Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Department Of Defense was posted on May 21, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Long Lead Time Material (LLTM) Supply

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This contract involves the procurement and delivery of specialized materials essential for ship repair, specifically focusing on items with long manufacturing lead times. The contract is designated as a subcontract under the title "Long Lead Time Material (LLTM) Supply," issued by the Department of Defense through the Navsea Headquarters. The procurement process is governed by NAICS code 423830, which pertains to wholesale trade of durable goods. The solicitation was posted on May 21, 2026, with a response deadline set for July 21, 2026, at 7:00 PM. While no specific details about the place of performance or point of contact are provided, the contract ensures that critical materials, which require extended production periods, are delivered timely to support necessary ship repair operations. This contract plays a crucial role in maintaining naval readiness by managing the supply chain for long lead time items.

General Info

Procurement and timely delivery of specialized long lead time materials for naval ship repair.

Agency

Department Of Defense → Navsea HqView Agency

NAICS

423830 - Industrial Machinery and Equipment Merchant WholesalersView NAICS

Place of Performance

DC

Set-Aside

NONE

Documents

This scope was carved out of N0002426R4412.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

USS JOHN P MURTHA (LPD 26) FY27 Docking Selected Restricted Availability (DSRA) Request for Proposals

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navsea Hq
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Defense → Navsea Hq
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Procurement and delivery of specialized materials with long manufacturing lead times required for ship repair.

More opportunities from Department Of Defense → Navsea Hq

Same awarding agency

NAICS: 336611
New
Federal
USS MAKIN ISLAND (LHD 8) FY28 Docking Selected Restricted Availability (DSRA) Request for Proposal(s)
Solicitation # N0002426R4421
The Naval Sea Systems Command (NAVSEA) is soliciting solicitation N00024-26-R-4421 for the USS MAKIN ISLAND (LHD 8) Fiscal Year 2028 Docking Selected Restricted Availability (DSRA). This Signature Availability involves a comprehensive scope of maintenance, modernization, and repair, including hull structure work, propulsion and electric plant repairs, auxiliary system overhauls, and structural welding. The project requires a contractor with substantial West Coast facilities, specifically a capable pier and dry-dock for the LHD ship class, as well as the ability to provide a resource-loaded integrated production schedule. The government intends to make a single firm-fixed-price award in or before March 2027, with the period of performance beginning in November 2027 and concluding in October 2029. Due to the complexity and magnitude of the requirements, this procurement is not set aside for small businesses. Interested offerors must be registered in the System for Award Management (SAM) and are encouraged to possess a NAVSEA Tier 1 Master Ship Repair Agreement (MSRA) and Agreement for Boat Repair (ABR). Proposals are due by November 9, 2026, and must be submitted electronically via PIEE. For the growth CLINs, the level of effort is estimated at 103,400 labor hours and 5,576,780 dollars in materials. Access to detailed CDRLs and technical attachments must be requested through the designated Contract Specialist and Contracting Officer.
Ship Building and Repairing

POSTED

3 days ago

DEADLINE

in about 2 months
View Details
NAICS: 334511
New
Federal
AN/BYG-1 Applications
Solicitation # N0002426R6222
The Department of the Navy, through the Naval Sea Systems Command (NAVSEA), is soliciting proposals for the AN/BYG-1 Applications requirement under solicitation N00024-26-R-6222. The AN/BYG-1 serves as the U.S. Navy's Submarine Combat Control System, providing critical tools for analyzing surface, sub-surface, and airborne contacts to support command decision-making and attack control functions. The scope of this effort includes the development, testing, integration, delivery, and full-lifecycle sustainment of compiled software baselines. Key technical objectives include implementing a microcontainer/microservices architecture, decoupling applications from hardware dependencies, increasing virtualization of development environments, and integrating artificial intelligence and machine learning for tactical decision aids. Due to the sensitive nature of the work, solicitation documents are designated as Controlled Unclassified Information and are available exclusively via the Electronic Technical Information Center (E-TIC) portal. Access requires a DoD CAC or approved ECA Certificate and an active Joint Certification Program registration. While a SECRET facility clearance is sufficient for proposal preparation and access to classified software source code, the successful offeror must possess a fully adjudicated TOP SECRET facility clearance and safeguarding capability by the time of contract award. Proposals must be submitted electronically via the PIEE Solicitation Module by October 19, 2026, at 4:00 PM Eastern Daylight Time.
Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing

POSTED

4 days ago

DEADLINE

in about 1 month
View Details
NAICS: 336612
New
Federal
RFP for Multi-Mission AUTEC Range Vessel (MARV) Under N00024-26-R-2232
Solicitation # N0002426R2232
The Department of the Navy, Portfolio Acquisition Executive Maritime, is conducting a full and open competition under NAICS code 336612 to procure an existing Offshore Supply Vessel (OSV) for conversion into a Multi-Mission AUTEC Range Vessel (MARV). This commercial acquisition, managed by NAVSEA HQ, involves the detailed design, reactivation, and conversion of a vessel to support the Atlantic Undersea Test and Evaluation Center. The scope of work includes the procurement of the vessel, installation of specialized equipment such as torpedo tubes and recovery ramps, and comprehensive technical overhauls of machinery, electrical systems, and hull structures. The solicitation process has been refined through multiple amendments, with the final proposal deadline established as 1700 ET on October 12, 2026. Proposals must be submitted via the PIEE Solicitation Module and should include detailed technical and cost components, as the government intends to award the contract based on initial proposals without further negotiations. The package includes extensive technical specifications, a detailed requirements matrix, and government-furnished information consisting of engineering drawings and hydraulic schematics. Offerors are required to provide a proposed delivery schedule across six specific contract line item descriptions (CLINs) and submit past performance references for similar vessel contracts.
Boat Building

POSTED

4 days ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS