Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Manhole and Utility Valve Adjustment

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract opportunity involves the adjustment of existing utility structures for prime contractors working on street improvement projects within the City of Hermosa Beach, California. The scope of work specifically requires the adjustment of approximately 41 manhole frames and covers, as well as 145 utility valves and pull boxes, to ensure they are flush with new pavement grades and asphalt surfaces. The project is categorized under NAICS code 238910 and is located in Hermosa Beach, zip code 90254. Interested parties must submit their responses by the deadline of December 9, 2026.

General Info

Place of Performance

Hermosa Beach, CA, 90254, USA

Set-Aside

NONE

Documents

This scope was carved out of BID 26-005.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

CIP 106 Annual Street Improvements Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Hermosa Beach
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Adjusts existing utility structures for prime contractors on City of Hermosa Beach street improvement projects. Adjusts approximately 41 manhole frames and covers and 145 utility valves and pull boxes to match new pavement grades. Delivers utility covers flush with the new asphalt surface.

Similar Contracts

Same NAICS industry code

NAICS: 238910
New
SLED
Livermore Village Infrastructure Project, Lightwell Stair Replacement
Solicitation # DR583018
The City of Livermore is soliciting bids for the L Street Parking Garage Lightwell Stair Replacement project, identified as solicitation DR583018. The scope of work involves the demolition of existing concrete lightwell stairs and the installation of a new steel stair assembly featuring precast concrete treads, handrails, and associated structural framing. The project requires the contractor to provide all necessary concrete formwork, reinforcing steel, and metal fabrication, ensuring that the final assembly complies with the 2010 ADA Standards for Accessible Design and governing building codes. Because the parking garage will remain fully operational during construction, the contractor must implement careful scheduling and temporary traffic control systems. The contract is awarded based on a low-bid selection process, requiring a signed and sealed bid proposal accompanied by a bid schedule and a bid security deposit equal to ten percent of the maximum bid amount. Technical requirements include shop drawings and calculations signed by a California-registered Civil Engineer, with structural designs adhering to AISC, AWS D1.1, and ASCE 7 seismic standards. The contractor is responsible for all temporary utilities, site access, and environmental controls. Performance is monitored by the City and its Engineer, with progress payments processed within 30 days of certification. Required security for the awarded contract includes payment, performance, and warranty bonds.
City of Livermore

POSTED

about 5 hours ago

DEADLINE

in 20 days
View Details

More opportunities from California → City of Hermosa Beach

Same awarding agency

NAICS: 237310
New
SLED
CIP 106 Annual Street Improvements Project
Solicitation # BID 26-005
The CIP 106 Annual Street Improvements Project, solicitation BID 26-005, is a public works contract issued by the City of Hermosa Beach, California. The project focuses on comprehensive street infrastructure upgrades on Loma Drive, Sunset Drive, Cypress Avenue, and 8th Street. The scope of work includes AC cold milling of 460,000 square feet, the installation of 6,500 tons of asphalt rubber hot mix overlay, and full-depth dig-outs. Additionally, the contractor will perform concrete removal and reconstruction for ADA-compliant curb ramps, sidewalks, and gutters, as well as the installation of traffic striping, inductive loop detectors, and safety signaling equipment such as rectangular rapid flashing beacons and pedestrian push buttons. The contract will be awarded to the lowest responsive and responsible bidder based on the total bid price. Bids are due by 2:00 PM on December 9, 2026, and must include a bid bond of at least 10% of the total price. The successful contractor must provide performance and payment bonds equal to 100% of the contract price and adhere to Los Angeles County prevailing wage rates. All work must be completed within 75 working days from the Notice to Proceed, with project management coordinated through Procore software. Final acceptance is contingent upon the submission of record drawings and the repair of any construction-related road damage.
Highway, Street, and Bridge Construction

POSTED

about 7 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
SLED
CIP No. 106 Annual Street Improvements Project
Solicitation # 20261103020
The City of Hermosa Beach is soliciting bids for the CIP No. 106 Annual Street Improvements Project, a public works effort located in Hermosa Beach, California. The project involves comprehensive street improvements, including AC cold milling of 460,000 square feet, the construction of 6,500 tons of ARHM-GG-C overlay, and the adjustment of 186 manhole frames, utility valves, and pull boxes. Additional scope includes concrete hardscape work, ADA ramp installation, and surface sealing in accordance with ASTM D7100 standards. The engineer's cost estimate for the project is 3,500,000 dollars, and the contract will be awarded to the lowest responsive and responsible bidder based on the total bid price. The project must be completed within 75 working days from the issuance of the Notice to Proceed, with a detailed project schedule due within 14 days of that notice. Bidders are required to submit sealed bids by 2:00pm on December 9, 2026, including a bid bond of at least 10 percent of the total bid price. The successful contractor must provide performance and payment bonds equal to 100 percent of the contract price and adhere to Los Angeles County prevailing wage rates. Compliance with the 2021 Standard Specifications for Public Works Construction and ADA regulations is mandatory. Progress payments are processed monthly, with a 30-day turnaround following the receipt of undisputed requests and lien releases.
Highway, Street, and Bridge Construction

POSTED

about 8 hours ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS