Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Massachusetts was posted on July 22, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

M783-C1, CONLEY ADMINISTRATION BUILDING ENVELOPE REPAIRS, SOUTH BOSTON, MA

Closed
BD-19-1411-CAPPR-LOC1-131545State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238160
New
OJCA Gym Roof Core Sampling
Solicitation # ojca-gym-roof-core-sampling
Education Training & Resources LLC is soliciting bids for roof core sampling services at the Oneonta Job Corps Academy in New York. The project involves conducting moisture assessments and core sampling on two specific areas: a flat roof installed in 1994 and a hip area installed in 2003. The primary objective is to determine moisture levels in the existing insulation to evaluate if the roof is suitable for a coating over the existing membrane. Key deliverables include the removal and temporary waterproof patching of roof sections, photo documentation of strata, and comprehensive laboratory analysis of the findings. The solicitation is open to various small business set-asides, including SBA certified, women-owned, HUBZone, and veteran-owned businesses. Bids are due by 12:00pm on September 16, 2026. Award decisions will be based on the best overall value rather than the lowest price, with evaluation factors including pricing, technical approach, and New York State licensing. Required submissions include a completed bid sheet, a detailed cost breakdown, a W-9, and a vendor acknowledgement form. The winning contractor must maintain an active Sam.gov registration and a Unique Entity ID. Compliance requirements are stringent, mandating adherence to OSHA regulations, the National Electrical Code, NFPA Standard No. 101, and the Davis-Bacon Act. Depending on the final project value, performance and payment bonds may be required, specifically for projects exceeding 35,000 dollars. Final payment is contingent upon the submission of a signed punch list and applicable warranties. All inquiries and submissions are managed by Purchasing Agent Katie Curran.
Education Training & Resources LLC

POSTED

about 9 hours ago

DEADLINE

in 3 days
NAICS: 238160
New
International
Columbine Community Centre - Roof Renewal Works, Walton On The Naze
Solicitation # FWTC-COL-ROOF-2026
Frinton & Walton Town Council is seeking tenders for the design, supply, and installation of a roof over-cladding or renewal solution at The Columbine Community Centre in Walton-on-the-Naze. The project, valued between 150,000 and 200,000 GBP excluding VAT, includes the installation of a replacement roofing system with minimum 0.7mm profiled steel sheeting and 260mm fibreglass insulation to meet Building Regulations Part L. A critical component of the scope is the full conversion of existing internal concealed rainwater goods to a new external gutter and downpipe system. The works are estimated to take place from December 17, 2026, to January 30, 2027, and must be executed while maintaining safe public access to the occupied building. The contract is reserved for UK suppliers, with a particular suitability for small and medium-sized enterprises. Participation requires a mandatory site visit and current health and safety accreditation such as CHAS, SafeContractor, or Constructionline. Award criteria are weighted at 50% for price, 25% for technical quality, 10% for the programme, 10% for health and safety compliance, and 5% for experience. Successful bidders must provide comprehensive insurance coverage, including 10 million GBP for public, products, and employers' liability. Payment terms include monthly interim applications paid within 30 days, with a 5% retention held, half of which is released at practical completion and the remainder after a 12-month defects liability period. Tenders are due by November 6, 2026, at 12:00 pm.
Frinton & Walton Town Council

POSTED

about 22 hours ago

DEADLINE

in about 2 months
NAICS: 238160
New
SLED
PBXP262018 FFY26 MANSFIELD ROOF REPAIRS
Solicitation # SRC0000041803
The State of Ohio Adjutant General's Department is soliciting quotes for roof repairs to Building 104 (Breezeway) at the Mansfield Lahm ANG Base in Ohio under solicitation number SRC000041803. The scope of work involves removing existing materials, sealing abandoned penetrations, and installing a new roof assembly consisting of polyiso insulation, a tapered drainage system, and a fully adhered PVC roofing membrane with associated flashing and metal work. All installed equipment must be U.S. manufactured, and the contractor must provide a one-year warranty for the work. A site visit is scheduled for September 17, 2026, at 10:00 A.M., with Mr. Joe Logan serving as the point of contact. The contract will be awarded to the lowest responsive and responsible bidder who provides an itemized quote, a total price via the OhioBuys portal, and a signed Bidder Certification. Bidders must also provide an Acord Certificate or Certificate of Liability Insurance with Endorsements and Stop Gap coverage. Performance requirements include strict adherence to the Occupational Safety and Health Act of 1972 and the maintenance of a clean job site to protect aircraft and surrounding facilities. Payments are issued via electronic funds transfer within 30 calendar days of receiving a proper invoice. All submissions must be completed through the OhioBuys portal by the response deadline of September 28, 2026.
Adj334200 Mansfield - Foma Srm Adjmab

POSTED

about 22 hours ago

DEADLINE

in 16 days
NAICS: 238160
New
Federal
USDA-ARS Mississippi Roofing Repairs - Multi Locations
Solicitation # 12445126B0042
Solicitation 12445126B0042 is an Invitation for Bid for two roofing projects in Mississippi, issued as a total small business set-aside under NAICS code 238160. The government intends to award firm-fixed-price contracts to the lowest responsive and responsible bidder who can complete the work within 90 days of the notice to proceed. The performance period is scheduled from September 28, 2026, to December 31, 2026. The scope of work is divided into two packages. Package 1174723 involves the preparation and application of a GAF Roof Coating System on buildings 27, 29A, 35, and 36 at the USDA ARS MS State facility in Starkville, including partial roof replacement for building 29A. Package 1174574 requires the supply and installation of 53 roof vent boots and VentSaver kits at the ARS National Biological Control Laboratory Building 80 in Stoneville to repair ice-related damage. Key requirements include a bid guarantee for individual or combined packages and performance and payment bonds totaling 100% of the award price, due 10 days after the award. Contractors must submit a site-specific safety plan within seven days of the award and adhere to Davis-Bacon Act wage standards. Bids must be submitted electronically by September 18, 2026, and include a signed SF1442, completed Schedule B forms for both packages, and a scanned bid guarantee.
Csa East 11 Usda-Fs

POSTED

1 day ago

DEADLINE

in 6 days

AI Contract Overview

Show more

The contract pertains to a full roof replacement and associated envelope repairs for the Conley Administration Building located at 700 Summer Street in South Boston, Massachusetts, with an estimated contract value of $4,772,100. The procurement is managed by the Massachusetts Port Authority’s CAPPROG - Capital Programs office, and all bids must be submitted electronically via the Bid Express portal by August 26, 2026, with sub-bids due by August 12, 2026. A pre-bid conference is mandatory and scheduled for July 29, 2026. The project requires comprehensive work across multiple trades including roofing, masonry, HVAC, electrical, plumbing, painting, and metal window restoration, with strict adherence to Massachusetts General Laws Chapter 149 governing public bidding, prevailing wage rates, and labor standards. Contractors must furnish a 5% bid deposit and 100% performance and payment bonds, along with $1,000,000 in combined single limit general liability insurance, naming the Massachusetts Port Authority as an additional insured. A 7.2% minimum participation goal for Minority/Women Owned Business Enterprises is enforced, and all subcontractors performing work over $10,000 must submit certificates of eligibility and certifications confirming non-segregated facilities. Compliance with Title VI of the Civil Rights Act, the Americans with Disabilities Act, Section 504, and FAA Title VI requirements is mandatory, including submission of a Title VI Program Plan and the FAA Pre-Grant Award Checklist. The contracting office is located at One Harborside Drive in Boston, though the actual work site is the Conley Administration Building in South Boston. No formal CLINs, SLINs, or ELINs are listed; instead, estimated sub-trade values are provided as a breakdown of the total project cost. The contract type is inferred as firm fixed price, with no options, extensions, or IDIQ elements identified. Performance inspection and acceptance will occur on-site, and all documentation must comply with state and federal civil rights and labor regulations without reliance on standard FAR clause numbering.

General Info

Full roof and envelope replacement for Conley Administration Building in Boston, bid due August 26, 2026.

Agency

Massachusetts → CAPPROG - Capital ProgramsView Agency

NAICS

238160 - Roofing ContractorsView NAICS

Place of Performance

Luciana Burdi One Harborside Drive Boston, MA, 02128, USA

Set-Aside

NONE

Documents

(30)

BD-19-1411-CAPPR-LOC1-131545 Bid Solicitation

HTML3 pagesifb

MPA Contract No. M783-C1 Conley Admin Building Envelope Repairs - Notice to Contractors

PDF3 pagespresolicitation

BD-19-1411-CAPPR-LOC1-131545 Bid Solicitation - Conley Administration Building Envelope Repairs

HTML3 pagesrfb

BD-19-1411-CAPPR-LOC1-131545 Bid Solicitation

HTML3 pagesbid-solicitation

BD-19-1411-CAPPR-LOC1-131545 Bid Solicitation

HTMLrfb

BD-19-1411-CAPPR-LOC1-131545 Bid Solicitation

HTML3 pagesifb

BD-19-1411-CAPPR-LOC1-131545 Bid Solicitation

HTML3 pagesrfq

BD-19-1411-CAPPR-LOC1-131545 Bid Solicitation

HTML3 pagesifb

BD-19-1411-CAPPR-LOC1-131545 Bid Solicitation

HTML3 pagesifb

BD-19-1411-CAPPR-LOC1-131545 Bid Solicitation

HTML3 pagesrfb

BD-19-1411-CAPPR-LOC1-131545 Bid Solicitation

HTML3 pagesrfb

BD-19-1411-CAPPR-LOC1-131545 Bid Solicitation

HTML3 pagesifb

BD-19-1411-CAPPR-LOC1-131545 Bid Solicitation

HTML3 pagesifb

commbuys-source-page-BD-19-1411-CAPPR-LOC1-131545

HTML1 pageother

BD-19-1411-CAPPR-LOC1-131545 Bid Solicitation

HTMLifb

BD-19-1411-CAPPR-LOC1-131545 Bid Solicitation

HTML3 pagesifb

BD-19-1411-CAPPR-LOC1-131545 Bid Solicitation

HTML3 pagesrfb

BD-19-1411-CAPPR-LOC1-131545: Conley Administration Building Envelope Repairs

HTML3 pagesrfq

BD-19-1411-CAPPR-LOC1-131545: Conley Administration Building Envelope Repairs

HTML3 pagesifb

BD-19-1411-CAPPR-LOC1-131545 Bid Solicitation

HTML3 pagesifb

BD-19-1411-CAPPR-LOC1-131545 Bid Solicitation

HTML3 pagesrfb

BD-19-1411-CAPPR-LOC1-131545 Bid Solicitation - Conley Administration Building Repairs

HTML3 pagesrfb

BD-19-1411-CAPPR-LOC1-131545 Bid Solicitation

HTML3 pagesifb

Bid Solicitation BD-19-1411-CAPPR-LOC1-131545

HTML3 pagesrfq

BD-19-1411-CAPPR-LOC1-131545 Bid Solicitation

HTML3 pagesifb

Bid Solicitation BD-19-1411-CAPPR-LOC1-131545

HTML3 pagesifb

BD-19-1411-CAPPR-LOC1-131545 Bid Solicitation

HTML3 pagesifb

BD-19-1411-CAPPR-LOC1-131545 Bid Solicitation

HTML3 pagesrfb

BD-19-1411-CAPPR-LOC1-131545 Bid Solicitation

HTML3 pagesifb

BD-19-1411-CAPPR-LOC1-131545 Bid Solicitation - Conley Administration Building Repairs

HTML3 pagesifb

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMassachusetts → CAPPROG - Capital Programs
Contacts1 person available
OfficeLuciana Burdi One Harborside Drive Boston, MA, 02128, USA
Organization / Agency
Massachusetts → CAPPROG - Capital Programs
View Agency Profile
Office AddressLuciana Burdi One Harborside Drive Boston, MA, 02128, USA
Contacts
Samantha BakerPurchaser

Full Description

Show more
FULL ROOF REPLACEMENT AND OTHER ENVELOPE RELATED REPAIRS TO EXISTING ADMINISTRATION BUILDING

More opportunities from Massachusetts → CAPPROG - Capital Programs

Same awarding agency

NAICS: 237990
New
SLED
W328 Trade RFQ WORCESTER REGIONAL AIRPORT MODERNIZATION.
Solicitation # BD-19-1411-CAPPR-LOC1-133200
The Massachusetts Port Authority is seeking Statement of Qualifications from trade contractors for the W328 Worcester Regional Airport Modernization project. This initiative involves the construction of terminal buildings and parking garages with an estimated trade contractor value of 3,522,000 dollars and a projected construction duration of 36 months. The Authority is prequalifying contractors across multiple disciplines, including roofing, electrical, HVAC, masonry, painting, fire protection, plumbing, and other specialty trades. The selection process follows a two-step procedure in accordance with MGL Chapter 149A. In the first step, a Prequalification Committee will evaluate submissions based on management experience, project references including public project records, and the financial stability and long-term viability of the contractor. Only those who successfully pass this qualifications-based evaluation will be invited to participate in the second step, which is the formal bidding process. Interested parties must submit their qualifications via Bid Express by 12:00 PM local time on October 8, 2026. All responses should be addressed to Chief Infrastructure Officer Luciana Burdi. Proponents are strictly prohibited from contacting Massport personnel regarding the project outside of the designated email channel, CPBQuestions@massport.com, from the time of solicitation until the project is awarded.
Other Heavy and Civil Engineering Construction

POSTED

3 days ago

DEADLINE

in 26 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS