Little Walnut Crk-Glenn Ln/Slayton Dr Storm Drain Improvemen

Closed
142387State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the existing Morgans Branch Pumping Station in Belmont, North Carolina. The scope of work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables include the installation of mechanical and electrical systems, such as pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and utilizes EJCDC standard forms for its contracting requirements. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation based on qualifications, financial ability, and strict adherence to bidding documents. Bidders must provide a bid bond, evidence of authority to do business in North Carolina, and documentation of good faith efforts to meet MBE and WBE participation goals, which are set at 10 percent combined for the state and approximately 10.9 percent for MBE and 10.4 percent for WBE per EPA goals. Performance and payment bonds, as well as proof of insurance, are required. Project administration is managed by the City of Belmont with Willis Engineers serving as the project engineer. Payment is processed via Applications for Payment, with payments becoming due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 5 hours ago

DEADLINE

in 15 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including resurfacing, restoration, and the installation of FRP reinforcing systems and access hatches. Technical requirements include the relining, modification, or replacement of steel and ductile iron pipes, installation of valves and piping appurtenances, and the operation of a temporary 11 MGD pumped bypass. Additional tasks encompass electrical and instrumentation upgrades, rehabilitation of reactor mixers and aerators, motor control center component replacement, sluice and slide gate modifications, and general excavation and surveying. This solicitation is open to small businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone entities, with a specific emphasis on DBE, MBE, WBE, and SBE subcontractors. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of bid for reimbursement. Quotes for services and supplies, including lead abatement, metals fabrication, and trucking, are due by November 17, 2026, with the final bid date set for November 18, 2026. Any exceptions to standard subcontract forms must be submitted as redlines alongside the quote.
Garney Pacific, Inc.

POSTED

about 5 hours ago

DEADLINE

in 23 days

AI Contract Overview

Show more

The project involves the comprehensive relocation and replacement of storm drainage infrastructure in the specified area, including the removal of an existing 30- to 36-inch concrete storm drain system within the street right-of-way and the abandonment of approximately 550 linear feet of the existing pipe within an easement through filling with Controlled Low Strength Material (CLSM). The new storm drain system will feature approximately 1,160 linear feet of reinforced concrete pipe ranging from 18 to 36 inches in diameter, complemented by new curb inlets, concrete headwalls, junction boxes, and manholes to ensure proper drainage. Additionally, the work includes relocating roughly 1,230 linear feet of 6- to 8-inch sewer mains and associated manholes, as well as approximately 400 linear feet of 6- to 8-inch water mains and their respective services, to improve infrastructure resilience and capacity. The contract, titled Little Walnut Creek-Glenn Lane/Slayton Drive Storm Drain Improvements, was posted on April 7, 2025, with a response deadline of May 8, 2025. It is managed by the City of Austin, Texas, under NAICS code 237110, with a project budget estimated between 1.5 million and 3 million dollars. The project aims to enhance stormwater management and utility services in the area, with primary contact being Sofia Johnson, reachable via email or phone. The solicitation is open for qualified contractors to submit proposals through the designated online portal.

General Info

Documents

3

IFB CLMC1112 - Glenn Lane / Slayton Drive Storm Drain Improvements MBE/WBE Packet

PDF, High priority: read this firstifb
High

IFB CLMC1112 - Glenn Lane / Slayton Drive Storm Drain Improvements MBE/WBE Packet

PDF, High priority: read this firstifb
High

IFB_6100_CLMC1112_TECH_DOC_v1 (1).pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas → City of Austin
Contacts1 person available
OfficeN/A
Organization / AgencyTexas → City of Austin
Office AddressN/A
Contacts
Sofia Johnson

Full Description

Show more
The Work consists of the relocation of an existing 30- to 36-inch concrete storm drain from easement to street right-of-way. Work consists of the removal of the entirety of the existing storm drain system in street right-of-way and abandonment of approximately 550 linear feet of 30- to 36-inch existing storm drain within easement via filling the pipe with Controlled Low Strength Material (CLSM). The new storm drain system consists of eight new curb inlets, approximately 1,160 linear feet of 18- to 36-inch reinforced-concrete-pipe storm drain, and associated concrete headwall, junction box, and manholes. The work also consists of the relocation of approximately 1,230 linear feet of 6- to 8-inch sewer main and associated manholes, and wastewater services, and the relocation of approximately 400 linear feet of 6- to 8-inch water main and associated water services.

More opportunities from Texas → City of Austin

Same awarding agency

NAICS: 335139
New
SLED
Lamp, High Pressure Sodium
Solicitation # IFQ 1100 AGM1033
The City of Austin has issued solicitation IFQ 1100 AGM1033 for the procurement of High Pressure Sodium (HPS) lamps. The scope of work includes the supply of 400-watt, 250-watt, and 100-watt lamps, with specific quantities requested for the 400-watt (200 units), 250-watt (400 units), and 100-watt (500 units) varieties. Technical requirements specify that the lamps must be non-cycling, rated for 30,000 hours of life, feature a welded lead-free brass base, and contain up to 90 percent less mercury than standard HPS lamps while passing federal TCLP limits. Delivery is required FOB Destination to the Austin Energy St. Elmo Warehouse. Award will be granted to the lowest offer that meets all minimum qualifications. Submissions must include a signed offer sheet, a completed pricing sheet, and any necessary materials specifications or Safety Data Sheets for hazardous materials. The contract is governed by the City of Austin's terms and conditions, which include a 30-day payment term, a three-year record retention requirement, and a mandate for force majeure notices within three business days. Contractors must comply with the City's non-discrimination certifications, the Wage Theft Ordinance, and the Lone Star Infrastructure Protection Act. Additionally, awarded employers must complete the City of Austin Wage Theft Training within 30 days of the award.
Electric Lamp Bulb and Other Lighting Equipment Manufacturing

POSTED

3 days ago

DEADLINE

N/A
View Details
NAICS: 423610
New
SLED
Termination Kit Indoor Cold Shrink
Solicitation # IFQ 1100 AGM1032
Solicitation IFQ 1100 AGM1032, issued by the City of Austin, seeks the procurement of Indoor Cold Shrink Termination Kits (750-350 MCM for 15 & 35KV), which must include a shearbolt terminator and sealing strips. The contract is awarded to the lowest offer that meets all minimum qualifications, with evaluation based on individual line items, categories, or aggregate pricing. Delivery is set as FOB Destination to the Austin Energy St. Elmo Warehouse, and the contractor must specify the number of days for delivery after receipt of order. Payments are processed within thirty days of invoice submission to the authorized contact. Offerors must submit a signed Offer Sheet, a completed Pricing Submittal Sheet, and any required Safety Data Sheets (SDS) for hazardous materials by 2:00 PM on October 28, 2026, via email to Ahide Garcia-Martinez. Required certifications include compliance with the Austin City Code regarding non-discrimination, non-retaliation, and the Wage Theft Program, as well as verification that no Critical Electrical Grid Equipment is provided by an LSIPA Designated Company. Contractors are required to maintain appropriate insurance, comply with OSHA health and safety laws, and ensure all shipments are clearly marked with the City's name, address, contents, and contract number.
Electrical Apparatus and Equipment, Wiring Supplies, and Related Equipment Merchant Wholesalers

POSTED

4 days ago

DEADLINE

N/A
View Details
NAICS: 335312
New
SLED
Motor 100 HP with Heaters
Solicitation # IFQ 1100 AGM1031
Solicitation IFQ 1100 AGM1031, issued by the City of Austin, Texas, seeks the procurement of a 100 HP Motor with Heaters, specifically identifying Westinghouse part number HH1004 as the approved manufacturer and part. The contract is awarded to the lowest offer that meets all minimum qualifications and technical specifications. While price is the primary driver, the City considers lead time as an important factor in determining the best value and may request references from the lowest offeror prior to award. Delivery is required on an FOB Destination, prepaid and allowed basis, with all freight charges included in the item price. Contractors must adhere to strict packaging and marking requirements, ensuring all shipments are clearly labeled with the City's name, address, contents, and contract number. For any hazardous materials, the submission of OSHA Form 20 Safety Data Sheets is mandatory, and shipments must comply with U.S. Department of Transportation and Environmental Protection Agency regulations. Awarded vendors are subject to various certifications, including non-debarment, non-discrimination under Austin City Code Sec. 5-4-2, and compliance with the Lone Star Infrastructure Protection Act regarding critical electrical grid equipment. Additionally, employers must complete the City of Austin Wage Theft Training within 30 days of the award. Payments are processed within 30 days of receiving a properly documented invoice following satisfactory delivery.
Motor and Generator Manufacturing

POSTED

4 days ago

DEADLINE

N/A
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS