This Solicitation opportunity from New Hampshire was posted on March 20, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The contract involves site improvements at two locations: Little Harbour Elementary School and the Portsmouth Early Education Program (PEEP) Playground Area in New Hampshire. At Little Harbour Elementary, the project includes regrading the play area to incorporate accessible features, installing a new playground, adding bike parking, and enhancing walkways. At the PEEP Playground Area, improvements focus on regrading to create a fully ADA-accessible play area and upgrading walkways. The work can commence once the notice to proceed is issued.
This solicitation, identified as 19-26-Bid, was posted on March 20, 2026, with a response deadline of April 8, 2026. It is managed by the School Department Facilities Maintenance under New Hampshire’s School Department, with contact points including the Director of Buildings & Grounds and the Procurement Coordinator. The contract aims to enhance accessibility and safety features in these educational play spaces, reflecting a commitment to inclusive and improved outdoor facilities.
General Info
Site improvements at two NH schools include accessible playgrounds, walkways, and bike parking upgrades.
HighAI Summary for 01 56 26 Temporary Chain Link Fence Specifications: This document, section 01 56 26, details the specifications for temporary chain link fencing required for securing a construction site. It includes general work requirements, submittal instructions, product descriptions for galvanized fencing materials, and execution guidelines for installation, maintenance, and removal. The fencing is to be 6-foot high, with posts spaced a maximum of 10 feet, and includes provisions for gates and secure attachment of fabric. The document emphasizes contractor responsibility for site security and proper installation according to manufacturer recommendations and contract drawings.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 01 56 39 Tree Protection and Trimming Specifications: This document is Section 01 56 39 titled 'Tree Protection and Trimming' and outlines the requirements for protecting and trimming trees affected by construction work. It includes general work scope, related sections, quality assurance standards referencing ANSI A300 and ISA Best Practices, materials specifications such as drainage fill and filter fabric, and detailed execution instructions. Key execution topics cover temporary protection, excavation near tree roots, regrading, pruning, tree repair and replacement, and disposal of waste materials. The document aims to ensure tree preservation during construction activities and compliance with horticultural and environmental standards.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 01 74 13 - Cleaning Up: This document is Section 01 74 13 titled 'Cleaning Up' and outlines the contractor's responsibilities for cleanup during and after construction work. It includes requirements for daily cleanup, removal of debris from drainage facilities, removal of temporary buildings and equipment, restoration of damaged property, and final cleanup before project acceptance. The document emphasizes safety, neatness, and compliance with the Engineer's instructions to maintain a safe and orderly worksite.
PDF
PDF, High priority: read this firstsow
HighAI Summary for 01 92 13 - Operation and Maintenance Manuals: This document is Section 01 92 13, titled Operation and Maintenance Manuals, outlining procedural requirements for compiling and submitting operation and maintenance data for contractor-installed materials, equipment, and systems. It excludes owner-installed playground equipment and bonded rubber surfacing. The manual must be prepared in commercial quality binders or electronically in searchable PDF format, containing detailed instructions, product data, drawings, warranties, and contact information. The document includes quality assurance, format, content requirements, and a review checklist to ensure completeness and accuracy. It serves as a specification section for the preparation and submission of operation and maintenance manuals as part of the project deliverables.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 03 21 00 Concrete Reinforcement Specification: This document is Section 03 21 00, Concrete Reinforcement, providing detailed specifications for furnishing and installing reinforcement for cast-in-place concrete. It references standards such as ACI 318, ASTM A615, and AWS 12.1, and outlines materials, submittals, and execution requirements including steel installation and concrete cover. The document ensures compliance with relevant codes and quality control for reinforcement in concrete structures, dated as per the original filename 03_21_00_-_Concrete_Reinforcement[1].pdf.
PDF
PDF, High priority: read this firstbid-document
HighAI Summary for 20260224 LHS & PEEP Playground Improvements Bid Document Drawing Set: This document is the bid document drawing set for the Little Harbour Elementary School and Portsmouth Early Education Program (PEEP) Playground Improvements project located at 50 Clough Drive, Portsmouth, NH. Prepared for the City of Portsmouth and dated February 24, 2026, it includes general notes, site plans, demolition plans, materials plans, layout plans, grading plans, planting plans, and detailed drawings. The document also outlines four add alternates for additional playground features such as fencing, rubber safety surfacing, an entry archway, and environmental interpretive signage. The bid document is prepared by Weston & Sampson Engineers, Inc. and includes contact information and sheet indexing for reference.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 32 91 13 - Bioretention Soil Specifications: This document, section 32 91 13, details the specifications for Bioretention Soil Mix (BSM) used in bioretention basins, rain gardens, and stormwater treatment practices in New Hampshire. It includes requirements for furnishing, testing, delivery, placement, and protection of BSM. The document references ASTM standards and New Hampshire environmental regulations. It specifies soil texture, organic content, chemical properties, and infiltration performance criteria. The document also outlines submittal requirements, project conditions, and detailed installation and handling procedures to ensure proper soil preparation and application. The version date is not explicitly stated but the content is current and comprehensive for construction and environmental compliance purposes.
PDF
PDF, High priority: read this firstinstructions-to-bidders
HighAI Summary for City of Portsmouth EPDM Roofing System Bidder Instructions: This document provides detailed instructions to bidders for the City of Portsmouth project involving the removal and installation of a complete EPDM membrane roofing system at Portsmouth High School. It includes electronic submission procedures via OpenGov Procurement, scope of work, special notices, bid schedule interpretation, examination requirements, proposal preparation, nonconforming proposal criteria, proposal guaranty requirements, withdrawal and disqualification conditions, material guaranty, and award execution process. The document emphasizes compliance with laws, bid submission through the portal, and the owner's rights regarding bid acceptance and contract award. It serves as a critical guide for bidders to prepare and submit conforming bids for this roofing project.
PDF
PDF, High priority: read this firstinstructions-to-bidders
HighAI Summary for City of Portsmouth High School Roof EPDM Membrane Replacement - Instructions to Bidders: This document provides detailed instructions to bidders for the City of Portsmouth project involving the removal and installation of a complete EPDM membrane fully adhered water tight roofing system at Portsmouth High School. It includes electronic submission procedures via OpenGov Procurement, scope of work, special notices, bid schedule interpretation, examination requirements, proposal preparation, nonconforming proposal criteria, proposal guaranty requirements, withdrawal and disqualification conditions, material guaranty, and award execution process. The document emphasizes compliance with laws, bid bond conditions, and the owner's rights regarding proposal acceptance and contract award. It is essential for bidders to follow these instructions to ensure their proposals are considered.
PDF
PDF, High priority: read this firstifb
HighAI Summary for City of Portsmouth Little Harbour Elementary School & PEEP Playground Improvements Bid 19-26: This Invitation for Bid (IFB) document, released on March 20, 2026, by the City of Portsmouth, NH, solicits sealed bids for playground improvements at Little Harbour Elementary School and Portsmouth Early Education Program (PEEP). The project includes site regrading, new playground installation, bike parking, and ADA accessible walkways. Bids must be submitted electronically by April 8, 2026, 2:00 pm. The document contains instructions to bidders, bid bond requirements, pricing tables, bidder documentation, and multiple technical attachments including general conditions and detailed construction divisions. A non-mandatory pre-proposal meeting is scheduled for March 26, 2026. The award will be made to the lowest responsible and qualified bidder based on the base bid and any add alternates deemed in the owner's best interest.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Concrete Formwork Specifications Section 03 11 00: This document is Section 03 11 00 titled Concrete Formwork, detailing the specifications for furnishing and installing forms for cast-in-place concrete. It includes general work scope, related work sections, and references such as ACI standards. The document specifies materials for formwork, including acceptable types of forms, form ties, and release agents. Execution instructions cover preparation, construction requirements for visible concrete surfaces, form tightness, chamfering, and removal of forms with timing and damage prevention guidelines. The document is intended to ensure smooth, true, and dimensionally accurate concrete surfaces as per engineering approval.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Concrete Pavement Specifications Section 32 13 13: This document is Section 32 13 13 titled Concrete Pavements, providing detailed specifications for concrete pavement work. It includes general requirements, scope of work, submittals, legal and permit obligations, definitions, subsurface information, grading, public way work, and quality assurances. The document outlines materials, construction methods, coordination with other trades, and compliance with codes such as the International Building Code and ADA. It also specifies sample panel construction for quality control and references related sections for earthwork, asphalt paving, curbing, fencing, and site furnishings. The document is intended to guide contractors in furnishing and installing concrete pavements according to contract documents and standards.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Division 01 General Requirements and Submittals: This document contains Division 01 specifications for General Requirements and Submittals related to a construction project. It includes detailed instructions for project meetings such as pre-construction and progress meetings, outlining responsibilities, scheduling, coordination, and communication protocols. The submittals section specifies the requirements for submitting shop and working drawings electronically, including procedures, content, and approval processes. The document emphasizes contractor responsibilities for coordination, schedule updates, and compliance with contract documents. It is intended to guide contractors and engineers in managing project execution and documentation effectively.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Division 03 Concrete Specifications: This document contains detailed construction specifications for Division 03 Concrete, including sections 03 11 00 Concrete Formwork, 03 21 00 Concrete Reinforcement, and 03 30 00 Cast-in-Place Concrete. It covers the scope of work, related work, references to standards such as ACI and ASTM, materials, and execution requirements. The document specifies materials for formwork, reinforcement, and concrete placement, along with installation and quality control procedures. It is intended to guide the furnishing and installation of concrete formwork, reinforcement, and cast-in-place concrete for construction projects, ensuring compliance with industry standards and project requirements.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Division 31 Earthwork and Dewatering Specifications: This document contains Division 31 specifications for Earthwork and Dewatering. It includes detailed requirements for excavation, backfilling, compaction, grading, and earthwork operations necessary for the project. The document references standards such as NHDOT, ASTM, AASHTO, and OSHA regulations. It outlines material specifications, protection of existing property, drainage, frost protection, geotechnical testing, and execution procedures including excavation, trenching, backfilling, and disposal of surplus materials. The Dewatering section specifies the design, installation, and operation of temporary dewatering systems to control water levels during construction, ensuring stability and dryness of excavation sites. The document is essential for guiding contractor work and ensuring compliance with technical and safety standards.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Division 32 12 16.13 Hot Mix Asphalt Pavement Specifications: This document is a technical specification section (32 12 16.13) for Hot Mix Asphalt Pavement under Division 32 Exterior Improvements. It outlines the scope of work, reference standards, submittal requirements, project conditions, quality assurance, and product details for asphalt pavement construction. The document references NHDOT Standard Specifications and includes requirements for materials, mix design, placement, compaction, and testing. It specifies gradation requirements for base and overlay courses, weather conditions for application, and protection of existing paved areas. The document is intended to guide contractors in constructing hot mix asphalt pavement to the required standards and includes detailed technical and quality control provisions.
PDF
PDF, High priority: read this firstgeneral-conditions
HighAI Summary for EJCDC C-700 Standard General Conditions of the Construction Contract 2018: This document is the EJCDC C-700 Standard General Conditions of the Construction Contract, 2018 edition. It establishes the fundamental rights, responsibilities, risk allocations, and contractual relationships between the Owner and Contractor for construction projects. The document is intended to be used with related EJCDC agreements and supplementary conditions. It includes detailed provisions on contract administration, definitions, preliminary matters, contract documents, commencement and progress of work, site conditions, bonds and insurance, and contractor responsibilities. The document is copyrighted by the National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers, and is subject to a license agreement for use and modification.
PDF
PDF, High priority: read this firstifb
HighAI Summary for ENG25-0955 Little Harbour School & PEEP Playground Improvements Bid: This document is an Invitation for Bid (IFB) issued on February 24, 2026, by the City of Portsmouth, New Hampshire. It pertains to the Little Harbour School and Portsmouth Early Education Program (PEEP) Playground Improvements project, identified by W&S Project number ENG25-0955. The document serves as the official solicitation for contractors to submit bids for the playground improvement work.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Environmental Protection Specification Section 01 57 19: This document is Section 01 57 19 titled Environmental Protection, detailing environmental protection measures for construction work within wetland and shoreland setback areas. It specifies labor, materials, and methods to prevent environmental pollution during construction, including silt fence, straw bales, straw wattles, and catch basin protection. The document outlines submittal requirements, related work sections, and execution procedures such as notification of non-compliance, area restrictions, water resource protection, and minimizing exposed areas. It emphasizes compliance with Conservation Commissions' Orders of Conditions and includes physical properties for materials used. The document is intended to guide contractors in environmental protection during construction activities near wetlands.
PDF
PDF, High priority: read this firstinsurance-requirements
HighAI Summary for Insurance Requirements for Contractor - City of Portsmouth NH: This document outlines the insurance requirements for contractors working under a contract with the City of Portsmouth, New Hampshire. It specifies the types and minimum amounts of insurance coverage required, including Comprehensive General Liability, Automobile and Truck Liability, Workers Compensation, Contractual Liability, Product and Completed Operations, and Contractors Pollution Liability. The insurance must protect against claims for bodily injury, accidental death, and property damage arising from contract operations. All liability policies must name the City of Portsmouth as an Additional Insured and Certificate Holder, with the contractor's insurance being primary in the event of a loss. The document ensures compliance with state laws and protects the city from liabilities related to contractor operations.
PDF
PDF, High priority: read this firstifb
HighAI Summary for Little Harbour School & PEEP Playground Improvements Bid Cover and TOC: This document is the cover and table of contents for the Invitation for Bid (IFB) issued on February 24, 2026, by the City of Portsmouth, New Hampshire, for the Little Harbour School & Portsmouth Early Education Program (PEEP) Playground Improvements project (W&S Project no. ENG25-0955). It includes general conditions, division specifications covering general requirements, existing conditions, concrete, equipment, earthwork, exterior improvements, and an appendix with maintenance plans. The document outlines the scope and technical specifications necessary for bidding on the project.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Playground Equipment Installation Specifications: This document outlines the specifications and requirements for the installation of playground equipment, which is owner-purchased and installed through a Community Build program. It details the contractor's responsibilities including site preparation, excavation, layout coordination, material handling, and support for volunteer installation under supervision of a Certified Playground Safety Inspector (CPSI) or manufacturer-approved supervisor. The document references applicable standards such as ASTM, CPSC, ADA, and state codes, and specifies qualifications for supervisors and contractors. It also covers guarantees, liability, coordination with other trades, and community build requirements. The document serves as a statement of work for the contractor to prepare the site and support the installation process without assembling the equipment themselves.
PDF
PDF, High priority: read this firstmaintenance-plan
HighAI Summary for Playground Surfacing Maintenance Plans - Appendix A,B,C: This document, titled Appendix A,B,C, provides detailed maintenance plans for playground surfacing at Little Harbour School and The Portsmouth Early Education Program Playgrounds. It includes specific procedures for bonded rubber outdoor surfacing and engineered wood fiber (EWF) surfacing. The maintenance plans cover routine monthly cleaning, stain removal, inspection, and repair guidelines for bonded rubber surfaces, emphasizing environmental protection and surfacing integrity. For EWF, the document outlines weekly inspections, surface leveling, minimum surfacing depth requirements, and surface depth verification to ensure safety and performance. The document also lists recommended equipment and contact information for technical support. The version date is not specified.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Project As-Built Record Drawings: This document is the Project As-Built Record Drawings section outlining the contractor's responsibilities for preparing and submitting as-built record drawings for contractor-installed site work. It excludes owner-furnished playground equipment and safety surfacing. The document details submission requirements including draft and final record drawings in electronic PDF and AutoCAD DWG formats, post-construction survey requirements certified by a Registered Land Surveyor, and maintenance of as-built documentation reflecting all changes during construction. The document is intended to be submitted with the final Application for Payment and coordinates with related contract documents and specifications.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Project Closeout Section 01 78 00: This document is Section 01 78 00 titled Project Closeout, detailing administrative and procedural requirements for closing out a construction project. It covers work included such as as-built documents, checkout and certification, final cleaning, substantial completion, closeout procedures, and final completion. The document specifies contractor responsibilities for maintaining and submitting as-built documents, final cleaning tasks, certification requirements, and punch list procedures. It also outlines closeout submittals including payment evidence, waste manifests, and other records. The document includes a project closeout checklist for verifying completion of required items. This version is a detailed specification section intended to guide the contractor through project closeout steps and documentation.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Project Meetings Requirements Section: This document section titled 'Project Meetings' outlines the requirements for project meetings including the Pre-Construction Conference and Progress Meetings. It specifies the responsibilities of the Contractor to coordinate work among subcontractors and trades. The Pre-Construction Conference is held after bid opening but before construction starts to discuss project phasing, scheduling, communication, responsibilities, and federal requirements such as Davis-Bacon. The document lists detailed agenda items for the conference including schedules, safety, environmental protection, and logistics. Progress Meetings are to be held regularly, initially weekly, to review work progress, coordination, procurement status, quality, claims, and payment status. The Contractor must update and submit revised construction schedules after these meetings. Parts 2 and 3 of the section are not used. This document is essential for guiding project meeting protocols and coordination.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Section 01 33 23 Submittals: This document is Section 01 33 23 titled 'Submittals' and outlines the contractor's responsibilities for providing submittals to the Engineer as required by the contract documents. It includes procedures for electronic submittals, shop and working drawing requirements, review processes, and sample submissions. The document specifies the use of a Submittal Register, details on shop drawing content and approval, and the Engineer's review timeline. It also includes an Exhibit 1 shop drawing transmittal form. The document is essential for ensuring timely and compliant submittal management in the construction contract.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 03 30 00 - Cast-In-Place Concrete Specifications: This document is Section 03 30 00 covering Cast-In-Place Concrete work. It includes general requirements, related work references, and standards from ACI and ASTM. It specifies concrete types, compressive strengths, mix design, submittals, cement types, admixtures, aggregates, water quality, and grout. The document provides detailed technical specifications for concrete materials and placement, including air entrainment, slump limits, and testing requirements, dated as per the contract documents.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 31 00 00 Earthwork Specifications: This document is Section 31 00 00 titled Earthwork, detailing the general requirements, materials, and execution methods for earthwork operations on a construction project. It includes work scope such as excavation, backfilling, compaction, grading, and site preparation. References to standards like NHDOT, ASTM, AASHTO, and OSHA are provided. The document outlines submittal requirements, protection of existing property, drainage, frost protection, and geotechnical testing. Materials specified include gravel borrow, crushed gravel, crushed stone, sand borrow, select backfill, and processed gravel. Execution covers protection and subgrade stability, excavation, trenching and backfilling, compaction, and disposal of surplus materials. The document ensures compliance with safety and environmental regulations and sets quality standards for earthwork operations.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 31 23 19 Dewatering Specifications: This document is Section 31 23 19 titled 'Dewatering' and specifies the requirements for designing, furnishing, installing, operating, and removing temporary dewatering systems during construction. It includes system descriptions, quality assurance criteria, and submittal requirements. The document outlines the disposal of pumped water, dewatering operations, and responsibilities of the contractor to prevent damage and interference. It references related sections for earthwork, environmental protection, and permits. The document ensures groundwater control to maintain dry and stable excavation conditions and protect adjacent structures and utilities.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 32 12 16.13 Hot Mix Asphalt Pavement Specifications: This document is Section 32 12 16.13 detailing the specifications for Hot Mix Asphalt (HMA) Pavement. It outlines the scope of work, reference standards including AASHTO, ASTM, and NHDOT specifications, and submittal requirements such as material certificates and mix formulas. Project conditions specify weather and substrate requirements, traffic control, and grade control. Quality assurance includes preparation, mixing, placement, compaction, and testing criteria with tolerances for surface planarity and thickness. The document also covers protection and repair of existing paved areas. Part 2 describes products including dense graded crushed stone subbase and hot mix asphalt pavement with detailed gradation requirements for base/binder and top/overlay courses, conforming to NHDOT standards.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 32 18 16 Playground Protective Surfacing Specifications: This document, Section 32 18 16, dated as provided, details the specifications for playground protective surfacing. It covers the scope of work including installation of bonded rubber mulch, play sand, engineered wood fiber mulch, and related cleaning and repair. It references related work sections and mandates third-party testing for compliance with EPA, ASTM, and local environmental standards. Submittal requirements include color samples, test results for impact attenuation and accessibility, manufacturer's warranty, insurance certificates, and installer qualifications. Coordination, guarantee, and quality assurance provisions are also specified, emphasizing compliance with ASTM F1292, ASTM F1951, and IPEMA certification for safety and accessibility.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 32 31 13.53 Chain Link Fence Specifications: This document is Section 32 31 13.53, titled 'Chain Link Fence,' providing detailed specifications for materials and installation requirements for chain link fences and gates. It references ASTM standards and Chain Link Fence Manufacturers Institute guidelines for quality and performance. The document covers related work, references, submittal requirements, quality assurance, delivery, storage, and handling instructions. It specifies product details including chain link fabric, steel fence framework, tension wire, fittings, tie wire, hog rings, and swing gates. The document is intended for use in construction projects requiring chain link fencing, ensuring compliance with industry standards and quality assurance measures.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 32 31 29 Wood Guardrail Specifications: This document is Section 32 31 29, detailing specifications for wood guardrail construction. It includes general work scope, material requirements such as treated Southern Yellow Pine timber sizes and preservative treatments compliant with AWPA standards, and hardware specifications including galvanized and stainless steel fasteners. Submittal requirements include product data, treatment certifications, and shop drawings. Execution instructions cover fabrication with pre-drilled holes, installation procedures ensuring proper post embedding and alignment, and treatment of field cuts. The document ensures compliance with quality and durability standards for wood guardrail installation.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 32 33 00 Site Furnishings and Accessories Specification: This document is Section 32 33 00 titled 'Site Furnishings and Accessories' from the Contract Documents. It outlines the scope of work including furnishing and installing bike racks, play bridges, boulders, steel edging, and relocation of a memorial. It references related sections for concrete and paving work. The document details submittal requirements, delivery, storage, handling, coordination, and guarantees. Product specifications for bike racks, play bridges, and boulders are included with manufacturer details, materials, installation instructions, and coordination with other trades. The document is intended for use by contractors and architects to ensure compliance with project requirements.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 32 91 00 - Loam and Planting Preparation Specifications: This document is Section 32 91 00 titled 'Loam and Planting Preparation' and outlines the general requirements, related documents, and detailed work description for planting preparation including subgrade preparation, loam sourcing, sampling, testing, grading, erosion control, and inspection. It references standards such as ASTM and NHDOT, specifies submittal requirements for materials and testing protocols, and mandates compliance with regulatory requirements. The document emphasizes coordination with related work sections and quality assurance measures for soil and planting materials. It serves as a technical specification for contractors involved in planting and landscaping work under the contract.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 32 92 00 Turf and Grasses Specification: This document is Section 32 92 00 titled 'Turf and Grasses' from a contract specification. It outlines the scope of work including seeding, erosion control blanket installation, maintenance, inspection, and protection related to turf and grasses. It references related work sections and emphasizes coordination with other trades. Submittal requirements include material samples, certified analyses for soil amendments, fertilizers, and seed mixtures. Regulatory compliance and quality assurance standards are specified, including licensed applicators and certified landscape professionals. The document details product requirements for loam, soil additives, and seed mixtures, including specific seed compositions and application rates. The version date is not explicitly stated but the content is comprehensive for turf and grass planting work under the contract.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 32 92 19 Seeding Specifications: This document is Section 32 92 19 titled 'Seeding' and provides detailed specifications for grass seeding work including labor, materials, equipment, and maintenance. It covers related work references, submittal requirements for seed mixes and materials, and detailed product specifications for loam, seed types for lawns and slopes, temporary cover crops, mulch, hydroseed materials, slope erosion protection, and water. Execution guidelines specify skilled labor requirements, timing for seeding operations, and conditions for seedbed preparation and maintenance. The document ensures compliance with contract drawings and specifications, emphasizing quality and sustainability of seeded areas.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 32 93 00 Trees Shrubs and Groundcover Planting Specifications: This document is Section 32 93 00, titled Trees Shrubs and Groundcover Planting, providing detailed specifications for planting work including trees, shrubs, groundcovers, bulbs, perennials, and plugs. It outlines the scope of work, related documents, references, submittal requirements, regulatory compliance, quality assurance, planting seasons, delivery, storage, handling, and examination of conditions. The document specifies a one-year plant guarantee, inspection and acceptance criteria, and coordination with related work sections. It includes requirements for material samples, testing, plant material lists, maintenance schedules, and regulatory adherence for fertilizer and pesticide applications. The document is intended for use by contractors and landscape professionals to ensure proper planting and maintenance in compliance with project and regulatory standards.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Selective Site Demolition Specifications Section 02 41 13: This document is Section 02 41 13 titled Selective Site Demolition, outlining the scope, protection measures, special requirements, references, and salvage instructions for demolition work. It details the careful removal, storage, transportation, or demolition of site features and structures to a minimum depth, including pavements, fencing, and play equipment. The document emphasizes safety, protection of adjacent structures, erosion control, and coordination with the Owner and certified installation teams. Salvaged items must be stored on-site and protected until reinstallation. The document also specifies backfill and temporary fencing requirements. It serves as a technical specification guiding demolition and salvage work for a construction project.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Table of Contents for Construction Project Specifications: This document is the Table of Contents for a construction project specification manual. It includes general conditions from the Engineers Joint Contract Documents Committee (EJCDC) and detailed divisions covering general requirements, existing conditions, concrete, equipment, earthwork, and exterior improvements. The appendix contains maintenance plans for bonded rubber, engineered wood fiber, and rain gardens. The document serves as an organized guide to the project's technical specifications and requirements.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Traffic Control Section 01 55 26.13: This document is Section 01 55 26.13 titled Traffic Control, detailing the requirements for furnishing and installing traffic control signs and devices. It references adherence to the Manual on Uniform Traffic Control Devices (MUTCD) as adopted by the New Hampshire Department of Transportation (NHDOT). The section covers work included, product specifications for traffic warning and regulating devices, and execution instructions including installation, relocation, and removal of traffic control devices to ensure safety and minimal interference with public ways. It also mandates coordination with the Owner and authorities for traffic control measures.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Wetlands Protection and Replication Section 32 71 00: This document is Section 32 71 00 titled 'Wetlands Protection and Replication' and outlines the specifications for protecting, replicating, and mitigating impacts to wetland areas. It includes requirements for plants, labor, equipment, materials, and professional services. The document references related environmental protection sections and mandates compliance with the Wetlands Protection Act and other regulations. Key content covers quality assurance, backfill materials, fertilizer, moisture enhancers, mulch types, propagules specifications, hydroseeding, water quality, and detailed planting and maintenance procedures to ensure successful wetland restoration and replication. The document is intended for contractors working adjacent to environmentally sensitive areas and includes technical and procedural details essential for contract performance.
PDF
PDF, Low prioritycontractor-affidavit
LowAI Summary for Contractor's Affidavit for Bid# 19-26 Little Harbour & PEEP Playground Improvements: This document is a Contractor's Affidavit related to the contract for Bid# 19-26 concerning the Little Harbour & Portsmouth Early Education Program (PEEP) Playground Improvements project. It is sworn before a notary public or authorized official, affirming that all costs, claims, and indebtedness arising from the contract performance have been paid in full. The affidavit includes spaces for the state, county, contractor details, and date of notarization.
PDF
PDF, Low prioritybond
LowAI Summary for Labor and Material Payment Bond for City of Portsmouth Contract: This document is a Labor and Material Payment Bond intended for use with contracts involving the City of Portsmouth, New Hampshire. It binds the Contractor (Principal) and Surety Company to ensure payment to all claimants supplying labor, materials, equipment, or services for the contract. The bond outlines claimant rights, notice requirements, and legal conditions for claims. It includes provisions for the bond amount, payment obligations, and limitations on suits. The bond must be signed by authorized representatives of the Principal and Surety, with specific instructions for partnerships and corporations. The document serves as a financial guarantee to protect claimants and the Owner from nonpayment under the contract.
PDF
PDF, Low prioritynotice-to-proceed
LowAI Summary for Notice to Proceed for Little Harbour & Portsmouth Early Education Program Improvements: This Notice to Proceed document notifies the contractor to commence work on the Little Harbour & Portsmouth Early Education Program (PEEP) Improvements project. It references an agreement date and specifies that all work must be completed by a certain date. The notice is issued by Ken Linchey, Director of Buildings & Grounds for the City of Portsmouth, N.H. The document includes an acceptance section for the contractor to acknowledge receipt and acceptance of the notice.
PDF
PDF, Low prioritypermit
LowAI Summary for Wetland Conditional Use Permit for 50 Clough Drive, Portsmouth NH: This document is a Wetland Conditional Use Permit issued by the City of Portsmouth Conservation Commission dated February 19, 2026. It pertains to the property at 50 Clough Drive, Portsmouth, NH, for upgrades to the Portsmouth Little Harbor Elementary School playgrounds to meet universally accessible standards and incorporate nature-based play. The permit details temporary and permanent impacts to the wetland buffer area, landscaping enhancements, and stipulations including educational signage, wetland boundary markers, maintenance standards, and considerations for surface installation. The matter is scheduled for Planning Board review on March 26, 2026, with requirements for revised plans submission by February 25, 2026.
PDF
PDF
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
PhaseClosed
Posted
Solicitation
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
Organization & Contact Information
Show more
AgencyNew Hampshire → School Department Facilities Maintenance
At the Little Harbour Elementary School Area, site improvements will include regrading for play area with accessible features, new playground, bike parking and improved walkways. At the Portsmouth Early Education Program (PEEP) Playground Area, site improvements will include regrading for fully ADA accessible play area and improved walkways. Work may begin at any time after the notice to proceed is issued.