Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Agriculture was posted on April 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

LUCERNE CAMPGROUND CONSTRUCTION PHASE 5

Closed
1240LT26Q0026Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
BEQ- Sanitize & Paint Rooms, B4167, Multi Rooms, MASS1, Station
Solicitation # N400857607511
Solicitation N400857607511 is a task order under MACC contract N4008525D for the remediation, preparation, and painting of 22 barracks rooms and associated bathrooms at MCAS Cherry Point, North Carolina. The contractor is responsible for providing all labor, supplies, and equipment to eradicate active microbial growth using EPA-registered disinfectants and antimicrobial solutions. The scope of work includes preparing approximately 18,562 square feet of barracks room surfaces and 3,840 square feet of bathroom surfaces by removing failed paint and applying a heavy-duty, mold-and-mildew-resistant sealing primer. Final finishing requires a minimum of two coats of specialized mold/mildew-resistant paint that matches the existing color and sheen, ensuring a uniform finish without visible patching or roller marks. The project is estimated between 25,000 and 100,000 dollars, with the award based on the lowest price. All work must be completed within 60 calendar days of the award. Proposals were due by September 16, 2026, and must include a completed price proposal form and a list of subcontractors. Bonding requirements vary by proposal value, with payment bonds required for projects between 35,000 and 150,000 dollars. The contractor must comply with the Buy American Act, the Davis-Bacon Act, and FAR 28.307-2 liability insurance requirements. A qualified Quality Control Manager is required to oversee project standards, and all site cleanup must be completed to return the area to its original condition prior to final acceptance by the Contracting Officer's Representative.
Bristol Alliance of Companies

POSTED

about 12 hours ago

DEADLINE

in 5 days
NAICS: 236220
New
SLED
DB Construction for HC-130J Flight Simulator Facility at USCG Elizabeth City, NC
Solicitation # 32000479
This design-build project involves the construction of a full motion Weapons System Trainer flight simulator facility for C-130J aircraft at USCG Base Elizabeth City, North Carolina. The approximately 13,000 gross square foot facility will include a simulator bay for a Government Furnish, Government Installed mobile simulator, classrooms, administrative offices, debriefing spaces, and essential support areas for mechanical, electrical, and telecommunications systems. The scope of work extends to site development, including the installation of sidewalks and landscaping, while utilizing existing parking areas. A critical technical requirement is the integration of a Siemens Building Automation System to ensure compatibility with existing installation-wide systems. Issued under the DHS National Multiple Award Construction Contract III, Pool Two, the project has a magnitude estimate of approximately 16 million dollars and a performance period of 719 calendar days. The award is based on a best-value tradeoff selection, weighing price against non-price factors such as planning, organization, communication, and the contractor's specific experience with military or commercial flight simulators. Strict security and compliance protocols are in place, requiring all on-site personnel to be US citizens and necessitating adherence to Davis-Bacon wage determinations, Buy American requirements, and various environmental and historic preservation consultations.
Bristol Alliance of Companies

POSTED

about 12 hours ago

DEADLINE

in 13 days
NAICS: 236220
New
SLED
Upgrade Life Health Safety Systems in Hangar 250
Solicitation # N400857190530
Solicitation N400857190530, project number 7190530, involves upgrading life health safety systems within Hangar 250 at MCAS Cherry Point in Havelock, North Carolina. The scope of work encompasses architectural improvements, modifications to fire alarm and fire protection systems, and the rerouting of plumbing and electrical systems. Because the work occurs in an occupied facility, the contractor must coordinate closely with base operations and adhere to strict safety and security requirements. The project is estimated to be valued between 1,000,000 and 5,000,000 dollars, with a required completion timeframe of 380 calendar days after the award. The contract will be awarded based on the lowest price. Bidders must submit proposals by September 21, 2026, and those exceeding 150,000 dollars are required to provide bid, payment, and performance bonds. The project is subject to the Davis-Bacon Act and Buy American requirements. Key deliverables include a facility operating plan and manufacturer-provided training information. Administrative requirements include submitting invoices via Wide Area Workflow and providing a detailed schedule of prices within 15 days of the award. Quality control is heavily emphasized, requiring the Contracting Officer's acceptance of a QC plan before any construction work, other than mobilization and surveying, may begin.
Bristol Alliance of Companies

POSTED

about 12 hours ago

DEADLINE

in 7 days
NAICS: 236220
New
NJCC Bathroom Renovations for Buildings 17 & 18
Solicitation # njcc-bathroom-renovations-buildings-17-18
Education & Training Resources is soliciting bids for a fee-for-service subcontract to perform comprehensive bathroom renovations at the Northlands Job Corps Center in Vergennes, Vermont. The project encompasses the renovation of four bathroom areas in Building 17, totaling approximately 944 square feet, and five bathroom areas in Building 18, totaling approximately 1,260 square feet. The scope of work includes the demolition of existing fixtures and the installation of institutional-grade acrylic shower pans, vitreous China toilets, high-pressure laminate countertops, non-slip porcelain flooring, and LED vanity lighting. To maintain center operations, contractors must utilize a phased sequencing approach, renovating one dormitory at a time. All work must comply with ADA, OSHA, and National Electrical Code standards, and contractors are responsible for the daily off-site disposal of all debris. Bidders may submit a unified proposal for both buildings or standalone bids for each. Proposals must include a completed bid sheet with an itemized cost breakdown separating labor and materials, a detailed project schedule specifying calendar days and working hours, and proof of current Vermont state professional licensing and insurance. The award will not be based solely on the lowest bid, as ETR will evaluate technical alignment with the scope of work to minimize future change orders. Winning bidders must maintain active registration in SAM.gov and provide a Unique Entity ID. The contract incorporates various FAR clauses, including requirements for the Davis-Bacon Act, anti-lobbying certifications, and combating trafficking in persons. Payment terms are net 30 days, contingent upon the submission of a signed punch list and applicable warranties.
Northlands Job Corps Center /ETR

POSTED

about 12 hours ago

DEADLINE

in 2 days

AI Contract Overview

Show more

This solicitation, numbered 1240LT26Q0026, is for the reconstruction of portions of the Lucerne Campground in the Flaming Gorge National Recreation Area, Utah, and is issued as a combined synopsis and solicitation under FAR Part 12 for commercial items. It is structured as a Total Small Business Set-Aside under NAICS code 236220 with a size standard of $45 million in average annual receipts, and all responsible small business concerns are eligible to submit quotations. The work includes removal of existing structures, construction of precast concrete restroom facilities (with vault toilets specifically excluded), installation of windscreen fencing, sidewalks, signage, pavement markings, irrigation systems, and related site development such as grading, asphalt trench repair, and sediment control. All construction must comply with industry standards including ASME A13.1, NFPA 70, ANSI Z535.4, UL 969, and MUTCD, and materials must be properly packaged, preserved, and labeled per specified commercial and industrial standards without reliance on military specifications. The amendment 001 updates the Statement of Work to include precast concrete restroom specifications as an attachment and revises the Statement of Items to correct discrepancies, while explicitly excluding vault toilets. It also incorporates FAR 52.222-90 in compliance with Executive Order 14398 and posts the Q&A and site visit attendance records as attachments. The response deadline has been extended to May 8, 2026, at 12:00 noon Mountain Time. The contract is evaluated on a Lowest Price Technically Acceptable basis, where technical acceptability is determined by demonstrated experience in related construction activities as detailed in Attachment 4, followed by lowest price. The base contract period runs from May 11 to November 30, 2026, with optional extensions offering additional 30-day increments for irrigation system expansions and windscreen installations. Payment will be made electronically or by mail to the designated USDA-FS address in Ogden, Utah, and all contractors must comply with numerous FAR clauses including labor standards, Equal Opportunity, Buy American, Paid Sick Leave, and Worker Protection provisions, along with the recently added whistleblower and anti-discrimination certifications. The Contracting Officer’s Representative is Lance Valentine and the Contract Specialist is Tony Taylor, both reachable via USDA email. No dollar values are disclosed in the line items, pricing is expected to be submitted

General Info

Small business contract for Lucerne Campground reconstruction excluding vault toilets, deadline May 8, 2026.

Agency

Department Of Agriculture → Csa Intermountain 8 Usda-FsView Agency

NAICS

236220 - Commercial and Institutional Building ConstructionView NAICS

Place of Performance

UT, USA

Set-Aside

SBA

Documents

(14)

3.1+SOI+-+Lucerne+Amendment+001.pdf

PDF

FAR+52.222-90+Amendment+001.pdf

PDF

4.+Experience+Questionnaire.docx

DOCX

7.+Davis-Bacon+Act+WD+-+UT20260079.pdf

PDF

3.+SOI+-+Lucerne.pdf

PDF

6.+Supplemental+Drawings+Existing+Irrigation.pdf

PDF

2.+Statement+of+Work.pdf

PDF

0.+Quote+-Checklist.docx

DOCX

5.+Drawings.pdf

PDF

1.1+Solicitation+Terms+and+Conditions+Amendment+001.pdf

PDF

Site+Visit+Attendance+-+Amendment+001.pdf

PDF

2.1+Statement+of+Work+Addition+Amendment+001.pdf

PDF

Questions-Answers+Amendment+001.pdf

PDF

1.+Solicitation+Terms+and+Conditions.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

3 updates
PhaseClosed
Posted

Combined Synopsis

Amendment 1

Contract was updated

Amendment 2

Contract was updated

Amendment 3

Contract was updated

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Csa Intermountain 8 Usda-Fs
Contacts1 person available
OfficeOgden, UT, 844012310, USA
Organization / Agency
Department Of Agriculture → Csa Intermountain 8 Usda-Fs
View Agency Profile
Office AddressOgden, UT, 844012310, USA
Contacts
Tony Taylor - Contract Specialist

Full Description

Show more

AMENDMENT 001


This amendment makes the following changes to the solicitation:


1. The SOW is updated with an addition as an attachment with precast concrete flush restroom specs. Vault toilets are not a part of this project. 


2. The SOI is updated as an attachment to correct found descrepancies.


3.  In accordance with Presidential Executive Order 14398, FAR 52.222-90 is included as an attachment and will be a  part of any resulting contract.


4. Questions and Answers are posted as an attachment.


5. Site Visit attendance is posted as an attachment.



THE RESPONSE DATE IS BEING EXTENDED TO 5/8/2026, at 12:00 noon MT.  All other Terms and Conditions remain unchanged.



--------------------------------------------------------------------------------------------------------------------------------------------------------------------


RESPONSE DATE EXTENDED.  Q&A HAS TAKEN LONGER THAN EXPECTED BUT SHOULD BE COMPLETED SOON.


NOTICE - The questions from the site visit are being compiled and answers will be posted here soon.  It is anticipated that an amendment will follow to include an extension to the response date.  Watch this solicitation for updates.


--------------------------------------------------------------------------------------------------------------------------------------------------------------------


Description


This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation; quotes are being requested, and a separate written solicitation will not be issued.


Solicitation number 1240LT26Q0026 is issued as a Request for Quotation (RFQ) for the reconstruction of portions of the Lucerne Campground.


This acquisition is set-aside for small business concerns. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov.


The applicable North American Industry Classification Standard Code is 236220 The small business size standard is $45 Million. This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency.

More opportunities from Department Of Agriculture → Csa Intermountain 8 Usda-Fs

Same awarding agency

NAICS: 237110
New
Federal
GAOA Palisades Lagoon Liner & Sprinkler System Replacement, Coronado National Forest
Solicitation # 1240LT26Q0094
Solicitation 1240LT26Q0094 is a total Small Business set-aside for the Palisades Lagoon Liner and Effluent Sprinkler System Replacement project at the Coronado National Forest in Pima County, Arizona. The project involves the maintenance and upgrade of the wastewater treatment system at the Palisades Administrative Complex, specifically requiring the replacement of the existing lagoon liner with a double geomembrane system, the installation of a new effluent sprinkler system, and the reconstruction of approximately 660 linear feet of access road. To ensure uninterrupted wastewater services during construction, the contractor must provide a temporary above-ground wastewater conveyance system and manage the disposal of existing liners and effluent sludge. The estimated contract value ranges between 500,000 and 1,000,000 dollars, with a performance period from October 1, 2026, to December 1, 2026. The acquisition is governed by FAR Part 12 and NAICS code 237110. Award will be based on best value, evaluating technical approach, project management, performance schedules, specialized experience, and past performance. A bid guarantee of 20 percent is required for quotes exceeding 150,000 dollars. Contractors must comply with the Davis-Bacon Act for wage determinations and provide a written quality control plan for approval by the Contracting Officer's Representative before work begins. Final acceptance is contingent upon the system being tested under operating conditions. All invoicing must be processed electronically via the Department of Treasury's Invoice Processing Platform.
Water and Sewer Line and Related Structures Construction

POSTED

3 days ago

DEADLINE

in 6 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS