Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on February 24, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Liquid Oxygen for Florida Bass Conservation Center/ Richloam State Fish Hatchery

Closed
FWC 25/26-52State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 325120
New
SLED
Bulk Carbon Dioxide (CO2) Equipment, Supply and Delivery for Commercial Swimming pools
Solicitation # 2025-GEN-154
Solicitation 2025-GEN-154 is a Request for Proposal issued by the City of Cleveland Department of Parks and Recreation to secure a qualified vendor for the supply and delivery of bulk carbon dioxide gas and the provision of associated storage equipment for commercial swimming pool pH regulation. The selected vendor must provide a continuous supply of CO2 with a purity level of at least 99.5% and maintain NSF/ANSI Standard 60 certification for water treatment. The scope of work includes the installation and maintenance of insulated cryogenic storage vessels equipped with wireless telemetry for automated inventory tracking, as well as the installation of code-compliant safety relief valves, leak detection monitors, and outdoor venting lines. The contract requires the vendor to provide 24/7 emergency repair services for equipment failures or gas leaks with a maximum on-site response time of four hours. Proposals are due by December 2, 2026, and must be submitted in two parts: a technical response and a separate cost proposal. Evaluation will be based on the total cost of ownership (60%), reliability and logistics including proximity of supply hubs (20%), and vendor qualifications such as experience and safety records (20%). Key points of contact for this effort are James Clark, Deputy Commissioner of Aquatics, and Alexandria Nichols, Parks and Recreation Director.
Parks and Recreation

POSTED

3 days ago

DEADLINE

in about 1 month
NAICS: 325120
New
SLED
Bulk Medical Gas
Solicitation # 2140202
Roswell Park Comprehensive Cancer Center is soliciting Statements of Qualifications through RFQ 2140202 to identify qualified suppliers for the supply and delivery of bulk medical and research gases in Buffalo, New York. The scope of work includes the furnishing, installation, maintenance, and monitoring of bulk storage systems for liquid nitrogen and liquid oxygen. Specifically, the center requires support for two 6,000-gallon and one 4,500-gallon liquid nitrogen tank, as well as one 6,000-gallon and one 1,500-gallon liquid oxygen tank. The successful supplier must ensure all equipment is commissioned and fully operational by May 20, 2027, with a primary focus on a seamless transition that avoids interrupting patient care or research operations. The resulting agreement is intended for an initial term of five years, with an option to renew for an additional five years, though a ten-year initial term may be considered if beneficial. Evaluation factors include relevant healthcare and research sector experience, financial stability, supply chain reliability, and the quality of the proposed transition plan. Respondents must submit their qualifications, including budgetary pricing and evidence of regulatory compliance, by November 16, 2026. Awarded vendors must adhere to strict New York State requirements, including EEO policies, non-collusive bidding certifications, and prevailing wage laws, while maintaining comprehensive records for seven years.
Roswell Park Cancer Institute Corporation

POSTED

4 days ago

DEADLINE

in 21 days
NAICS: 325120
New
Federal
Notice of Intent to Sole Source: Commercial Industrial and Liquid Gases and Cylinder Maintenance
Solicitation # W51AA1-27-N-0001
The Department of Defense, through the Army Contracting Command-Aberdeen Proving Ground Tobyhanna Division, has issued a notice of intent to award a sole-source purchase order for the supply and delivery of twelve commercial industrial and liquid gas products. These materials, which include liquid argon, nitrogen, oxygen, and specialized shielding-gas mixtures, are critical for depot manufacturing, electronics testing, and radar overhaul operations at the Tobyhanna Army Depot in Pennsylvania. The government intends to award the contract to Haun Welding Supply, Inc. under FAR Part 12, citing them as the only known source capable of meeting the immediate requirement without causing an unacceptable interruption to critical support. The scope of work includes the provision of all labor, equipment, and materials for gas delivery, as well as the periodic inspection, testing, maintenance, and repair of five government-owned, non-serialized, low-pressure cylinders. A key requirement is the maintenance of a 24-hour emergency response capability to ensure uninterrupted operations. While the government intends to proceed with a sole-source award, it will consider capability statements from other responsible sources. Interested parties must demonstrate their ability to meet delivery schedules, support existing infrastructure, and comply with all safety and installation-access requirements. Capability statements, including company identification and technical experience, must be submitted via email to Justin Marino by November 6, 2026.
W6QK Acc-Apg Cont Ct Tyad Ofc

POSTED

4 days ago

DEADLINE

in 11 days
NAICS: 325120
New
SLED
Liquid Oxygen Equipment Prepurchase
Solicitation # 2026-RFB-049
The Las Virgenes-Triunfo Joint Powers Authority is soliciting bids under solicitation 2026-RFB-049 for the procurement and delivery of a Liquid Oxygen (LOX) storage and vaporization system. The scope of work includes the supply of a storage tank, ambient air vaporizers, a remote fill station, and all necessary connecting piping, valves, sensors, and controls. This equipment is intended for the Westlake Filtration Plant in Westlake Village, California, and will be installed by others under a separate contract. The award will be granted to the lowest responsible responsive bidder based on the total estimated cost. Bids must be submitted exclusively through the procurement portal by December 2, 2026. Key performance milestones include coordinating design requirements within 30 days of the Notice to Proceed, delivering the system to the project site by November 1, 2027, and achieving substantial project completion by December 31, 2027. The contract requires the submission of bid, performance, and payment bonds, as well as general liability insurance. Additionally, the seller must provide seismic certification, a manufacturer's certificate of proper installation, and a minimum of two person-days of on-site installation assistance. The contract is subject to various regulatory and legal requirements, including the Davis-Bacon Act, the State Fair Employment and Housing Act, and federal non-discrimination mandates such as Executive Order 11246 and the Civil Rights Act of 1964. Furthermore, the seller must certify that all iron and steel products are produced in the United States. Goods are delivered FOB Destination, and the District may withhold 10 percent of the price until the equipment is installed, tested, and operating. All packages must be marked with specific details, including the purchase order number, bill of lading, and equipment weight.
Engineering & Facilities

POSTED

5 days ago

DEADLINE

in about 1 month

General Info

Documents

1

FWC ITB 25.26-52 Liquid Oxygen for Florida Bass Conservation Center

PDF, High priority: read this first60 pages · itb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida Fish and Wildlife Conservation Commission
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
The Florida Fish and Wildlife Conservation Commission is seeking competitive pricing for Liquid Oxygen for Florida Bass Conservation Center/ Richloam State Fish Hatchery, in accordance with the specifications contained herein.A vendor submitting a bid should be registered in the MyFloridaMarketPlace (MFMP) system and with SunBiz prior to the bid opening.For a copy of this bid, click on the link at the bottom of the advertisement page on the Florida Vendor Information Portal (VIP) website to download.

More opportunities from Florida Fish and Wildlife Conservation Commission

Same awarding agency

NAICS: 236115
New
SLED
Spirit of The Wild Modular Home
Solicitation # FWC 26/27-13C
The Florida Fish and Wildlife Conservation Commission is soliciting competitive bids for the Spirit of the Wild Modular Home project located at 1232 CR 832 Felda in Hendry County, Florida. With an estimated budget of 700,000 dollars, the scope of work includes the construction of a new modular home, grading, a pervious gravel road, a new fence, an above ground septic system, and one potable water well, along with the connection of all utilities. The project requires the contractor to provide all necessary materials, equipment, and labor in accordance with plans prepared by CPH Consulting, LLC and Chapter 255 of the Florida Statutes. The performance schedule is divided into several phases, including 70 calendar days for modular building plan approval, 10 days for permit application, and 30 days for permit approval. Once the notice to proceed with construction is issued, substantial completion must be achieved within 100 calendar days, with final completion following 15 days later. Site work may begin up to 45 days before the modular building is delivered. Payment is processed monthly via the Owner's Certificate of Partial Payment, subject to a 5 percent retainage. Bidders must be registered in the MyFloridaMarketPlace system and with SunBiz. Submissions must be delivered in a sealed envelope to the commission office in Tallahassee, as digital submissions are not accepted. Required documentation includes a bid form, subcontractor list, experience questionnaire, and a bid bond of at least 5 percent for bids exceeding 100,000 dollars. Additionally, bidders quoting 200,000 dollars or more must agree to maintain an office or project within 300 road miles of the site. The contract incorporates various federal compliance requirements, including the Build America, Buy America provision and the Copeland Anti-Kickback Act.
New Single-Family Housing Construction (except For-Sale Builders)

POSTED

about 3 hours ago

DEADLINE

in 3 days
View Details
NAICS: 441222
SLED
New Carolina Skiff E21 DLX CC with New Motor and New Trailer
Solicitation # FWC 26/27-18
The Florida Fish and Wildlife Conservation Commission is soliciting competitive bids for one new, turnkey-ready 2026 or newer Carolina Skiff E21 DLX CC vessel. The package must include a new 2026 or newer Suzuki DF140BTXW outboard engine and a new aluminum tandem-axle I-beam trailer. The vessel must be professionally rigged and tested for immediate field deployment, featuring marine-grade stainless steel hardware, marine tinned copper wiring, and specific labeling for the bilge, navigation, anchor, lights, and accessory systems. The preferred completion date for this project is April 1, 2027, with a final required completion deadline of June 1, 2027. The contract will be awarded to the responsive and responsible bidder offering the lowest price. To be considered, vendors must be registered in the MyFloridaMarketPlace and SunBiz systems and submit sealed physical bids by October 23, 2026, at 2:30 PM ET; digital submissions are strictly prohibited. Required documentation includes a Bidder Acknowledgment form, a list of subcontractors, and certifications regarding forced labor and scrutinized company status. The agreement is governed by the Commission's Purchase Order Terms and Conditions, which include a 10 percent payment reduction for failed deliverables and a 15-calendar day notice period for termination for convenience. Compliance with the Build America, Buy America provision and the Americans with Disabilities Act is mandatory.
Boat Dealers

POSTED

20 days ago

DEADLINE

in 3 days
View Details
NAICS: 237990
SLED
Apalachicola Bay Oyster Restoration
Solicitation # FWC 26/27-31
The Florida Fish and Wildlife Conservation Commission is soliciting competitive bids for the Apalachicola Bay Oyster Restoration project in Franklin County, Florida. The contractor will be responsible for the acquisition, delivery, staging, and barge deployment of restoration materials, such as uniform concrete, mixed layer concrete, or crushed lime rock, to restore degraded oyster reef habitats. The scope of work includes providing staging areas, utilizing flat deck barges for delivery to designated sites, and deploying materials using water cannons, excavators, or bulldozers. Additionally, the contractor must disperse existing restoration material from 2024 projects to reduce the height of specific sites. All work must be completed by September 1, 2027. The contract has an estimated budget of 3,500,000 dollars and will be awarded to the responsive and responsible bidder offering the lowest total price. Bidders must be registered in the MyFloridaMarketPlace and SunBiz systems and must submit sealed bids by November 6, 2026. Required documentation includes a price sheet, experience and reference forms, and certifications regarding forced labor and the boycott of Israel. The awarded vendor must provide a performance bond and insurance documentation before initiating work. Compliance with the Build America, Buy America provision and U.S. Coast Guard safety requirements for vessels is mandatory. Payment will be issued upon written confirmation of delivery and acceptance by the Commission.
Other Heavy and Civil Engineering Construction

POSTED

25 days ago

DEADLINE

in 11 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS