Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Long Lead Equipment Supply

Active

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract opportunity with Amtrak focuses on the supply of critical long-lead infrastructure components essential for the B&P Tunnel Replacement projects. The scope of work involves the manufacture and delivery of specialized hardware and equipment, specifically targeting rail components, power systems, and tunnel ventilation and safety equipment that require extensive fabrication lead times to ensure project timelines are met. The solicitation was posted on November 3, 2026, with a response deadline set for January 8, 2027. Operating under NAICS code 332510, the contract is designed to support prime contractors by securing the necessary specialized equipment required for large-scale tunnel infrastructure improvements.

General Info

Amtrak subcontract for long-lead infrastructure components for B&P Tunnel Replacement projects.

Agency

Place of Performance

MD, USA

Set-Aside

NONE

Documents

This scope was carved out of ADVANCE NOTICE -.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

ADVANCE NOTICE - BPTR: Package C

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyAmtrak
ContactsNo contacts available
OfficeN/A
Organization / AgencyAmtrak
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies critical long-lead infrastructure components for prime contractors on Amtrak B&P Tunnel Replacement projects. Manufactures and delivers specialized rail components, power systems, or tunnel ventilation and safety equipment requiring significant fabrication lead times. Delivers specialized long-lead hardware and equipment.

Similar Contracts

Same NAICS industry code

NAICS: 332510
New
DIBBS
BRACKET, ANGLE
Solicitation # SPE7L1-27-T-3365
Solicitation SPE7L1-27-T-3365, issued by the DLA Weapons Support Land Supply Chain, is a small business set-aside for the procurement of 497 angle brackets (NSN 5340-01-185-4560). The items must be manufactured according to specific technical drawings, including basic drawing 78286 SS1048 and several reference drawings. A critical constraint is that the use of additive manufacturing processes is strictly prohibited, and any offers utilizing such processes will be deemed ineligible for award. Delivery is required within 167 days after receipt of order, with the place of performance and delivery located at DLA Distribution Cherry Point, North Carolina. The contract incorporates stringent quality and security requirements, including compliance with SAE AS9003 or ISO 9001 standards for inspection systems. Packaging must adhere to MIL-STD-129 and DLA packaging requirements, with specific protocols for hazardous materials and palletization. Security mandates include the safeguarding of covered defense information and adherence to export controls under ITAR and EAR, requiring approved JCP certification for access to technical data. Evaluation will consider price, with a specific preference for HUBZone small business concerns, and requires the submission of Safety Data Sheets for any hazardous materials to ensure offeror responsibility. Invoicing and payment must be processed electronically through the Wide Area WorkFlow system.
DLA WEAPONS SUPPORT LAND SUPPLY CHAIN

POSTED

6 minutes ago

DEADLINE

in 12 days
View Details
NAICS: 332510
New
Federal
PLATE,MOUNTING
Solicitation # N0010427QNA40
Solicitation N00104-27-Q-NA40 is a fixed-price requirement issued by NAVSUP Weapon Systems Support for the manufacture of a mounting plate (NSN 1HM 5340-01-415-4666). The contract is DO certified for national defense under the Defense Priorities and Allocations System and is being pursued under Emergency Acquisition Flexibilities. Award will be granted to the responsible offeror providing the lowest aggregate total price for the total quantity, which includes an option for the government to increase the quantity within 365 days of the award. The technical requirements are stringent, requiring compliance with multiple NAVSEA drawings and military specifications. Specifically, process qualifications are required prior to the acceptance of production orders for vulcanization of chloroprene rubber, installation of vibration damping tiles, bonding with epoxy adhesives, and gap filling. The contractor must perform First Article Testing, including tensile tests on bonded structures and cured hardness verification, and maintain a quality system compliant with ISO 9001. Additionally, the supplied material must be entirely free of metallic mercury contamination. Logistics and administration are managed through the Wide Area Workflow (WAWF) system for invoicing and receiving. Shipments are destined for DLA Distribution facilities in Pennsylvania and California, with packaging and marking requirements adhering to MIL-STD-129 and MIL-STD-2073. The contract incorporates standard federal and defense clauses, including Buy American and Balance of Payments programs, and requires the contractor to provide a one-year warranty from the date of delivery.
Navsup Weapon Systems Support Mech

POSTED

about 5 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 332510
New
DIBBS
20--DOOR,METAL,MARINE STRU
Solicitation # SPE7M4-27-T-2149
Solicitation SPE7M4-27-T-2149 is a small business set-aside issued by the DLA Weapons Support Fluid Handling Division for the procurement of 19 exterior, left-hand metal marine structural doors without fixed lights, identified by NSN 2040-00-542-0201. The assembly must include specific dog assemblies, hinge assembly 143A, hasp assembly 144, inside and outside stainless steel grab handles, and a CRES label plate. All components must adhere to specified technical data packages and reference drawings, with gaskets meeting MIL-R-900 and finishes following Note 47 of drawing 803-2226372. Delivery is required within 167 days after order, with a need ship date of May 3, 2027, and final delivery to DLA Distribution San Joaquin in Tracy, California. The contract mandates strict compliance with quality and security standards, including CMMC Level 2 certification and the safeguarding of covered defense information under DFARS 252.204-7012. Technical data is subject to ITAR and EAR export controls, requiring approved JCP certification for access. Quality management must align with SAE AS9003 or ISO 9001, with origin inspection required per FAR 52.246-2. Additionally, the procurement prohibits the use of additive manufacturing and class I ozone-depleting chemicals, while restricting mercury use per NAVSEA 5100-003D. Invoicing and payment must be processed electronically through the Wide Area WorkFlow system.
DLA WEAPONS SUPPORT FLUID HANDLING DIVISION

POSTED

about 5 hours ago

DEADLINE

in 12 days
View Details
NAICS: 332510
New
Federal
PLATE,MOUNTING
Solicitation # N0010427QNA38
Solicitation N00104-27-Q-NA38 is a fixed-price requirement issued by the Navsup Weapon Systems Support Mech for the manufacture and delivery of one Mounting Plate (NSN 1HM 5340-01-415-4661). The contract is rated DO under the Defense Priorities and Allocations System and is subject to Emergency Acquisition Flexibilities. Delivery is required within 180 days on an FOB Destination basis. The government has included an option to increase the quantity 365 days after the award, and evaluation for the award will be based on the lowest aggregate total price for the total quantity, including this option. Technical compliance is critical, as the item is an assembly requiring adherence to specific NAVSEA drawings and process specifications for vulcanization, vibration damping, epoxy bonding, and gap filling. Process qualification and First Article Testing are required prior to production, including tensile tests on bonded structures and hardness testing per MIL-PRF-81733. The material must be mercury-free and meet ISO 9001 quality system requirements. Inspection and acceptance will occur at the origin. Payment will be processed electronically via the Wide Area WorkFlow system. Award will be granted to the responsible offeror submitting the lowest priced, technically acceptable offer, with risk assessments conducted via the Supplier Performance Risk System.
Navsup Weapon Systems Support Mech

POSTED

about 5 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from Amtrak

Same awarding agency

NAICS: 423860
New
Amtrak Boulden Obsolete Material Locomotive Materials for High Horse Power (HHP) Locomotives
Solicitation # 2027-026
Amtrak solicitation 2027-026 is a sale of surplus obsolete locomotive materials for High Horse Power locomotives. The materials are offered in both new and second hand conditions, with second hand items being those that have been repaired and are repairable. All materials are sold on an as is where is basis, meaning Amtrak provides no warranties regarding quality, merchantability, or fitness for a particular purpose. All sales are final with no refunds, returns, or exchanges. The award will be granted at Amtraks sole discretion to the highest responsive, responsible, and qualified bidder. Bidders must submit a firm fixed price quote using the provided bid spreadsheet, indicating the quantity and per unit price. The successful purchaser is responsible for all pick up and transportation expenses and must provide their own equipment for hauling. Material removal must be completed within 45 to 90 calendar days following the issuance of a Notice to Proceed, which is granted upon receipt of payment and evidence of insurance. Failure to remove materials within this period may result in a daily storage fee of 250 dollars. The buyer is also required to maintain the permit area free of debris and comply with DOT and FRA drug and alcohol regulations. Site visits are available by appointment with the site coordinator, Matt Vial, provided that bidders wear required personal protective equipment and schedule visits 24 hours in advance.
Transportation Equipment and Supplies (except Motor Vehicle) Merchant Wholesalers

POSTED

about 17 hours ago

DEADLINE

in 13 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS