LOLO NATIONAL FORES T - Upper West Fork Fish Creek Trail Bridge Replacement

Active
1240LU25R0001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract involves the removal and replacement of an existing trail bridge and its substructure on Trail 101, milepost 3.1, located within the Ninemile Ranger District of the Lolo National Forest in Montana, inside the Great Burn Proposed Wilderness. The work includes dismantling and disposing of the current structure, performing structural excavation, installing foundation components, and furnishing, hauling, and erecting the new bridge along with adjusting adjacent trail grades to align with design plans. Due to the project's location in a proposed wilderness area, specific resource protection measures and limitations on equipment use are mandated. The site is accessible via Interstate 90 west of Missoula, and a formal site visit is scheduled for October 17, 2024, at the West Fork Fish Creek Trailhead for interested vendors. The contract performance window allows vendors to choose to start and complete the work exclusively in either the 2025 or 2026 construction season, with all in-stream activities restricted to the period between July 15 and September 1 of the selected year, and final completion required by mid-September of that year. The estimated contract value ranges between $500,000 and $1,000,000, and the solicitation is a total small business set-aside. Bidders must submit a 20% bid bond with their proposal, while the awarded contractor will be required to provide performance and payment bonds equal to 100% of the contract value. Coordination and communication regarding site visits and proposals are managed by the contracting officer, Alisha Knaub.

General Info

Removal and replacement of Trail 101 bridge in Lolo National Forest, with seasonal restrictions and small business set-aside.

Agency

Department Of Agriculture → Lolo National ForestView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

MT, USA

Set-Aside

SBA

Documents

(2)

Presolicitation Notice for Upper West Fork Fish Creek Trail Bridge Replacement

PDF1 pagepresolicitation

Draft Construction Plans for Upper West Fork Fish Creek Trail Bridge Replacement, Lolo National Forest

PDF13 pagesdraft-solicitation

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

PhasePresolicitation
Posted

Presolicitation

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Lolo National Forest
Contacts1 person available
OfficeMISSOULA, MT, 59804, USA
Organization / Agency
Department Of Agriculture → Lolo National Forest
View Agency Profile
Office AddressMISSOULA, MT, 59804, USA

Full Description

Show more
THIS PRESOLICITATION NOTICE IS ISSUED FOR INFORMATIONAL PURPOSES ONLY TO PROVIDE AN OPPORTUNITY FOR VENDORS TO ASSESS THE PROJECT SITE PRIOR TO INCLEMENT WEATHER OR SEASONAL CLOSURES AND PRIOR TO ISSUANCE OF THE SOLICITATION. THIS IS NOT A REQUEST FOR PROPOSAL/QUOTE OR BID. The Forest Service anticipates issuing a full solicitation at a time when the project site will be unavailable due to seasonal closures/weather. Interested vendors are encouraged to visit the site (see information below for specific site visit tour) for a full understanding and, if desired, take photos or videos. PROJECT DESCRIPTION: The intent of the contract is to remove and replace an existing trail bridge and substructure elements on Trail 101, milepost 3.1 on the Ninemile Ranger District, Lolo National Forest, within the Great Burn Proposed Wilderness. The structure is located in Section 19, Township 13 North, Range 25 West, Mineral County, Montana. The contractor is to furnish the replacement trail bridge structure and substructure. This project includes, but is not limited to, removing and disposing of the existing trail bridge and substructure elements, structural excavation and installation of foundation components, furnishing, loading, hauling and erecting the bridge, adjustment of adjacent trail grades to match design plans, and all other incidental items necessary to complete the work according to the contract. This project is located within a proposed wilderness area therefore a list of Resource Protection Measures and Restricted Equipment is required for this project PROJECT LOCATION: The project can be accessed by traveling 37 miles west of Missoula on Interstate 90. Take the Fish Creek Exit #66. Follow Fish Creek Road #343 south to West Fork Fish Creek Road #7750. Follow Road #7750 to the end at Clearwater Crossing Campground. The project is located on Trail 101 at milepost 3.1. PERIOD OF PERFORMANCE: The contractor may elect to begin work post-award in either 2025 or 2026, but not both. All work must be completed within the chosen year's construction season. In-stream work is only permitted from July 15th to September 1st of chosen performance year. All work items must be completed by September 15, 2025, if 2025 performance year is chosen, or September 15, 2026, if 2026 is chosen. MAGNITUDE OF CONSTRUCTION (per FAR 36.204(b)): Between $500,000 and $1,000,000. BONDING: All offerors will be required to provide a Bid Bond (20%) with their proposal submission. Performance and Payment Bonds (100% each) will be required of the successful awardee. FORMAL SITE VISIT: A formal site visit will be conducted on Thursday, October 17, 2024. Anyone interested in attending, meet at the West Fork Fish Creek Trailhead (directions above) at 0930 on October 17th. Contractors shall notify the Government via email to alisha.knaub@usda.gov no later than COB Tuesday, October 15, 2024 if attending.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment
Solicitation # HD-S3135
Kiewit Infrastructure West Co. is soliciting quotes from qualified subcontractors, material contractors, and suppliers for the Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment project in Long Beach, California. The scope of work is extensive, covering heavy civil and infrastructure activities including site preparation, asbestos abatement, tunneling, directional drilling, underground piping, asphalt and concrete paving, electrical work, and telecommunications. The project is partially funded by multiple grants from the FHWA, LACMTA, the State of California Transportation Agency, and the U.S. DOT MARAD, necessitating strict adherence to DBE Program requirements and the California Labor Code. Eligible bidders must possess a valid California Contractor’s license and provide acceptable insurance. SBE and VSBE firms must provide certification evidence from the Department of General Services and the Port of Long Beach PlanetBids portal. The project is subject to a Project Labor Agreement, prevailing wage rates, and requires firms performing onsite work to be signatory to collective bargaining agreements with specific trades to ensure labor harmony. Subcontractors may be required to provide bonding for 100% of their contract value, with bond premiums reimbursed by Kiewit. Interested parties must contact the Lead Estimator to receive an Invitation to Bid via the BuildingConnected system before the September 15, 2026, deadline.
Kiewit Infrastructure West Co.

POSTED

about 10 hours ago

DEADLINE

in 6 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS