Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Lower FM-14 Bypass Force Main Replacement Project (#961)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Lower FM-14 Bypass Force Main Replacement Project (#961) is a rehabilitation effort managed by the Ross Valley Sanitary District in Greenbrae, California. The project aims to address a failed section of 18 inch diameter reinforced concrete cylinder pipe that suffered from corrosion caused by a localized high point. The scope of work includes the replacement of approximately 530 linear feet of the sanitary sewer force main using horizontal directional drilling and the installation of an air relief valve vault. This project is classified as a forecast and is located within the 94904 zip code area. According to the Notice of Exemption filed by District Engineer Philip Benedetti, the work is considered a Categorical Exemption under Class 2 for replacement or reconstruction. The project is intended to restore the integrity of the sewer infrastructure in Marin County.

General Info

Ross Valley Sanitary District replacing 530 feet of sewer force main in Greenbrae.

Agency

California → Ross Valley Sanitary District

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Sir Francis Drake Blvd and La Cuesta Dr, CA, 94904

Set-Aside

NONE

Documents

(1)

Project #961 - Lower FM-14 Bypass Force Main Replacement Notice of Exemption

PDFspecial-notice

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Ross Valley Sanitary District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Ross Valley Sanitary District
Office AddressN/A
Contacts
Philip BenedettiDistrict Engineer

Full Description

Show more
The purpose of this project is to rehabilitate a failed section of RCCP pipe that failed due to corrosion from a localized high point. The work involves replacement of ~530 LF of 18" diameter sanitary sewer force main via Horizontal Directional Drilling (HDD) in Greenbrae, CA. Installation of air relief valve vault.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, involves the installation of extensive water infrastructure for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project requires the installation of both contractor-furnished and Metropolitan-furnished valves, including 54-inch and 132-inch diameter valves and tie-ins ranging from 54 to 145.5 inches. Additional structural requirements include the construction of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The technical scope further encompasses electrical upgrades, instrumentation and controls, piping systems, and specialized civil works such as the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation, issued by James W. Fowler Co., is open to small businesses, including SBA-certified service-disabled veteran-owned small businesses, minority business enterprises, and women business enterprises. Bids and subcontractor pricing must be submitted by September 29, 2026, with all negotiations finalized 24 hours prior to the bid opening. The project encourages the use of apprentices and provides specific support for M/W/DBE subcontractors regarding bonding, insurance, and material procurement.
James W. Fowler Co.

POSTED

about 12 hours ago

DEADLINE

in 10 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS