Long-Lead Material Procurement and Supply
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The contract pertains to the procurement and supply of specialized long-lead-time components critical to the production of the CH-53K helicopter, including high-strength alloys, advanced composite materials, avionics subsystems, and propulsion system parts. These materials and components are essential for ensuring timely manufacturing timelines and operational readiness, given their extended lead times and technical complexity. The work is being conducted under a subcontract arrangement with the Naval Air Systems Command, a part of the Department of Defense, and the performance location is identified as Stratford, Connecticut, with a zip code of 06614. The contract falls under NAICS code 336412, which categorizes it within the aircraft manufacturing industry, specifically focusing on the production of military and commercial aircraft. The solicitation was posted on June 29, 2026, indicating the procurement timeline is aligned with future production schedules for the CH-53K program. Although details regarding set-asides or point of contact are not provided, the focus remains on securing mission-critical parts that require advance planning and specialized manufacturing capabilities to support sustained military aviation operations.
General Info
Place of Performance
Stratford, CT, 06614, USASet-Aside
Documents
This scope was carved out of N00019-25-RFPREQ-APM261-0513.
The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.
CH-53K® Lot 7 and 8 Care and Feeding
AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
More opportunities from Department Of Defense → Naval Air Systems Command
Same awarding agency
Earlier notices in this NAICS code
Posted before this notice, open and closed
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
