Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

MACA MACA Upgrade Sign and Parking area at Green River, Cedar Sink, Chaumont

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Department of the Interior is forecasting a project to upgrade the sign and parking areas at Green River, Cedar Sink, and Chaumont. The scope of work involves replacing the entrance sign with a design consistent with the Sand Cave and Park City entrances, as well as converting existing dirt walkways to concrete. This process will include necessary grading to remove old materials, establishing contours for sidewalk installation, and placing eight inches of base material. This opportunity is designated as a Total Small Business Set-Aside under NAICS code 339950. The project was posted on October 2, 2025, and is managed by the National Park Service, with Barclay Trimble serving as the primary point of contact.

General Info

Interior Department project upgrading signs and parking areas via small business set-aside.

Agency

Department of the InteriorView Agency

NAICS

339950 - Sign ManufacturingView NAICS

Place of Performance

KY, USA

Set-Aside

SBA

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment of the Interior
Contacts2 people available
OfficeN/A
Organization / Agency
Department of the Interior
View Agency Profile
Office AddressN/A
Contacts
Barclay Trimble
Contract Support Center

Full Description

Show more
This project entails improvements and upgrades to the entrance sign, walkways, and parking at the location. Specific elements of work include: --Replacing the entrance sign with a sign that is similar to the existing sign at the Sand Cave and Park City Entrances, and -- Upgrading the existing dirt walkways from dirt to concrete and --Grading needed to remove any existing material and establish contours for installation of the sidewalks, --Placement of 8 inches of base material

Similar Contracts

Same NAICS industry code

NAICS: 339950
New
Federal
Fort Eustis, VA Bldg. 950 (FCC) Signage Conversion Project
Solicitation # W911S026QA008
The Department of Defense, through W6QM Micc-Fdo Ft Eustis, is soliciting non-personal services for the Fort Eustis, VA Bldg. 950 (FCC) Signage Conversion Project under solicitation number W911S026QA008. The scope of work involves the fabrication and installation of backlit channel lettering and logos on the canopy fascia of Building 950, as well as the refurbishment of five existing monument signs to a like-new condition. Key technical requirements include the use of ACM backer panels, electrical integration adhering to the National Electrical Code and UL 48 standards, and masonry repair and painting that meets U.S. Army branding standards. The project requires the contractor to provide all personnel, equipment, and supervision, with a strict requirement for complete site cleanup and the removal of all debris upon completion. The response deadline is August 21, 2026. Awardees must provide key personnel, including a Project Manager, Site Supervisor, Quality Control Manager, Safety Supervisor, and Lead Electrician, and submit a detailed Work Plan and Quality Control Plan shortly after the contract start date. Due to the location at Fort Eustis, contractors must comply with rigorous security protocols, including Installation Access Control System (IACS) compliance, background checks, and the submission of an Initial Installation Pass Log. All contractor vehicles must be prominently branded with the company name, and personnel must wear identifiable badges. Performance will be monitored via a Performance Requirements Summary, and final acceptance is determined by the Contracting Officer based on the quality of the installation and surface restoration.
W6QM Micc-Fdo Ft Eustis

POSTED

3 days ago

DEADLINE

in about 21 hours
View Details

More opportunities from Department of the Interior

Same awarding agency