Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Agriculture was posted on April 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

LUCERNE CAMPGROUND CONSTRUCTION PHASE 5

Awarded
1240LT26Q0026Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center in Glynco, Georgia, is a single firm fixed price construction effort focused on the comprehensive interior modernization of Building 262, with potential options for Buildings 261 and 263. The scope of work includes replacing corridor and classroom flooring with composite modular materials, fully renovating restrooms by replacing vanities and lavatories, and updating interior surfaces with new paint. Technical upgrades involve installing raised flooring and electrical distribution to support classroom needs, implementing simple dimming controls, replacing lamps, ballasts, and ceiling fans, and replacing variable air volume systems and lighting controls. The project also requires the installation of new signage and the correction of plumbing deficiencies. The period of performance is scheduled from January 11, 2027, to March 11, 2028, with a total delivery timeline of 425 calendar days after the notice to proceed. Award will be determined using a best suited negotiate methodology, evaluating price reasonableness alongside corporate relevant experience and past performance. The successful contractor must provide performance and payment bonds equal to 100 percent of the contract price and adhere to strict standards, including ADA accessibility guidelines, Buy American requirements, and Davis-Bacon wage determinations. Key deliverables include a safety plan and technical submittals due within 14 calendar days of the award.
Bristol Alliance of Companies

POSTED

28 minutes ago

DEADLINE

in 12 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The project scope is comprehensive, involving selective demolition, building envelope and roofing repairs, interior reconfiguration with new finishes, and the installation of updated HVAC, exhaust extraction, compressed air, and NFPA-compliant fire suppression systems. Additionally, the work includes replacing electrical distribution, lighting, low-voltage systems, and building automation controls, alongside site improvements such as paving, drainage upgrades, and hazardous materials abatement. The estimated contract value ranges between 10 million and 25 million dollars, with a performance period of 730 days after award. The government will evaluate offers based on the lowest price for two primary exhibit line items: building renovation and paving removal and replacement. Bidders must comply with the Buy American statute and the Davis-Bacon Act. Bonding requirements are tiered by proposal value, with projects over 150,000 dollars requiring bid, payment, and performance bonds. Technical execution requires certified specialists for protective coatings, welding, and firestopping, with strict quality control managed through a three-phase process and documented via a Contractor QC Plan. Invoicing is processed monthly through Wide Area WorkFlow with various supporting certifications and reports required for payment.
Bristol Alliance of Companies

POSTED

28 minutes ago

DEADLINE

in 26 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of an existing 548 square meter engineering facility. The solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB. Bidders are requested to provide pricing for a wide array of trades, ranging from demolition and structural steel to mechanical, electrical, and plumbing services. All work must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

29 minutes ago

DEADLINE

in about 1 month
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project follows a fire sprinkler discharge that impacted the first, second, and third floors, including dormitories, offices, and medical areas. The scope of work involves architectural repairs such as drywall replacement, painting, ceiling tile and flooring installation, electrical repairs, and vanity or cabinet replacement to restore the facility to its original condition. The total period of performance is 105 days, consisting of 90 days for substantial completion and 15 days for final completion. This is an SBA set-aside opportunity open to small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Award will be based on best value, with evaluation weights assigned to price (60), quality (20), past performance (10), and schedule (10). Prospective bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Requirements include a valid Massachusetts Contractor's License, proof of specific automobile liability insurance naming Adams and Associates, Inc. as an additional insured, and compliance with NFPA-101, ADA, OSHA, and EPA regulations. Contractors must also adhere to Davis-Bacon Act labor standards, including specific minimum wage and paid sick leave requirements.
Grafton Job Corps

POSTED

29 minutes ago

DEADLINE

in 19 days
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
Career Systems Development Corporation, operating for the U.S. Department of Labor, is soliciting proposals for the interior renovation and repair of the North Wing dormitory at the Springdale Job Corps Center in Troutdale, Oregon. The project focuses on restoring water-damaged interior spaces, including sixteen residential rooms and bathrooms, as well as common areas and mechanical rooms. Key tasks include the installation of drywall, joint finishing, and painting for approximately 300 square feet of floor area in mechanical rooms, along with the temporary removal and re-installation of HVAC equipment such as furnaces and water heaters. The objective is to return these affected areas to safe residential use. The project is subject to the Davis Bacon Act, requiring compliance with wage determination OR20260100 and the submission of weekly certified payrolls. Proposing contractors must provide itemized pricing by room and trade, a detailed work plan addressing project phasing and occupied-building protection, and evidence of relevant experience. Within ten days of award, the selected contractor must provide payment and performance bonding for the full project value, as well as proof of general liability insurance of at least 1 million dollars per occurrence. Final acceptance by CSD is contingent upon the removal of debris, successful testing of all restored mechanical and life-safety systems, and the provision of a minimum one-year workmanship warranty.
Career Systems Development Corporation

POSTED

29 minutes ago

DEADLINE

in 22 days

AI Contract Overview

Show more

This solicitation, numbered 1240LT26Q0026, is for the reconstruction of portions of the Lucerne Campground in the Flaming Gorge National Recreation Area, Utah, and is issued as a combined synopsis and solicitation under FAR Part 12 for commercial items. It is structured as a Total Small Business Set-Aside under NAICS code 236220 with a size standard of $45 million in average annual receipts, and all responsible small business concerns are eligible to submit quotations. The work includes removal of existing structures, construction of precast concrete restroom facilities (with vault toilets specifically excluded), installation of windscreen fencing, sidewalks, signage, pavement markings, irrigation systems, and related site development such as grading, asphalt trench repair, and sediment control. All construction must comply with industry standards including ASME A13.1, NFPA 70, ANSI Z535.4, UL 969, and MUTCD, and materials must be properly packaged, preserved, and labeled per specified commercial and industrial standards without reliance on military specifications. The amendment 001 updates the Statement of Work to include precast concrete restroom specifications as an attachment and revises the Statement of Items to correct discrepancies, while explicitly excluding vault toilets. It also incorporates FAR 52.222-90 in compliance with Executive Order 14398 and posts the Q&A and site visit attendance records as attachments. The response deadline has been extended to May 8, 2026, at 12:00 noon Mountain Time. The contract is evaluated on a Lowest Price Technically Acceptable basis, where technical acceptability is determined by demonstrated experience in related construction activities as detailed in Attachment 4, followed by lowest price. The base contract period runs from May 11 to November 30, 2026, with optional extensions offering additional 30-day increments for irrigation system expansions and windscreen installations. Payment will be made electronically or by mail to the designated USDA-FS address in Ogden, Utah, and all contractors must comply with numerous FAR clauses including labor standards, Equal Opportunity, Buy American, Paid Sick Leave, and Worker Protection provisions, along with the recently added whistleblower and anti-discrimination certifications. The Contracting Officer’s Representative is Lance Valentine and the Contract Specialist is Tony Taylor, both reachable via USDA email. No dollar values are disclosed in the line items, pricing is expected to be submitted

General Info

Small business contract for Lucerne Campground reconstruction excluding vault toilets, deadline May 8, 2026.

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

UT, USA

Set-Aside

SBA

Documents

14

0.+Quote+-Checklist.docx

DOCX

1.1+Solicitation+Terms+and+Conditions+Amendment+001.pdf

PDF

1.+Solicitation+Terms+and+Conditions.pdf

PDF

2.1+Statement+of+Work+Addition+Amendment+001.pdf

PDF

2.+Statement+of+Work.pdf

PDF

3.1+SOI+-+Lucerne+Amendment+001.pdf

PDF

3.+SOI+-+Lucerne.pdf

PDF

4.+Experience+Questionnaire.docx

DOCX

5.+Drawings.pdf

PDF

6.+Supplemental+Drawings+Existing+Irrigation.pdf

PDF

7.+Davis-Bacon+Act+WD+-+UT20260079.pdf

PDF

FAR+52.222-90+Amendment+001.pdf

PDF

Questions-Answers+Amendment+001.pdf

PDF

Site+Visit+Attendance+-+Amendment+001.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

3 updates
PhaseAwarded
Posted

Combined Synopsis

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Apr 20, 2026 to May 1, 2026. The notice description changed.

Notice updated

Response deadline changed from May 1, 2026 to May 8, 2026. The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Csa Intermountain 8 Usda-Fs
Contacts1 person available
OfficeOgden, UT, 844012310, USA
Office AddressOgden, UT, 844012310, USA
Contacts
Tony Taylor - Contract Specialist

Full Description

Show more

AMENDMENT 001


This amendment makes the following changes to the solicitation:


1. The SOW is updated with an addition as an attachment with precast concrete flush restroom specs. Vault toilets are not a part of this project. 


2. The SOI is updated as an attachment to correct found descrepancies.


3.  In accordance with Presidential Executive Order 14398, FAR 52.222-90 is included as an attachment and will be a  part of any resulting contract.


4. Questions and Answers are posted as an attachment.


5. Site Visit attendance is posted as an attachment.



THE RESPONSE DATE IS BEING EXTENDED TO 5/8/2026, at 12:00 noon MT.  All other Terms and Conditions remain unchanged.



--------------------------------------------------------------------------------------------------------------------------------------------------------------------


RESPONSE DATE EXTENDED.  Q&A HAS TAKEN LONGER THAN EXPECTED BUT SHOULD BE COMPLETED SOON.


NOTICE - The questions from the site visit are being compiled and answers will be posted here soon.  It is anticipated that an amendment will follow to include an extension to the response date.  Watch this solicitation for updates.


--------------------------------------------------------------------------------------------------------------------------------------------------------------------


Description


This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation; quotes are being requested, and a separate written solicitation will not be issued.


Solicitation number 1240LT26Q0026 is issued as a Request for Quotation (RFQ) for the reconstruction of portions of the Lucerne Campground.


This acquisition is set-aside for small business concerns. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov.


The applicable North American Industry Classification Standard Code is 236220 The small business size standard is $45 Million. This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency.

More opportunities from Department Of Agriculture → Csa Intermountain 8 Usda-Fs

Same awarding agency

NAICS: 327390
New
Federal
Picnic Tables & Bear Lockers with Install
Solicitation # 1240LT27Q0017
Solicitation 1240LT27Q0017 is a combined synopsis and request for quotation issued by the USDA Forest Service for the Winiger Ridge Dispersed Campsite Renovations. The project requires the purchase and installation of new picnic tables and bear boxes at existing dispersed campsites 1 through 5, located along NFSR 359.1 and 359.1A within the Boulder Ranger District of the Arapaho and Roosevelt National Forest and Pawnee National Grassland. This is a total small business set-aside under NAICS code 327390, with an estimated project magnitude between 25,000 and 100,000 dollars. The contract will be awarded as a firm fixed price to the offeror representing the best value, based on an evaluation of the technical approach and fair and reasonable pricing. The period of performance is scheduled from June 15, 2027, to August 16, 2027, with work commencing within 10 calendar days of the notice to proceed. Technical specifications for the picnic tables include concrete bases with a minimum compressive strength of 5,000 psi, #4 steel reinforcement, and a design capable of withstanding a 500 lbs/ft2 snow load. The contract is subject to the Davis-Bacon Act and Buy American requirements. Quotations must be submitted by November 24, 2026, and must include a technical approach, pricing via the provided Schedule of Items Excel spreadsheet, and a bid guarantee. Inspection and acceptance will be conducted in accordance with FAR 52.246-12.
Other Concrete Product Manufacturing

POSTED

1 day ago

DEADLINE

in 27 days
View Details
NAICS: 237120
New
Federal
Nelson Drive Fuel Tank Removal
Solicitation # 1240LT27Q0012
Solicitation 1240LT27Q0012 is a firm fixed price contract issued by the USDA Forest Service for the removal of two 300-gallon steel underground fuel storage tanks at the Nelson Drive housing complex on the Bridger-Teton National Forest in Wyoming. The scope of work includes the extraction and disposal of the tanks, the cleanup and disposal of contaminated soils, and potential surface restoration. The contractor is required to field verify all existing conditions before ordering products and must adhere to OSHA standards for excavation and shoring, as well as IDEQ and government regulations for waste hauling and disposal. The estimated period of performance is from June 1, 2027, to June 30, 2027. This project is a total small business set-aside under NAICS code 237120. Award will be made based on the lowest price technically acceptable (LPTA) criteria, evaluating technical capability through an experience questionnaire, a project-specific quality control plan, and a review of past performance. Required submissions include a technical narrative detailing the approach to tank removal and soil remediation, as well as the qualifications of key personnel. The contract mandates performance and payment bonds and compliance with the Davis-Bacon Act for wage requirements. Quotes were due by November 13, 2026, with a requirement to hold pricing firm for 90 calendar days.
Oil and Gas Pipeline and Related Structures Construction

POSTED

5 days ago

DEADLINE

in 16 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS