This Sources Sought opportunity from Department Of Defense was posted on August 13, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Little Goose Dam and Lower Monumental Dam Intake Gate Hydraulic System Upgrades

Closed
W912EF25RSS39Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
CP25014
Solicitation # CP25014
Solicitation CP25014 is a unit price contract issued by the Port of Lake Charles (Lake Charles Harbor & Terminal District) for the Industrial Park East Rail Extension and Trans-loading Yard project located in Calcasieu Parish, Louisiana. The scope of work requires the contractor to provide all labor, materials, equipment, and supplies necessary to complete the project according to best industry practices and contract specifications. Key deliverables include mobilization, clearing and grubbing of 10 acres, drainage excavation, structural fill embankment, lime treatment of 37,000 square yards, and the installation of 602 linear feet of barbed wire fencing and double swinging driveway gates. The contract will be awarded to the lowest qualified bidder who complies with all requirements. Bidders must submit proposals by November 19, 2026, using the Louisiana Uniform Public Work Bid Form, ensuring every requested item has a unit price. The successful bidder must provide performance and payment bonds from an approved or A-rated Louisiana domiciled insurance company. Project administration includes a bi-monthly schedule update requirement and a retainage policy of 10 percent for contracts up to 500,000 dollars and 5 percent for those exceeding that amount. Compliance with the Clean Air Act, Federal Water Pollution Control Act, and Equal Opportunity clauses is required, with specific attention to FEMA assistance for subcontracts exceeding 150,000 dollars. Inspection and acceptance are managed by the Department, utilizing DOTD standards for earthwork and the International Roughness Index for concrete pavement.
Port of Lake Charles

POSTED

about 3 hours ago

DEADLINE

in 21 days

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Dayton, WA, USA

Set-Aside

NONE

Documents

1

Project Labor Agreement Survey

PDF, Low prioritysources-sought
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → US Army Engineer District Walla Wal
Contacts2 people available
OfficeWALLA WALLA, WA, 99362-1876, USA
Office AddressWALLA WALLA, WA, 99362-1876, USA

Full Description

Show more
Little Goose Dam and Lower Monumental Dam Intake Gate Hydraulic System Upgrades Sources Sought Notice: W912EF25RSS39 The US Army Corps of Engineers, Walla Walla District is seeking sources for a construction project entitled: Little Goose Dam and Lower Monumental Dam Intake Gate Hydraulic System Upgrades. The work is located at Little Goose Dam and the Lower Monumental Dam in the Walla Walla District. This will be a design-build firm-fixed-price construction contract. The North American Industry Classification System (NAICS) code for this project is 237990 Other Heavy and Civil Engineering Construction, and the associated small business size standard is $45.0M. The projected magnitude of construction for this project in accordance with FAR 36.204 and DFARS 236.204 is $25,000,000 to $100,000,000. This sources-sought announcement is a tool to identify businesses with the capability to accomplish the work. This is not a solicitation. Only those companies which respond to this announcement by submitting the following information will be used in determining whether to set aside this requirement. A list of current or past projects demonstrating technical experience with work of a similar nature to that listed in the Summary Scope of Work. For each project submitted, provide a brief narrative statement of the work involved, your company's role in the project, the dollar value and the completion date. Include a statement detailing any special qualifications and certifications, applicable to the scope of this project, held by your company and/or in-house personnel. A reference list for each of the projects submitted in 1) above. Include the name, title, phone number and email address for each reference. Provide a statement of your company's business size (HUBZone, Service-Disabled Veteran Owned, 8(a), small disadvantaged, or woman-owned) with regards to the NAICS code listed above. Provide a statement that your company intends to submit an offer on the project when it is advertised. Provide a statement of your company's bonding capacity. A statement from your surety is NOT required but is helpful. Cage Code and Unique Entity Identifier. Submit this information to Preston Jones, Contract Specialist, via email to contact@example.gov. Your response to this notice must be received on or before 3:00 PM on August 27, 2025. The Government would like industry feedback on the following questions: The Government is considering scheduling the on-site work windows for each dam either concurrently or consecutively. Consecutive work windows would likely span over 2 years. Does your company identify any advantages or disadvantages with either option? Does your company or potential sub-contractor have experience with hydraulic systems that use water-soluble polyalkylene glycol (PAG) hydraulic fluids? The Government has work at both Little Goose and Lower Monumental Dams. The Government is considering consolidating these requirements. (See FAR 2.101 for the definition of consolidation.) Should the Government consolidate the requirements to replace the intake gate hydraulic systems at Little Goose and Lower Monumental Dams? What impacts does your company anticipate consolidating having on small businesses ability to participate in the solicitation? What cost savings would your company anticipate realizing from consolidating? Given the projected magnitude of construction, the Government anticipates that the requirement for a Project Labor Agreement may apply to this project. Attached to this Sources Sought notice is a Project Labor Agreement Survey that we ask you to also complete and return. Summary of Scope of Work: Remove and dispose of existing cylinders, hydraulic power unit, piping, control stations, and other appurtenances. New hydraulic cylinders. Little Goose & Lower Monumental have only a partial set of cylinders. The cylinders that remain have been rehabilitated at least once and are in varying states of condition. Past experience with cylinder replacement at McNary indicates that performing a major rehabilitation of this type of cylinder approaches the cost of new. Additionally, new advances in superior cylinder rod coatings result in new cylinders being the preferred option. The system will be under pressure to keep the gates in the raised position. 19 new cylinders will be procured: 18 for normal operations plus one spare. New cylinder support beams. Each cylinder is supported in the slot by an H-shaped structural steel support. The project only has partial sets of beams currently (matching in quantity to the number of cylinders). To ensure compatibility with the new cylinders and to reset the life on the system, all new support beams will be procured. 19 new support beams will be procured, to match the number of new cylinders. New hydraulic power unit. The plant has a hydraulic power unit (HPU) consisting of two raise pumps and one pressurization pump. New control stations. The control station will be replaced at each main unit. The primary reasons for replacing each control station are age of the equipment, compatibility with new hydraulic fluid, and to be able to integrate the emergency closure control scheme. Six new control stations, one for each main unit, will be procured. New hydraulic fluid. The hydraulic fluid will be replaced due to age, condition, and environmental concerns. The existing conventional fluid will be replaced with an environmentally acceptable lubricant (EAL). New piping. All piping and hoses will be replaced due to age and condition. Gate position indication. The gate position indication system will be rehabilitated to become functional once again. Additionally, modifications will be made to provide gate position indication to the control room. Control system changes. Remote controls to initiate an emergency closure will be installed in the control room. Additionally, the functionality of the emergency closure switches on the governor actuator cabinets will be restored. Hydraulic fluid tank. The hydraulic fluid tank will likely be retained and rehabilitated. Fire protection for the tank needs to be improved by either 1) relocating the tank, 2) adding a fire wall or 3) add a fire rated enclosure. The Contractor will be responsible for establishing and managing an effective on-site Safety and Health program in accordance with EM 385-1-1 that will require the development and submission of a comprehensive project specific Accident Prevention Plan for Government acceptance. In addition, the Contractor will be required to develop and submit for Government acceptance Activity Hazard Analyses for each phase of work and a project specific Fall Protection Plan that comply with EM 385-1-1. A Site Safety and Health Officer (SSHO) employed by the prime contractor shall be required for each shift of the contractor's on-site operations. The SSHO shall possess a minimum of 5-years of experience in construction safety on similar projects, shall have completed the 30-Hour OSHA Construction Safety training within the last 5-years, and shall have completed at least 24-hours of formal safety training each year for the past 5-years. A qualified Fall Protection Competent Person shall be provided by the Contractor for each shift of the contractor's on-site operations that involves work that exposes workers to fall hazards. This contract will require the Contractor to furnish mobile crane equipment, crane operators, and rigging equipment that comply with the certification and testing requirements of EM 385-1-1. The Contractor will be responsible for establishing and managing an effective Contractor Quality Control (CQC) System that will require the development and submission of a comprehensive project specific CQC Plan for Government acceptance. A CQC System Manager employed by the prime contractor shall be required to be on-site for each shift of the Contractor's operations. The CQC System Manager must possess a minimum of 5-years relevant experience in a supervisory or management position such as Quality Control Manager, Quality Assurance Manager, or Construction Manager directly involved in the management of construction quality at the project site. In addition, the CQC System Manager shall have completed the course entitled - Construction Quality Management for Contractors within the last 5-years. The Contractor will be required to use the Government-furnished Construction Contractor Module (referred to as QCS) of the Resident Management System (RMS) to record, maintain, and submit various information throughout the contract period. QCS is a Windows-based program that can be run on a stand-alone personal computer or on a network. The Government will make the QCS software available to the Contractor after contract award. The project will involve the development and management of Contractor furnished submittals for items such as pre-construction plans, product data, test reports, and contract close-out documentation as required by the technical specifications of the contract. Miscellaneous work within the project includes the delivery of As-Built Drawings to the customer.

More opportunities from Department Of Defense → US Army Engineer District Walla Wal

Same awarding agency

NAICS: 332812
New
Federal
Dworshak Skeleton Bay Draft Tube Bulkhead Rehabilitation
Solicitation # W912EF27QA0020001
The US Army Corps of Engineers, Walla Walla District, is soliciting offers for the rehabilitation of twelve draft tube bulkheads and associated seal keeper bars at the Dworshak Dam. This small business set-aside project requires the contractor to provide all personnel, materials, equipment, and transportation to move the bulkheads from Dworshak Dam to a repair facility and back. The scope of work includes existing coating removal, weld inspection and repair according to AWS D1./D1.M standards, and the application of new coatings in compliance with SSPC SP 5/NACE No. 1 and Section 09 97 02.00 28 for hydraulic structures. The government provides the bulkheads as government furnished property, with each unit having an estimated value of 850,000 dollars. The project is structured in three phases, with each phase involving two top and two bottom bulkheads. Performance is scheduled between November 23, 2026, and July 5, 2027, with specific pickup and return windows for each phase. Deliveries and retrievals must be coordinated 15 days in advance and occur Monday through Thursday. Key requirements include a one-year warranty on the coating system, the submission of general inspection reports within five business days of each inspection, and the provision of manufacturer safety data sheets and CERL Lab certification for all paint materials. The contractor must also ensure all paint is stored and packaged according to strict safety and stability guidelines to prevent degradation.
Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers

POSTED

2 days ago

DEADLINE

in 1 day
View Details
NAICS: 811310
Federal
LLA Fish Pump - Motor Rewind
Solicitation # W912EF27QA006
Solicitation W912EF27QA006 is a combined synopsis and request for quotation issued by the US Army Engineer District Walla Walla for motor rewind and asbestos abatement services at the Lower Granite Dam in Pomeroy, Washington. The scope of work involves the rewinding, refurbishing, and addition of eight resistance temperature detectors to three polyphase AC squirrel cage induction motors used for fish pumps. This includes one Hitachi dual winding motor and two Ideal Electric single-winding motors. To ensure operational continuity, the project will be executed by rewinding one motor per year, with a total performance period extending through December 2029. The contract is a firm-fixed-price acquisition and is not set aside for small business concerns, although evaluation preferences are provided for HUBZone small businesses. Key technical requirements include the use of a minimum class F motor insulation system and strict adherence to core loss and hot spot specifications. Deliverables include the refurbished motors, final operation and maintenance manuals, and on-site commissioning support. The government has established a seven-business-day window for the acceptance or rejection of services following delivery. Liquidated damages are specified for delays, with daily rates increasing annually from FY28 through FY30. Offerors must comply with various federal regulations, including the Buy American and Balance of Payments Program, E-Verify personnel screening, and DFARS cybersecurity reporting standards.
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

POSTED

7 days ago

DEADLINE

in 25 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS