LN-Peebles to Rowatt - 230kV -New Build

Closed
1017770International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237130
New
SLED
Pre-Qualification for Upcoming Overhead Construction Bids - WA
Solicitation # 2026-88
Solicitation 2026-88 is a Request for Qualifications issued by SECO Energy to establish a pool of prequalified contractors for future Overhead Feeder Construction and New Feeder Install projects. This is a mandatory requalification process; any firm previously qualified with SECO Energy must resubmit their qualifications to be eligible for upcoming Requests for Proposals expected in October 2026. The general scope of work includes directional boring, underground excavation, installation of 4-inch conduit systems and duct banks, placement of 1000 MCM 25 kV EPR aluminum primary cable, and the installation of underground switchgear, splice boxes, and grounding systems, as well as right-of-way clearing and site restoration. To be deemed qualified, vendors must complete a comprehensive questionnaire covering company information, technical capabilities, and references from electric cooperatives or public utilities. Key requirements include the ability to provide a 10 percent bid bond and a 100 percent performance bond, as well as the submission of three years of safety records, including EMR ratings and OSHA 30A summaries. While projects will utilize Rural Utility Service funding and may require Davis-Bacon Act compliance, a lack of prior RUS experience is not an automatic disqualifier. Evaluation is based on the firm's risk management profile, including sam.gov registration and Dun and Bradstreet PAYDEX scores, and their demonstrated ability to perform similar utility construction activities.
Seco Energy

POSTED

about 17 hours ago

DEADLINE

in 8 days
NAICS: 237130
New
Federal
Power Construction and Services II (PCS II) MATOC
Solicitation # W912BU26RA032
The US Army Corps of Engineers, Philadelphia District, is soliciting proposals for the Power Construction and Services II (PCS II) Multiple Award Task Order Contract (MATOC). This firm-fixed-price Indefinite Delivery/Indefinite Quantity (IDIQ) contract is designed to provide power construction and services in contingency or austere environments. The scope of work covers the United States Central Command (CENTCOM) Area of Responsibility and select European Command (EUCOM) countries, including Ukraine, Poland, Romania, Bulgaria, Kosovo, Bosnia, Norway, Turkey, Slovakia, and Greenland. The government intends to award between three and seven contracts to a pool of contractors with a total shared capacity not to exceed 249 million dollars. Each award will have a five-year term with a six-month option and a minimum guaranteed amount of 10,000 dollars. The contract encompasses single-source responsibility for the design, construction, and maintenance of low, medium, and high voltage electrical power plants and distribution systems. Services include assessing power needs, technical assistance, fueling, and conducting preventive and emergency maintenance. Proposals are evaluated using a best-value tradeoff process focusing on technical approach, past performance, and price. Submissions must be made electronically via the PIEE Solicitation Module by November 3, 2026, at 4:30 P.M. EST. Key compliance requirements include adherence to DFARS provisions regarding Russian fossil fuel business operations, CMMC cybersecurity standards, and specific host-nation compliance for projects in Turkey, Romania, and Poland.
W2SD Endist Philadelphia

POSTED

about 17 hours ago

DEADLINE

in 12 days
NAICS: 237130
New
SLED
Fiber Optic Construction and Related Services
Solicitation # P-10000553
Solicitation P-10000553 is issued by the Baltimore County Office of Information Technology for Fiber Optic Construction and Related Services. The project is part of a broader effort funded by the U.S. Department of Commerce's Broadband Technology Opportunities Program to expand middle-mile broadband infrastructure across Maryland, specifically supporting the Inter-County Broadband Network. The scope of work includes aerial and underground construction, such as directional boring, micro-trenching, excavation, and vegetation management, as well as cable installation, termination, and utility locating services. All work must adhere to OIT Technical Standards and be performed in a workmanlike manner in compliance with all applicable laws. The contract has an initial term of three years with the option for five additional one-year renewals. Award will be based on a combination of technical and price responses, with key evaluation factors including organizational proficiency, technical qualifications, fiscal structure, and MWBE participation. Contractors are required to provide performance and payment bonds equal to the contract amount and must comply with Maryland prevailing wage laws. Environmental sustainability is a priority, requiring the use of recyclable or biodegradable packaging and the implementation of waste reduction practices. Proposals are due electronically by January 14, 2027.
Office of Information Technology

POSTED

1 day ago

DEADLINE

in 3 months
NAICS: 237130
New
International
Telecom Network Infrastructure Services for Mobile Radio Sites and Telecom Tower Services
Solicitation # NTV 25199
The British Columbia Hydro and Power Authority has issued Notice to Vendors NTV 25199 as a preliminary announcement for an upcoming procurement opportunity, RFP 24043, regarding Telecom Network Infrastructure Services. The scope of work focuses on the inspection, maintenance, and renewal of mobile radio sites and microwave tower infrastructure across British Columbia, including remote and complex environments. Key requirements include providing warehouse capabilities for equipment pre-staging, transporting and installing prefabricated infrastructure such as helipads and shelters, integrating batteries and antennas, and performing tower audits and repair call-outs. The selected providers will also be responsible for supplying miscellaneous materials and coordinating project management with other contractors, such as helicopter service providers. BC Hydro intends to award contracts to approximately two to four suppliers overall, with up to two suppliers per service scope. The anticipated agreements will feature an initial five-year term, with potential extensions for up to ten additional years, totaling a potential term of fifteen years. Preferred suppliers should demonstrate strong telecommunications expertise, a commitment to safety and quality, and specific organizational experience working with electric utilities. While this notice is not a formal call for tenders, interested parties are encouraged to submit a response form to Ana Palmero. The formal RFP is expected to be released in November 2026 via the BC Bid platform.
British Columbia Hydro and Power Authority

POSTED

1 day ago

DEADLINE

in 6 days
NAICS: 237130
New
Federal
P210 ELECTRIC POWER PLANT AND ELECTRICAL DISTRIBUTION SYSTEM AT CHABELLEY AIRFIELD, DJIBOUTI
Solicitation # N6247027R0001
The P210 project is a Design-Bid-Build, Firm Fixed Price contract for the construction of an electrical power plant and distribution system at Chabelley Airfield in Djibouti. The scope of work includes the installation of six diesel generators, each rated at 830 eKW, along with critical support infrastructure such as fuel storage tanks, a fuel polishing system, and a steel-framed metal canopy. The project also requires the implementation of an automated generator control system, underground electrical infrastructure, substation switchgear in a prefabricated facility, and a paralleling programmable logic controller system. All construction must adhere to Djibouti host nation regulations and the Overseas Environmental Baseline Guidance Document, utilizing ultra-low sulfur diesel. The estimated magnitude of construction is between 25 million and 100 million dollars, with a period of performance of approximately 1,045 calendar days following the notice to proceed. Award decisions will be based on non-price evaluation factors, including experience, technical solution, safety, and past performance. Prospective contractors must be registered in the System for Award Management and provide performance bonding. The solicitation is managed by Navfacsyscom Atlantic, with primary coordination through Taylor Povich.
Navfacsyscom Atlantic

POSTED

1 day ago

DEADLINE

in 25 days
NAICS: 237130
New
High Voltage Electrical Basic Ordering Agreement (BOA)
Solicitation # LAW02202026A
Solicitation LAW02202026A is a Basic Ordering Agreement (BOA) managed by UT-Battelle LLC for the Department of Energy to provide overhead electrical distribution services for the Oak Ridge National Laboratory (ORNL) system, operating at nominal voltages of 13.8 kV and 2400 V. The scope of work encompasses routine maintenance, including pole and insulator inspections and vegetation management, as well as facility expansion and construction involving the installation of new lines and infrastructure upgrades. The agreement requires the seller to maintain 24/7 availability for emergency responses, with a mandatory mobilization timeframe of 24 hours following notification. All work must be performed in accordance with ORNL oversight and adhere to strict technical and safety standards, including OSHA regulations 1910 and 1926, the National Electrical Safety Code (NESC), the National Electrical Code (NEC), and IEEE standards. The seller is required to comply with site-specific processes such as Lockout/Tagout (LOTO), Power Distribution Work Permits (PDWP), and Integrated Safety Management. Personnel must be properly trained and certified for the specific voltage classes involved, and all seller-furnished equipment must meet OSHA and ANSI standards. Performance is evaluated based on adherence to these safety protocols, participation in pre-job briefings, and the quality of work verified by ORNL Electrical Utilities.
Ornl Ut-Battelle Llc-Doe Contractor

POSTED

2 days ago

DEADLINE

N/A
NAICS: 237130
New
SLED
Excelsior Broadband Network (EBN) Fiber Construction Services & Network Maintenance Segment: NYC - Albany, ITB
Solicitation # 2140120
Empire State Development is soliciting bids for the Excelsior Broadband Network Fiber Construction Services and Network Maintenance project, specifically for the segment spanning approximately 172.6 route miles from New York City to Albany. This initiative, part of the ConnectALL program, involves the installation of roughly 196.55 miles of 864 and 1728-count all dielectric fiber optic cable utilizing existing spare conduits, handholes, and regeneration buildings. The project is structured into three distinct phases: Inspection and Proofing Services to be completed within 90 days of execution, Fiber Construction Services within 240 days, and ongoing Network Maintenance for the duration of the contract. Bidders must submit a two-part proposal consisting of a technical submission and an administrative submission by November 13, 2026. Key requirements include a 50,000 dollar bid bond, 100 percent performance and payment bonds upon award, and strict adherence to prevailing wage laws and NYSTA safety rules. The contract establishes socioeconomic goals of 15 percent for Minority-owned Business Enterprises, 15 percent for Women-owned Business Enterprises, and 6 percent for Service-Disabled Veteran-Owned Businesses. Additionally, vendors must comply with rigorous IT security standards, including ISO 27001 and GDPR, and provide a detailed staffing plan and deployment schedule to be evaluated for award.
Empire State Development

POSTED

2 days ago

DEADLINE

in 22 days
NAICS: 237130
New
SLED
Term Agreement with 4 Options to Renew - Fiber Optic Maintenance, Repair and Modernization for IT, Transportation, and Water Departments
Solicitation # REQ00003176
The City of Garland is soliciting bids for a term agreement under solicitation REQ00003176 to provide fiber optic maintenance, repair, and modernization services for its IT, Transportation, and Water Departments. The contract consists of an initial twelve-month term with four optional twelve-month renewal periods. The City intends to award the contract to the two highest-ranked respondents, designating one as the primary contractor and the other as the secondary contractor to ensure redundancy and emergency response capacity. Award decisions are based on best value, evaluated through overall qualifications, client references, and relevant project examples. The scope of work requires the contractor to provide all labor, materials, and equipment for installation, troubleshooting, and emergency repairs of critical infrastructure, including public safety and SCADA systems. Critical priority outages require a two-hour response time. Deliverables include schematic diagrams, OTDR test files, and as-built drawings, with a minimum two-year workmanship warranty required for all services. Bidders must submit comprehensive bids on all items to be considered responsive, adhering to Texas Government Code Chapter 2258 for prevailing wage rates. Materials are to be billed at actual cost plus a markup not exceeding 10 percent. All submissions must be made electronically via the IonWave portal by November 5, 2026.
City Of Garland

POSTED

3 days ago

DEADLINE

in 14 days

AI Contract Overview

Show more

Saskatchewan Power Corporation is soliciting proposals for the LN-Peebles to Rowatt 230kV New Build project, which involves the construction of new power lines divided into two distinct sections. The Peebles Work consists of approximately 63km of construction involving 219 structures from the Peebles Switching Station A-Frame to structure 219, while the Rowatt Work covers approximately 69.5km and 224 structures from structure 219 to the Rowatt switching Station A-frame. Each section will be awarded to a separate proponent. Interested parties can access the RFP and associated appendices via Merx, where all amendments and clarifications will be posted. In the event of any discrepancies between the provided Word and PDF documents, the PDF version takes precedence. The response deadline for this solicitation is April 15, 2026, and inquiries should be directed to the primary point of contact, Aayoush Neupane.

General Info

SaskPower seeks proposals for two 230kV power line sections by April 15, 2026.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencySaskatchewan Public Sector → Saskatchewan Power Corporation
Contacts1 person available
OfficeN/A

Full Description

Show more
The project will be split into two (2) section of work, Peebles Work and Rowatt work. The Work will be awarded to two (2) proponents (one award for each section of work) as per the following: Peebles Work: Approximately 63km (219 structures) of new line construction from the Peebles Switching Station A-Frame to structure #219 Rowatt Work: Approximately 69.5km (224 structures) of new line construction ahead span of structure #219 to the Rowatt switching Station A-frame.
This opportunity is available for download at www.merx.com/saskpower, and all amendments, addenda, clarifications, and further instructions will also be posted on Merx. Both a Microsoft Word and an Adobe PDF version of the RFP, Appendix A, Appendix B and Appendix C are provided .in MERX If there is any inconsistency or discrepancy between the Word version and the PDF version of this RFP,Appendix A, Appendix B and Appendix C, the PDF version shall prevail.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS