Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

LOLO NATIONAL FORES T - Upper West Fork Fish Creek Trail Bridge Replacement

Active
1240LU25R0001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract involves the removal and replacement of an existing trail bridge and its substructure on Trail 101, milepost 3.1, located within the Ninemile Ranger District of the Lolo National Forest in Montana, inside the Great Burn Proposed Wilderness. The work includes dismantling and disposing of the current structure, performing structural excavation, installing foundation components, and furnishing, hauling, and erecting the new bridge along with adjusting adjacent trail grades to align with design plans. Due to the project's location in a proposed wilderness area, specific resource protection measures and limitations on equipment use are mandated. The site is accessible via Interstate 90 west of Missoula, and a formal site visit is scheduled for October 17, 2024, at the West Fork Fish Creek Trailhead for interested vendors. The contract performance window allows vendors to choose to start and complete the work exclusively in either the 2025 or 2026 construction season, with all in-stream activities restricted to the period between July 15 and September 1 of the selected year, and final completion required by mid-September of that year. The estimated contract value ranges between $500,000 and $1,000,000, and the solicitation is a total small business set-aside. Bidders must submit a 20% bid bond with their proposal, while the awarded contractor will be required to provide performance and payment bonds equal to 100% of the contract value. Coordination and communication regarding site visits and proposals are managed by the contracting officer, Alisha Knaub.

General Info

Removal and replacement of Trail 101 bridge in Lolo National Forest, with seasonal restrictions and small business set-aside.

Agency

Department Of Agriculture → Lolo National ForestView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

MT, USA

Set-Aside

SBA

Documents

(2)

Presolicitation Notice for Upper West Fork Fish Creek Trail Bridge Replacement

PDF1 pagepresolicitation

Draft Construction Plans for Upper West Fork Fish Creek Trail Bridge Replacement, Lolo National Forest

PDF13 pagesdraft-solicitation

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

PhasePresolicitation
Posted

Presolicitation

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Lolo National Forest
Contacts1 person available
OfficeMISSOULA, MT, 59804, USA
Organization / Agency
Department Of Agriculture → Lolo National Forest
View Agency Profile
Office AddressMISSOULA, MT, 59804, USA

Full Description

Show more
THIS PRESOLICITATION NOTICE IS ISSUED FOR INFORMATIONAL PURPOSES ONLY TO PROVIDE AN OPPORTUNITY FOR VENDORS TO ASSESS THE PROJECT SITE PRIOR TO INCLEMENT WEATHER OR SEASONAL CLOSURES AND PRIOR TO ISSUANCE OF THE SOLICITATION. THIS IS NOT A REQUEST FOR PROPOSAL/QUOTE OR BID. The Forest Service anticipates issuing a full solicitation at a time when the project site will be unavailable due to seasonal closures/weather. Interested vendors are encouraged to visit the site (see information below for specific site visit tour) for a full understanding and, if desired, take photos or videos. PROJECT DESCRIPTION: The intent of the contract is to remove and replace an existing trail bridge and substructure elements on Trail 101, milepost 3.1 on the Ninemile Ranger District, Lolo National Forest, within the Great Burn Proposed Wilderness. The structure is located in Section 19, Township 13 North, Range 25 West, Mineral County, Montana. The contractor is to furnish the replacement trail bridge structure and substructure. This project includes, but is not limited to, removing and disposing of the existing trail bridge and substructure elements, structural excavation and installation of foundation components, furnishing, loading, hauling and erecting the bridge, adjustment of adjacent trail grades to match design plans, and all other incidental items necessary to complete the work according to the contract. This project is located within a proposed wilderness area therefore a list of Resource Protection Measures and Restricted Equipment is required for this project PROJECT LOCATION: The project can be accessed by traveling 37 miles west of Missoula on Interstate 90. Take the Fish Creek Exit #66. Follow Fish Creek Road #343 south to West Fork Fish Creek Road #7750. Follow Road #7750 to the end at Clearwater Crossing Campground. The project is located on Trail 101 at milepost 3.1. PERIOD OF PERFORMANCE: The contractor may elect to begin work post-award in either 2025 or 2026, but not both. All work must be completed within the chosen year's construction season. In-stream work is only permitted from July 15th to September 1st of chosen performance year. All work items must be completed by September 15, 2025, if 2025 performance year is chosen, or September 15, 2026, if 2026 is chosen. MAGNITUDE OF CONSTRUCTION (per FAR 36.204(b)): Between $500,000 and $1,000,000. BONDING: All offerors will be required to provide a Bid Bond (20%) with their proposal submission. Performance and Payment Bonds (100% each) will be required of the successful awardee. FORMAL SITE VISIT: A formal site visit will be conducted on Thursday, October 17, 2024. Anyone interested in attending, meet at the West Fork Fish Creek Trailhead (directions above) at 0930 on October 17th. Contractors shall notify the Government via email to alisha.knaub@usda.gov no later than COB Tuesday, October 15, 2024 if attending.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Fleet Fast EV Charging - ConstructionThe Port of Seattle’s Aviation Project Management Group is forecasting a construction contract for fast electric vehicle charging infrastructure for its fleet operations, with the solicitation expected to be released in the near future. The project falls under NAICS code 237310, which categorizes it as electrical and other construction services, indicating that it will involve site preparation, electrical system installations, and potentially associated civil works for charging stations. The contract will be managed by the Port of Seattle as the lead agency, with the primary point of contact being Angela Peterson, who can be reached via phone or email for inquiries, and Katie Techa serving as the project manager for technical coordination. The work is anticipated to take place at locations under the Port’s operational control related to fleet vehicle use, though specific sites have not yet been defined. There are no details provided on set-aside provisions, indicating the opportunity may be open to all eligible contractors. The posting date suggests the formal solicitation will follow in 2026, allowing potential vendors time to prepare proposals aligned with the Port’s sustainability and fleet electrification goals. Interested parties should monitor the provided UI link for updates and the official solicitation when it becomes available.
Aviation Project Management Group

POSTED

about 5 hours ago

DEADLINE

N/A
View Details
NAICS: 237310
New
SLED
Fisherman’s Terminal (FT) Entry and Exit Paving RedevelopmentThe Fishermen’s Terminal Entry Redevelopment Project will focus on upgrading the entry and exit drives along 19th Avenue West, demolishing the remaining slab of the Downie Building (C-14), and replacing its footprint with a mix of new parking, green space, and pollinator habitat, potentially incorporating a stormwater treatment facility. Existing pavement in poor condition will be milled and overlaid, while stormwater infrastructure will be fully replaced and expanded to divert runoff from combined sewer lines to dedicated storm lines, with water quality treatment applied to qualifying pavement areas. A new irrigation system will support the landscaped green spaces, including the renovated median within the entry drive, and electric vehicle charging stations will be installed in the new parking area. The project also includes the addition of a protected two-way bike lane linking the terminal entry to the existing West Wall bike path, along with enhanced pedestrian connections to the intersection of 21st Avenue West and W Emerson Place and the nearby King County Metro bus stop. Improved lighting will be installed throughout the new parking area and connecting paths, and new wayfinding elements will guide pedestrian and bicycle traffic. All work is being led by the Port of Seattle through its Waterfront Project Management team, with the project classified under NAICS code 237310 for heavy and civil engineering construction, and the solicitation is forecasted for release in July 2026, with Mike Van Cleve and Terrence Moody listed as primary contacts.
Waterfront Project Management

POSTED

about 5 hours ago

DEADLINE

N/A
View Details
NAICS: 237310
New
SLED
Asphalt Paving & Striping Portwide Unit Price 2026The contract encompasses a wide range of asphalt paving, striping, and related infrastructure work across multiple Port of Seattle facilities including Seattle-Tacoma International Airport, maritime properties, and surrounding areas. Work includes new asphalt placement and patching, overlays with fabric, crack sealing, seal coating, profile grinding, spoil hauling and disposal, removal of existing pavement markings, surface preparation for new striping, stripe painting, saw cutting and coring of non-hazardous materials, installation of concrete wheel stops, curb repair and replacement, sidewalk lifting and leveling, and enhancements to road drainage systems which may necessitate permitting. All tasks are to be executed under a unit price framework scheduled for performance in 2026, with specifications designed to ensure comprehensive surface maintenance and improvement across Port-controlled properties. The contract is managed by Port Construction Services under the Port of Seattle, with primary point of contact Heather Bowden available via phone and email for inquiries, and Lesley Miles serving as the project manager. Although no solicitation number is provided and the posting date is listed as July 26, 2026, the document is classified as a forecast, indicating this is a planning notice rather than an active procurement. The NAICS code 237310 confirms the scope falls under Highway, Street, and Bridge Construction, and all work is to be conducted at various locations within the Port’s jurisdiction without restriction to a single site.
Port Construction Services

POSTED

about 5 hours ago

DEADLINE

N/A
View Details
NAICS: 237310
New
SLED
CDBG Project #51-04-25 - Studio Fitness Court Park Equipment InstallationSealed bids for the CDBG Project #51-04-25, Studio Fitness Court Park Equipment Installation at 100 Garrett Road, Upper Darby, PA 19082, will be accepted electronically via the PennBid platform until August 13, 2026, at 4:00 PM EST, with no physical opening. The scope is limited to the installation of Studio Fitness Park Equipment only, and all bids must comply with the contract documents including site plans, demolition and repair details, and technical specifications. Bidders are required to submit a bid bond equal to 10% of the bid amount, and the successful bidder must provide a performance bond and a labor and materials bond each at 100% of the contract value, as well as a maintenance bond of 25% up to $200,000 plus 10% on any excess. The award will be made to the lowest responsible bidder on a lowest price technically acceptable basis, with the owner retaining the right to reject any or all bids. This project is federally funded through HUD, triggering Davis-Bacon Act wage requirements for contracts over $2,000, Section 3 participation requirements for contracts over $200,000, and Buy American Act obligations for iron, steel, and other specified construction materials. All subcontractors require prior written approval, and certified weekly payrolls must be submitted under Davis-Bacon regulations. Bidders must also comply with EEO, ADA, and environmental regulations, and must submit complete electronic proposals including bid forms, subcontractor lists, insurance certificates, responsibility certifications, and bid bonds through PennBid. A fee of 0.0033% of the contract value up to $5,000 is due to PennBid upon award. Work must begin no later than April 15, 2026, and be completed by July 14, 2026. All materials must meet approved standards, substitutions require written permission, and performance will be inspected and accepted on-site based on density and mixture testing criteria. No CAGE code or AAC/TAS/ACRN information is provided, payment processes are not detailed, and no COR or COTR is listed, though oversight is assigned to HUD or its designee. Bidders must be registered with a UEI and complete all affirmative certification forms, though no socioeconomic status or Section 3 designations are claimed in the submitted documentation.
Delaware County

POSTED

1 day ago

DEADLINE

in 18 days
View Details
NAICS: 237310
New
International
2026 Territorial Drive Widening - Phase 1 & 2The 2026 Territorial Drive Widening Phase 1 & 2 Project aims to enhance traffic operations, safety, and capacity along a major corridor in the City of North Battleford, Saskatchewan. Phase 1 focuses on widening the intersection of Territorial Drive and the adjacent Service Road to increase turning radii and pavement width, improving maneuverability for all vehicles, particularly large commercial trucks, transit buses, and emergency vehicles, while also including a pavement overlay on the southbound lanes to extend their service life. Phase 2 extends the widening efforts northbound from the Carlton Trail intersection to the Airport Road intersection, adding lane width to improve traffic flow and reduce congestion on this heavily used stretch of roadway. The project is being executed in two distinct phases to ensure systematic improvements across the corridor while minimizing long-term disruption. All qualified contractors are invited to submit bids to perform the work as the Prime Contractor, with proposals due to the City Clerk's Department by August 6, 2026, either by mail or email. Questions regarding the bid documents must be submitted by August 4, 2026. The solicitation is identified by number 20260724 and was posted on July 25, 2026, with the formal closing time set for 8:30 PM on the due date. Bids must be directed to the City Clerk’s Department at 1291-101st Street, PO Box 460, North Battleford, SK S9A 2Y6, or emailed to tenders@cityofnb.ca, with the City Clerk’s Department serving as the primary point of contact for all inquiries.
City of North Battleford

POSTED

2 days ago

DEADLINE

in 11 days
View Details