This Solicitation opportunity from Tennessee was posted on March 26, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Manhole Rehabilitation
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves the comprehensive reconstruction and rehabilitation of existing manholes, including manhole benches and inverts, utilizing approved non-disruptive methods to restore the structures while maintaining their original shape. The scope requires the contractor to supply all necessary labor, materials, and equipment to perform these operations at designated locations, which will be identified by the Engineering Manager or their designee. Authorization for each specific sub-project will be issued by the City of Chattanooga as needed, ensuring a phased approach to the work. The project is managed by the City of Chattanooga, Tennessee, with a contract value estimated between two and five million dollars. The solicitation was posted on March 26, 2025, with a deadline for responses set for April 3, 2025. The primary point of contact is Debbie J Talley, who can be reached via email. The work falls under NAICS code 236220, indicating a construction-related service, and the contract is part of a larger effort to maintain and improve underground infrastructure within the city.
General Info
Place of Performance
TN, USASet-Aside
Documents
4AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- Building 262 Renovations FLETC GlyncoOpen now, due in 16 days
- Repair Auto Maintenance Bldg 575Open now, due in 7 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Submission Closed
Organization & Contact Information
Full Description
The Scope of Services included in these Specifications includes requirements for furnishing all labor, material, and equipment to provide for the reconstruction of existing manholes, manhole benches and inverts using an approved method of non-disruptive rehabilitation within an existing structure, which has generally maintained its original shape. The locations will be determined by the Engineering Manager or designee and authorization for each Sub-Project shall be released to the Vendor at a time decided by the City of Chattanooga.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
