Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Agriculture was posted on September 20, 2010. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Little Vasquez Creek Culvert Project

Awarded
AG-82X9-S-10-0101Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Joliet Job Corps-Request for Quote Parking Lot and Road Repairs
Solicitation # joliet-job-corps-request-quote-parking-lot-road-repairs
Management & Training Corporation (MTC) is seeking bids for a subcontracting opportunity to perform road and parking lot repairs at the Joliet Job Corps Center in Illinois. This fixed-price, single lump sum contract has an estimated value between $100,000 and $250,000. The scope of work includes asphalt pavement replacement covering approximately 62,500 square feet across five key areas, including the guard shack, dorm parking lot, and kitchen/BCT areas. Additionally, the contractor must repair five storm sewer drain structures and five potholes, ensuring all work meets industry standards and proper drainage grades. The project must be completed within 90 consecutive business days following a written Notice to Proceed. Bids will be evaluated based on overall best value, and submission requires a signed MTC Bid for Lump Sum Contract form, a detailed cost breakout on company letterhead, and proof of a mandatory physical site visit. For bids equal to or exceeding $25,000, a bid bond of 20% is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. This opportunity is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Compliance with Construction Wage Rate Requirements (CWRR) is mandatory, requiring weekly certified payroll and adherence to prevailing wage determinations. Final payment is contingent upon a successful final inspection and the submission of operation and maintenance manuals.
Joliet Job Corps

POSTED

about 5 hours ago

DEADLINE

in about 9 hours
NAICS: 237310
New
SLED
CN-0938-23BR BRIDGE 67
Solicitation # CN-0938-23BR
The Cherokee Nation Department of Transportation and Infrastructure is soliciting bids for Project CN-0938-23BR, which involves the replacement and reconstruction of Bridge 67 over Pecan Creek in Cherokee County, Oklahoma. The scope of work includes the removal of the existing bridge and the installation of a 13x40x20/40/20 Fast Cast Bridge with associated approaches. Additional project requirements include the construction of asphalt pavement, placement of sod, installation of fencing and mailboxes, and the application of traffic stripes and signage. This is a Fixed Completion Date Contract that adheres to the 2019 ODOT Standard Specifications as amended by the Cherokee Nation. Prospective bidders must attend a mandatory pre-bid conference on October 20, 2026, at 10:00 a.m. at the CNDOT building in Tahlequah, Oklahoma, as failure to attend will result in the rejection of the bid. All inquiries must be submitted in writing via Bid Express by October 27, 2026. Sealed bids must be submitted through the Bid Express website no later than 10:00 a.m. on November 10, 2026. The contract will be awarded to the lowest responsive and responsible bidder, with a strong emphasis on Indian preference requirements and TERO certifications. Contractors are required to provide a written Quality Control Plan one week prior to the pre-work conference and must utilize a certified independent testing firm. Mandatory submissions include a bid bond, and the successful awardee must provide performance, payment, and maintenance bonds, as well as proof of comprehensive insurance. Labor must comply with Davis-Bacon Wage Determinations, and all work must meet OSHA safety standards. The project is managed by the Cherokee Nation Director and Resident Engineer, who are responsible for inspection and final acceptance.
Cherokee Nation Department of Transportation & Infrastructure

POSTED

about 14 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

The Little Vasquez Creek Culvert Project involves the removal of an existing culvert and the installation of precast footers, streambed simulation material, and steel structures within the Sulphur Ranger District of the Arapaho and Roosevelt National Forest in Grand County, Colorado. The scope of work encompasses clearing and grubbing, erosion control, structural excavation, roadway embankment, compaction, riprap, and roadway surfacing. The project must be completed within forty-five days from the issuance of the notice to proceed. This contract is designated as a total small business set aside. To be considered responsive, offerors must be registered in the Central Contractor Registry and ORCA, and must address all evaluation criteria specified in the solicitation. All inquiries and coordination are managed by Malinda Horitski.

General Info

Contract Value

$72,130

NAICS

237310 - Highway, Street, and Bridge Construction

Place of Performance

Sulphur Ranger District, Arapahoe & Roosevelt National Forest, Grandby, CO, 80446, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice description changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Arapaho And Roosevelt National Forest
Contacts1 person available
OfficeFORT COLLINS, CO, 80526, USA
Office AddressFORT COLLINS, CO, 80526, USA
Contacts

Full Description

Show more
This project is for the removal an existing culvert, excavation, placing precast footers, placing streambed simulation material and assembling steel structures. The work includes but is not limited to clearing and grubbing, erosion control measures, structural excavation, roadway embankment, removing and disposing an existing culvert crossing, compaction, riprap, roadway surfacing, placing, and all other incidental items necessary to complete the project in accordance with the plans and specifications. The allotted time for this contract is forty-five (45) days from the date of issuance of the notice to proceed. All work shall be performed on the Sulphur Ranger District of the Arapaho & Roosevelt National Forest, Grand County, Colorado. A pre-proposal site visit is scheduled for August 19, 2010 at 9:00 a.m. (Details of this meeting will be included in the solicitation). All participants must RSVP by August 17, 2010 by contacting Malinda (Mindy) Horitski at 970-295-6683. This is a total small business set aside. The anticipated date for issuance of the solicitation is on or around August 6, 2010. The due date will be identified on the solicitation. The solicitation will be available for free download at www.fbo.gov. All questions pertaining to this solicitation must be submitted, in writing, to Malinda (Mindy) Horitski at mrhoritski@fs.fed.us or via facsimile to 970-295-6699. All Offerors shall be registered to the Central Contractor's Registry (CCR) in accordance to FAR 52.204-7 to be considered responsive to this solicitation. All Offerors must be registered in ORCA in accordance to FAR 52.204-8 to be considered responsive to this solicitation. All Offerors must respond to all evaluation criteria in Section M of the solicitation to be considered responsive to this solicitation. Offerors to fail to meet these three criteria will not be considered in the Technical Evaluation of offers.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS