Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Energy was posted on January 6, 2020. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Long?Baseline Neutrino Facility Near Site Conventional Facilities Independent Design Review

Closed
LBNF-301510-CAFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
Yucca Trail Widening Project – Palomar Avenue To La Contenta Road
Solicitation # 7074
The Town of Yucca Valley is soliciting professional civil engineering design services for the Yucca Trail Widening Project, located between Palomar/Avalon Avenue and La Contenta Road in Yucca Valley, California. The selected contractor will be responsible for creating a comprehensive Plans, Specifications, and Engineer's Estimates package, which includes street improvement, signing, striping, and streetlight plans, as well as final cost estimates and record drawings. The scope requires the consultant to evaluate the project for safety, constructability, utility conflicts, right-of-way constraints, and ADA compliance, utilizing the latest version of AutoCAD and adhering to the Standard Specifications for Public Works Construction and Town driveway standards. The agreement is for an initial term of two years, with a possible two-year extension upon mutual consent. Proposals must be submitted in two separate sealed envelopes by December 3, 2026, with the technical proposal limited to ten pages. Evaluation criteria include the service approach, company qualifications, past performance, proximity of the contractor's office, and the ability to commence work immediately. Compensation will be negotiated after the contractor is selected, and the Town aims to process undisputed monthly invoices within forty-five days. While the contractor must provide worker's compensation and indemnity insurance, it is noted that California prevailing wage laws do not apply to this specific agreement.
Town of Yucca Valley

POSTED

about 5 hours ago

DEADLINE

in about 1 month
NAICS: 541330
New
SLED
Orange County Managed Lanes Segment Advancement Study
Solicitation # C265256
The Orange County Transportation Authority is soliciting professional services for the Orange County Managed Lanes Segment Advancement Study under solicitation C265256. The primary objective of this firm-fixed price contract is to evaluate existing, planned, and potential managed lane facilities in Orange County to identify segments most ready to advance into the Project Initiation Document phase. The study is estimated to take 18 months and is divided into four key tasks: project management and coordination, segment inventory and priority selection, priority segment advancement assessment, and the delivery of a final study report with supporting technical files. Proposals are evaluated on a points-based system focusing on the work plan (30 percent), firm qualifications (25 percent), price (25 percent), and staffing and project organization (20 percent). The selected consultant must adhere to strict safety and industry standards, including Cal/OSHA and ANSI Z-87.1, and is required to maintain comprehensive insurance coverage. Administrative requirements include monthly invoicing with a 10 percent retention fee, a 30-day payment term, and the submission of weekly certified payroll where applicable. The contract emphasizes the avoidance of organizational conflicts of interest and requires compliance with California state and federal managed lanes policies.
Orange County Transportation Authority

POSTED

about 8 hours ago

DEADLINE

in about 1 month
NAICS: 541330
New
SLED
Engineering And Traffic Surveys Supporting The Town's Speed Limits To Continue Radar Enforcement
Solicitation # 27-004
The Town of Los Gatos, through its Parks and Public Works agency, is soliciting proposals for solicitation number 27-004 to conduct engineering and traffic surveys across 65 designated roadway segments and all existing school zones. The primary objective is to renew the surveys supporting prima facie speed limits to ensure continued legal radar enforcement in compliance with the California Vehicle Code and AB 382. The selected consultant, who must be a California-licensed Professional Engineer qualified in traffic engineering, will perform speed data collection on 31 high-volume segments using radar and 34 low-volume segments using 24-hour mechanical counters. The scope also requires a review of three years of accident history, field checks of each segment, and the delivery of a final engineering report in searchable PDF format containing 85th-percentile speeds and a speed-limit recommendation matrix. The contract is for a one-year term beginning in January 2027 with no option for renewal. Proposers must submit electronic bids by November 27, 2026, and will be evaluated through a two-phase process consisting of a pass/fail responsiveness check followed by a 100-point scoring system based on qualifications, work plan, price, and references. Awardees must maintain significant insurance coverage, including 2 million dollars in general liability, 1 million dollars in automobile liability, and 1 million dollars in professional liability. The agreement includes strict non-discrimination requirements with potential liquidated damages of 100 dollars per day for non-compliance and allows for termination by either party with 15 days written notice. Payment is structured as monthly invoicing with net 30-day terms.
Parks and Public Works

POSTED

about 9 hours ago

DEADLINE

in 29 days

General Info

NAICS

541330 - Engineering Services

Place of Performance

Batavia, IL, 60510, USA

Set-Aside

NONE

Documents

9

AMD+01+Exhibit+1+-+Part+1+-+LBNF+NSCF+Project+6-15-5+Conceptual+Dsgn+Sept+2018.pdf

PDF

AMD+01+Exhibit+1+-+Part+2+-+LBNF+NSCF+Project+6-15-5+Conceptual+Dsgn+Sept+2018.pdf

PDF

AMD+01+Exhibit+2+-+Annex+3B+CF+at+the+NS+LBNF+DUNE+Conceptual+Dsgn+Report+May+2015.pdf

PDF

AMD+01+Exhibit+3+-+Geotechnical+Data+Report+-+FINAL+-+AECOM+October+2013.pdf

PDF

AMD+01+Exhibit+4+-+Fermi_LBNE_GDR+05162014.pdf

PDF

AMD+01+Exhibit+5+-+FINAL+20.0155791.00+Geotechnical+Data+Rpt_Fermi+Lab+3-26-19.pdf

PDF

RFP+LBNF-301510-CA+Amendment+01+dtd+191216.pdf

PDF

RFP+LBNF-301510-CA+Amendment+02+-+191230.pdf

PDF

RFP+LBNF-301510-CA.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

2 updates
PhaseClosed
Posted

Solicitation

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Energy → Fermilab - DOE Contractor
Contacts2 people available
OfficeBatavia, IL, 60510, USA
Office AddressBatavia, IL, 60510, USA
Contacts

Full Description

Show more
****************************************************************** AMENDMENT #02 - 12/30/2019 Amendment #02 is hereby issued to provide the solicitation questions submitted and FRA responses. Please see the Attachment to this RFP for the full Amendment. ****************************************************************** AMENDMENT #01 - 12/16/2019 Amendment #01 is hereby issued to 1) provide the NSCF conceptual design for informational purposes, 2) revise the language in sub-section L1 with respect to instructions for the technical proposal, and 3) delete a sentence in sub-section L18. Please see the Attachment to this RFP for the full Amendment and Exhibits. ****************************************************************** Background and Introduction Fermi Research Alliance, LLC (FRA) will provide facilities to enable a world-class program in neutrino physics that can measure fundamental physical parameters, explore physics beyond the Standard Model, and better elucidate the nature of matter and anti-matter. The Long-Baseline Neutrino Facility (LBNF) Project will involve building a new high intensity neutrino beam at the Fermi National Accelerator Laboratory (Fermilab) aimed at the Sanford Underground Research Facility (SURF), 1,300 km away, where the Deep Underground Neutrino Experiment (DUNE) international scientific community will build a neutrino detector. The LBNF/DUNE Project will be optimized for precision measurement of neutrino oscillations with the goal of searching for charge parity-violation in the neutrino sector, as well as make other precision oscillation measurements. The LBNF/DUNE Project will construct the Near Site Conventional Facilities (NSCF) at Fermilab on the north side of Fermilab's Main Injector, in the southwest corner of the laboratory. The LBNF NSCF main construction scope includes the buildings, enclosures, and site infrastructure that will house and support the LBNF Beamline and DUNE Near Detector, including the Pre-Target beamline facilities, Target Complex, Absorber Complex, Decay Region, Near Detector Complex, and project-wide Site Work to support the facility and experiment. This construction will involve deep surface excavations, protection of existing buried structures, deep foundations, complex concrete structures including mass concrete placements, shaft construction, rock excavation and rock support, geosynthetic water barrier systems, mechanical-electrical-plumbing fitout, utilities, access roads, grading and drainage, and other site improvements. LBNF NSCF is a large, complicated underground project with a large amount of specialty concrete (over 100,000 cubic yards). The scope is dominated by the need to protect the environment from the adverse effects of radiation leading to the following requirements: the use of conventional materials in unconventional ways to construct a barrier between the conventional facilities and the groundwater; placements of massive amounts of radiation shielding concrete in a manner that minimizes cracking that would serve as paths for radiation; earthwork performed in a manner that allows for construction of a high-quality groundwater barrier and ensures its integrity. Scope of Services The fundamental purpose of the Independent Design Review (IDR), commonly known in the industry as a - Peer Review, is to review design documentation with a detailed, unbiased, analytical approach. An IDR shall occur at the completion of the NSCF preliminary and final design phases. Design documentation will include, but is not limited to, drawings, specifications, calculations, and design reports. The IDR team is composed of resources outside the project team. Areas of focus include: Quality of the design Design is sufficiently developed for the stage of the project Design documents comply with the design criteria Operational and functional objectives are met Interfaces identified and compatible Identify risks to the design The IDR team shall: Review the documents for compliance with the Project program and purpose as well as with accepted standards of professional and technical practices. The IDR is to be for objective acceptability, and not personal preferences. The IDR team shall refrain from recommending or advocating changes that are merely personal preference. Recommend modifications and revisions as appropriate for the improvement of the Project. Prepare and present a comment matrix of the IDR team's technical findings when review of the Documents is complete. Prepare and present a written report of the IDR team's findings and recommendations when review of the Documents is complete Tasks and Estimated Schedule The design will occur in two design phases, - Preliminary Design and - Final Design, each with a series of progress deliverables. An IDR shall occur at the completion of each design phase. Pricing will be Firm-Fixed Price for each Task. Task 1 Preliminary Design IDR: March-May 2020 Task 2 Final Design IDR: September-November 2021 For more details regarding deliverables and meetings, please see Attachment J-3 of the RFP. Questions Questions and inquiries are to be submitted via e?mail to Chris Allen at contact@example.gov no later than December 20, 2019.

More opportunities from Department Of Energy → Fermilab - DOE Contractor

Same awarding agency

NAICS: 332323
New
Federal
Bar Grating and Saddle Clips
Solicitation # 388000kmb
Fermi Forward Discovery Group, LLC is soliciting firm-fixed price proposals under RFP 388000kmb for the fabrication and delivery of hot-dipped galvanized carbon steel bar grating and associated saddle clips. These materials are required for the VD Cryostat Roof Decking as part of the LBNF/DUNE project. The scope includes various sizes of bar grating with bearing bars measuring 1.5 inches tall by 3/16 inches thick and 19-W-4 spacing, along with Type W44 and W10 saddle clips. Technical requirements specify a minimum live load of 100 PSF, a minimum concentrated load of 1000 LB, and a maximum deflection of 0.25 inches. Proposals must be submitted via email to Karen Berger by 5:00 PM CT on November 6, 2026. A complete submission package requires a proposal including lead times, a completed first page of the RFP, the Subcontractor Annual Representations and Certifications (SARC), and the PROC-FRM-466 Proposal Certifications. Award will be based on the Lowest Price Technically Acceptable (LPTA) selection process, with a strong emphasis on strict adherence to technical specifications and FFDG terms and conditions to avoid disqualification. Delivery is required FOB Destination to the Dakota Warehouse in Rapid City, South Dakota. All items must be bundled and packaged to comply with the Ross Shaft Load Envelopes and Shipping Expectation guidelines to ensure compatibility with warehouse handling capabilities. Post-award deliverables include a detailed logistics and shipping plan and all applicable operator manuals. The contract is subject to various federal regulations, including Buy American requirements and FAR anti-discrimination laws.
Ornamental and Architectural Metal Work Manufacturing

POSTED

6 days ago

DEADLINE

in 8 days
View Details
NAICS: 332911
New
Federal
PIP-II CM 2K Pressure Safety Device - Rupture Disks
Solicitation # 387878-DSF
Fermi Forward Discovery Group, LLC, operating the Fermi National Accelerator Laboratory (Fermilab), is soliciting firm-fixed price proposals under solicitation 387878-DSF for the procurement of thirty-three cryogenic non-reclosable rupture disk cartridges. These components are required for the Proton Improvement Plan II (PIP-II) Cryomodule relief system and must be designed for sub-atmospheric cryogenic conditions of approximately 2 K and 30 mbar absolute pressure. The requirement includes disks with set pressures of 3.1 barg and 1.75 barg, constructed from Inconel, and equipped with normally closed burst alert sensors on the outlet. All disks must be ASME Section VIII Code NB/UD stamped and meet a helium leak rate specification of 10^-8 atm-cc/sec. Proposals must be submitted via email to Seth Fryar by October 30, 2026, at 2:00 PM Central Time. Submissions must include a technical proposal demonstrating merit and five years of relevant experience, a delivery schedule, and a price proposal using the provided Exhibit F pricing sheet. Award will be granted to the lowest evaluated proposal that meets all technical and past performance acceptability standards. The contract requires strict adherence to various federal regulations, including the Buy American Act, FAR anti-discrimination laws, and DOE site access and safety requirements. Delivery is FOB Destination to Batavia, Illinois, where Fermilab will conduct visual, mechanical, and certification inspections within two weeks of receipt.
Industrial Valve Manufacturing

POSTED

6 days ago

DEADLINE

in 1 day
View Details
NAICS: 331491
Federal
PIP-II Niobium Sheets, Rings, and Disks
Solicitation # 385634-DSF
Fermi National Accelerator Laboratory (FNAL), through the Fermi Forward Discovery Group, LLC, is soliciting firm-fixed price proposals for the manufacturing, testing, certification, and delivery of high-purity Niobium and Niobium-Alloy components. These materials, which include RRR300 Niobium sheets, Nb55Ti rings and disks, and forged Niobium rings, are critical for superconducting radio-frequency cavities used in the Proton Improvement Plan II (PIP-II) project. All deliverables must adhere to strict technical specifications, including a Residual Resistivity Ratio (RRR) value greater than 300 and compliance with ASTM B-391, B-393, and E-8/E-384 standards. Materials must be delivered FOB Destination to Batavia, Illinois, with specific requirements for non-abrasive packaging and permanent product inscription for traceability. Proposals are due by November 10, 2026, and must be submitted in two separate volumes: a technical proposal and a business/price proposal. Evaluation is based on a best-value trade-off where technical merit, quality assurance plans, and past experience are significantly more important than price. Offerors must provide a minimum of three relevant examples of similar work from the past five years and a detailed project schedule. Mandatory submissions include the SARC (PROC-FRM-100) and Proposal Certifications (PROC-FRM-466) forms. The contract incorporates various Federal Acquisition Regulation (FAR) and Department of Energy Acquisition Regulation (DEAR) clauses, including strict prohibitions against racially discriminatory DEI activities under FAR 52.222-90 and compliance with the Buy American Act.
Nonferrous Metal (except Copper and Aluminum) Rolling, Drawing, and Extruding

POSTED

10 days ago

DEADLINE

in 12 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS