Los Angeles Groundwater Replenishment Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Los Angeles Groundwater Replenishment Project, managed by the Los Angeles Department of Water and Power, involves infrastructure modifications to increase the volume of tertiary treated wastewater and replenish the San Fernando Groundwater Basin. A key component of this effort is the installation of approximately 90 linear feet of buried 16-inch diameter stainless steel pipeline, along with new diversion structures and valves. This pipeline will link the Japanese Garden Lake outlet to the Donald C. Tillman Water Reclamation Plant intake, diverting water for groundwater recharge and reducing the average flow of recycled water to the Los Angeles River by approximately 4 million gallons per day. The installation process is expected to take about 10 active working days, occurring intermittently over a three-month period. The project is governed by the California Environmental Quality Act and requires adherence to a Mitigation Monitoring and Reporting Program. Strict operational requirements are in place, including the use of USEPA Tier 3 emission standard equipment for diesel engines over 50 horsepower and the implementation of a Stormwater Pollution Prevention Plan. Construction management must ensure all activities remain within designated project limits, with specific restrictions on fueling locations, noise hours, and truck routing to minimize community impact. Coordination with Metro and the Japanese Garden site administrator is required to manage traffic and noise, while a public liaison will be appointed to address community concerns.

General Info

LADWP will install a pipeline to replenish the San Fernando Groundwater Basin.

Agency

California Los Angeles Department of Water and Power

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Victory Boulevard, Woodley Avenue, Los Angeles, CA, 91406

Set-Aside

NONE

Documents

(2)

Final Supplemental EIR for Los Angeles Groundwater Replenishment Project Modifications

PDFenvironmental-impact-report

Japanese Garden Reuse Project - Notice of Determination

PDFdetermination-and-findings

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Los Angeles Department of Water and Power
Contacts1 person available
OfficeN/A
Organization / Agency
California Los Angeles Department of Water and Power
Office AddressN/A
Contacts
Aiden LeongEnvironmental Engineering Associate

Full Description

Show more
The modified Proposed Project consists of the installation of approximately 90 linear feet of buried 16-inch diameter stainless steel pipeline. This would link the existing outlet pipeline of the Japanese Garden Lake to the existing intake pipeline that routes wastewater to the DCTWRP headworks facility from the Additional Valley Outfall Relief Sewer. New diversion structures and valves would be installed at the outlet and on the DCTWRP wastewater intake pipeline to allow for the diversion of water from the Japanese Garden Lake to the DCTWRP, for eventual recharge to groundwater or other recycled water use consistent with the previously-approved LAGWR. The new pipeline would be buried approximately 25 feet below grade and would require excavation along its alignment. Installation of the pipeline and valves would take approximately 10 active working days to complete and would occur intermittently over a period of up to 3 months. As a result of the project modifications, there would be a decrease in flow of recycled water to the LA River. This change in the point of discharge, place of use, and purpose of use of recycled water from DCTWRP would result in an average decrease in flow of approximately 4 million gallons a day (MGD) to the LA River downstream of the Japanese Garden discharge point and is subject to the discretionary approval by the State Water Resources Control Board (SWRCB).

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Federal
Z2NZ-- 658-23-108 Correct Stormwater Drainage
Solicitation # 36C24626B0031
Solicitation 36C24626B0031 is an Invitation for Bids (IFB) issued by the Department of Veterans Affairs Network Contracting Office 6 for Project 658-23-108, which involves correcting stormwater drainage at the Salem VA Medical Center in Salem, Virginia. The project is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB), with an estimated construction magnitude between $10,000,000 and $20,000,000. The scope of work includes providing all labor, materials, and equipment for general construction and utility work, specifically the installation of a dewatering system to control ground surface water during excavation. The performance period is 450 calendar days from the issuance of the Notice to Proceed. The contract will be awarded based on FAR Part 14 Sealed Bidding procedures, typically to the lowest responsive and responsible bidder. Eligible SDVOSB bidders must be registered in the System for Award Management (SAM) and are required to perform at least 25% of the construction work. Key requirements include a bid guarantee of at least 20% of the bid price (capped at $3,000,000), adherence to Davis-Bacon wage determinations, and the ability to demonstrate the completion of three similar projects within the last three years. The final bid submission deadline was extended to October 20, 2026, with a public bid opening on October 21, 2026.
246-NETWORK Contracting Office 6 (36C246)

POSTED

about 3 hours ago

DEADLINE

in 28 days
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, involves extensive infrastructure installation for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project also requires the installation of various large-diameter valves, including contractor-furnished valves and Metropolitan-furnished 54-inch and 132-inch valves, along with 54-inch and 145.5-inch diameter tie-ins and associated fittings. Additional construction requirements include the installation of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The project encompasses electrical upgrades, instrumentation and controls, piping systems, the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation, issued by James W. Fowler Co., is open to small businesses, including SDVOSB, MBE, and WBE certified firms, with a response deadline of September 29, 2026. The prime contractor encourages M/W/DBE participation and the use of apprentices, offering assistance with bonding, insurance, and materials to qualified subcontractors.
James W. Fowler Co.

POSTED

about 10 hours ago

DEADLINE

in 6 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS