Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on July 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Main St. Parking Lot Resurfacing & Restriping

Closed
20260728032State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes site preparation activities such as land surveying, site clearing, subsurface investigation, and shoring; pipeline and utility installation involving tunneling, boring, jacking, and cathodic protection; and surface improvements including asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting. Required materials and services also encompass ready mix supply, precast concrete, and the implementation of storm water pollution prevention measures. This solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. Responsive bidders must possess a valid California Contractor's license, provide acceptable insurance, and be capable of providing bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Bidders are encouraged to demonstrate an ability to maintain labor harmony, noting that Kiewit is a signatory to several collective bargaining agreements. Quotes must be submitted via the Building Connected system by the deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 3 hours ago

DEADLINE

in 21 days
NAICS: 237310
New
SLED
Environmental Trust Department, Owhi Flats 2026
Solicitation # Owhi-Flats-RFB-2026.pdf
The Confederated Tribes of the Colville Reservation Environmental Trust Department is soliciting bids for the Owhi Flats 2026 watershed restoration project located within the Little Nespelem RMU. This firm-fixed-price construction contract involves decommissioning six road segments totaling 17,393 feet and installing two tank traps to improve water quality, enhance riparian habitat, and reduce road density impacts on wildlife. The scope of work includes decompacting road surfaces, applying straw mulch and woody debris, removing all non-natural materials such as culverts for approved disposal, and seeding surfaces back to natural vegetation. All work must adhere to Best Management Practices and specific Tribal Law and Order Codes regarding forest practices, water quality, hydraulic practices, fire management, and industrial safety. Selection will be awarded to the lowest responsive and responsible bidder who demonstrates specific experience in road decommissioning, stream crossings, and bank stabilization. Bidders must provide proof of at least 1,000,000 dollars in liability insurance and submit a complete bid packet including a work plan, equipment list, and Sams.gov registration. This solicitation is subject to Indian Preference and Tribal Employment Rights Ordinance (TERO) regulations, requiring a minimum of 51 percent of seasonal or temporary employees to be of Indian preference. Additionally, a 5 percent employment rights fee applies to contracts of 5,000 dollars or more. Sealed proposals must be received by 2 P.M. on October 29, 2026.
Confederated Tribes of the Colville Reservation

POSTED

about 8 hours ago

DEADLINE

in about 22 hours
NAICS: 237310
New
SLED
Silverbell Road Roadway Improvements - El Camino del Cerro to Goret Road
Solicitation # 270146
The Silverbell Road Roadway Improvements project, solicitation number 270146, is a major infrastructure initiative by the City of Tucson's Department of Transportation and Mobility. The project involves the reconstruction and widening of 3.27 miles of roadway, specifically 2.63 miles of Silverbell Road from 0.25 miles north of El Camino Del Cerro to 0.2 miles north of Goret Road, 0.50 mile of El Camino Del Cerro, and 0.14 mile of Sweetwater Drive. The scope of work includes the construction of four roadway lanes with medians, curbs, sidewalks, a multi-use path, traffic signals, street lighting, landscaping, irrigation, drainage facilities, and extensive utility work. The estimated price range for the project exceeds 10 million dollars. The contract is divided into two primary phases: a 730-calendar day construction phase and a subsequent 730-calendar day landscape establishment period. Bids are evaluated based on responsiveness and responsibility, with the award granted to the lowest responsive and responsible bidder. Key requirements include a bid security of 10 percent of the total offer and a 5 percent Small Business Enterprise participation goal. The project must adhere to various standards, including the 2015 Pima Association of Governments specifications and HUD guidelines for federally funded programs. Additionally, contractors must comply with stringent data protection and cybersecurity frameworks, ADA requirements, and environmental restrictions regarding herbicide use in protected washes.
Transportation & Mobility

POSTED

about 9 hours ago

DEADLINE

in 23 days
NAICS: 237310
New
SLED
Transit Area Asphalt Resurfacing
Solicitation # 26-044
The Transit Area Asphalt Resurfacing project, solicitation number 26-044, is a municipal construction contract for the City of Turlock, California, with an engineer's estimate of 233,000.00 dollars. The scope of work involves the cold milling and removal of a two-inch asphalt concrete layer, scarifying the native subgrade to 95 percent relative compaction, and applying a new asphalt concrete overlay across approximately 28,400 square feet of pavement at an active Transit Corporation Yard. The project concludes with the installation of permanent thermoplastic striping for bus parking stalls, which must be performed seven calendar days after paving to allow for proper curing. Due to the facility's role in daily CNG bus fueling, the project is subject to strict operational constraints, requiring work to be phased within tight weekend-only windows. The contract will be awarded to the lowest responsive and responsible bidder possessing either a Class A General Engineering or Class C-12 Earthwork and Paving contractor license. Required securities include bid and indemnity bonds of at least 10 percent of the bid amount, and performance and payment bonds equal to 100 percent of the contract price. All work must adhere to California prevailing wage rates for Stanislaus County and City of Turlock Standard Specifications. Performance is tightly scheduled, with substantial completion required within ten days of the Notice to Proceed.
Municipal Services-Engineering

POSTED

about 10 hours ago

DEADLINE

in 7 days
NAICS: 237310
New
SLED
Pedestrian Crossing Safety Improvements (FHWA)
Solicitation # 2025-041
The Pedestrian Crossing Safety Improvements project, solicitation number 2025-041, is a public works contract issued by the Seattle Department of Transportation with an estimated value between 3,250,000 and 3,350,000 dollars. The scope of work involves comprehensive infrastructure and safety enhancements across multiple locations in Washington, including 15th Ave S and Lander St, 33rd Ave S and Myrtle Pl, and several intersections along Rainier Ave S and Beacon Ave S. Key deliverables include the removal and restoration of sidewalks and pavement, installation of pedestrian islands, curbs, curb ramps, drainage structures, and the implementation of RRFB and traffic signals, signing, and channelization. The project also specifically includes electrical and rebar installation. The contract must be physically completed within 120 working days from the Notice to Proceed. Award will be granted to the lowest responsive bidder who meets mandatory and supplemental responsibility criteria, with a tie-breaker preference for the highest use of recycled materials. Compliance requirements are extensive, including a 13 percent Federal Small Business Enterprise goal, adherence to Buy America mandates, and compliance with Federal and State prevailing wage rates. Bidders must provide a bid guaranty of five percent of the total bid and are required to be registered with the federal System for Award Management. Submissions are primarily handled through the OpenGov portal, and the project adheres to the Americans with Disabilities Act and various City of Seattle and APWA general standard provisions.
Public Works

POSTED

about 11 hours ago

DEADLINE

in 8 days

AI Contract Overview

Show more

The City of Santa Ana is soliciting bids for the resurfacing and restriping of three parking lots along Main Street under Bid #25-7526, with a response deadline of August 7, 2026. The project requires a two-inch mill and overlay across all three sites, followed by restriping in alignment with detailed plans. Certain areas will need full removal and replacement of existing asphalt and subgrade, along with grinding work and curb replacement to ensure structural integrity. Additional scope includes constructing a new decomposed granite island, placing boulders, and performing general landscaping enhancements. Lighting upgrades are available as optional additive alternates, allowing bidders to propose supplemental costs for those enhancements if desired. The solicitation is classified under NAICS code 237310 and is issued by the California state and local government agency. All work must be performed in Santa Ana, California, with the designated zip code 92701 as the place of performance. The project is publicly advertised through BidAmerica with solicitation number 20260728032 and was posted on July 29, 2026. The contracting authority is the City of Santa Ana, and while no specific point of contact is listed, bid submissions must comply with the outlined technical and temporal requirements. There is no set-aside designation provided, meaning the opportunity is open to all eligible contractors. Proposals must address the full scope of work, including potential additive items for lighting, and align with the project specifications provided in the bid package.

General Info

Santa Ana resurfaces three Main Street parking lots with mill-overlay, restriping, curb replacement, and landscaping by August 7, 2026.

Place of Performance

Santa Ana, CA, 92701, USA

Set-Aside

NONE

Documents

3

25-7526 Main St Construction and Electrical Notes

PDF, High priority: read this firstspecifications
High

CA Santa Ana Main Street Parking Solar 4 Bid Luminaire and Equipment Specifications

PDF, High priority: read this firstrfb
High

Project 25-7526 Main St. Parking Lot Resurfacing & Restriping Contract Documents

PDF, High priority: read this firstcontract-document
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Santa Ana
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Bid #25-7526: This project involves the resurfacing and restriping of three parking lots located along Main Street. The primary scope includes a 2-inch mill and overlay at each site, followed by restriping according to the provided plans. Specific areas will require complete removal and replacement of asphalt and subgrade, as well as grinding and curb replacement. Additionally, the project entails the construction of a new decomposed granite island, placement of boulders, and general landscaping. Lighting improvements at the three parking lots are offered as additive alternate bid items.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS