price contract. Qualified offerors must possess a current U-stamp certificate, demonstrate expertise in stainless steel welding with 100 percent radiography, and provide a comprehensive quality control system meeting ASME BPVC Section VIII Division 1 Mandatory Appendices 10 and 47. The total project duration is 28 weeks after receipt of order, encompassing design, fabrication, and delivery to the Idaho National Laboratory. Interested firms must submit a qualification package of no more than five pages to Chase Egbert by October 16, 2026, detailing their technical capabilities, inspection plans, and availability of experienced project and quality control management.
Metal Tank (Heavy Gauge) Manufacturing

POSTED

8 days ago

DEADLINE

in 16 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS