Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on April 23, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Manufactured Home Communities(MHC's) Wastewater System Improvements Project Package 2 (PID 005015A) ARPA

Closed
24-0420-ITB-CState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 221320
New
Federal
Y--GRCA 257282 - Replace Wastewater Plant at South Ri
Solicitation # 140P2026R0101
Solicitation 140P2026R0101 is an unrestricted full and open competition Invitation for Bid issued by the National Park Service, DSC Contracting Services Division, for the replacement of the South Rim Wastewater Treatment Plant at Grand Canyon National Park, Arizona. The project involves the construction of a GD Membrane Bio-Reactor wastewater treatment plant, including new treatment facilities, administrative and support buildings, and process systems. The scope of work encompasses complete demolition and removal of existing infrastructure, site preparation, grading, paving, fencing, and improvements to the facility access road. A critical requirement is that the existing plant must remain in permitted operation until the new facility is accepted by the government, and the contractor must provide a 12-month operational support period. The contract is a firm-fixed-price acquisition with a magnitude exceeding 100 million dollars. The mandatory period of performance is 1095 calendar days, scheduled from February 1, 2027, to February 1, 2030. Award will be based on a multi-factor, best-value tradeoff process evaluating technical experience, technical approach, key personnel experience, and price. Required deliverables include a detailed commissioning plan covering startup sequencing, operator training, and regulatory coordination. The contractor must furnish performance and payment bonds and comply with union prevailing wage rates, Department of the Interior cybersecurity requirements, and ADA/ABA accessibility standards.
Dsc Contracting Services Division

POSTED

1 day ago

DEADLINE

in 20 days
NAICS: 221320
New
SLED
RFB-758-2700000186-1 | Water and Wastewater Operations, Maintenance, Monitoring
Solicitation # RFB-758-2700000186-1
Solicitation RFB-758-2700000186-1 is a request for bids issued by the Kentucky Department of Military Affairs to secure a contractor for comprehensive water and wastewater operations, maintenance, monitoring, and repair services at Bluegrass Station. The scope of work encompasses the wastewater treatment and collection systems, the stormwater system, and the drinking water distribution system. The selected contractor will be responsible for providing all management, labor, equipment, and administrative support, including specialized electrical services for pumps and motors, laboratory coordination, and emergency response. The contract is structured with an initial one-year term and includes the option for four additional two-year extensions. The award will be determined using a Best Value Ranking Approach, where price accounts for 90 points and business experience accounts for 10 points, with a minimum requirement of three years in business. Bidders must provide documentation of their business history and hold current Kentucky Class II certifications for both Wastewater Operator and Collection System Operator roles. Mandatory requirements include minimum insurance coverage of 1,000,000 dollars for both automobile and professional liability, compliance with the Equal Employment Opportunity Act of 1978, and adherence to Section 504 of the Rehabilitation Act of 1973. All bids must be submitted electronically via the Vendor Self Service portal by November 16, 2026.
Department of Military Affairs

POSTED

1 day ago

DEADLINE

in 18 days
NAICS: 221320
Federal
Operations and Maintenance (O&M) Services for the SBIWTP
Solicitation # 191BWC26R0009
Solicitation 191BWC26R0009, issued by the International Boundary and Water Commission, seeks a contractor to provide Firm Fixed Price Operations and Maintenance (O&M) services for the South Bay International Wastewater Treatment Plant (SBIWTP) in San Ysidro, California. The contract is structured with a base year running from June 1, 2027, to May 31, 2028, and multiple option years extending through May 2031. A primary objective of the scope is managing plant operations, SCADA systems, and maintenance during the facility's expansion from 25 MGD to 50 MGD. The contractor must ensure 24/7 staffing, including a bilingual operator, and maintain strict compliance with the National Pollutant Discharge Elimination System (NPDES) permit and other regional water quality board regulations. Award will be based on the Highest Technically Rated with a Fair and Reasonable Price method, where non-price factors—such as plant operations, permit compliance, and staffing—are significantly more important than cost. Key requirements include the designation of a Project Manager, Superintendent, Site Safety and Health Officer, SCADA Specialist, and Asset Manager. The contractor is responsible for a wide array of deliverables, including a Phase-In Plan, Preventative Maintenance Plan, and monthly performance reports. Security is a high priority, requiring background investigations for personnel and adherence to NIST standards for protecting Controlled Unclassified Information. Performance will be monitored via a Quality Assurance Surveillance Plan focusing on regulatory compliance, uptime, and effluent quality.
Internat Boundary And Water Commission

POSTED

9 days ago

DEADLINE

in 2 months

AI Contract Overview

Show more

This project involves upgrading and replacing outdated wastewater systems across fourteen Manufactured Home Communities (MHCs) to enhance environmental resilience and public health. The scope for Package 2 specifically includes decommissioning and constructing new wastewater collection systems at Lake Seminole Estates, with additional optional work contingent upon available grant funding to similarly upgrade four other MHCs: Oasis Home Owners, Midway AM/CAN Home Owners, Grosse Pointe Co-Op, and Four Seasons Estates ROC. Funded by the U.S. Department of the Treasury and the Florida Department of Environmental Protection through grants, the project aims for substantial completion by June 30, 2026. The upgrades are designed to mitigate issues caused by climate change, such as flooding and sea level rise, by eliminating leaks, illegal connections, and stormwater inflows, thereby improving water quality and protecting coastal and marine ecosystems. The contract is managed by Pinellas Utilities in Florida, with a response deadline of May 9, 2024, and is overseen by Michelle Jurek, who can be contacted via email or phone for further details.

General Info

Agency

Florida → Pinellas Utilities

Place of Performance

FL, USA

Set-Aside

NONE

Documents

26

005015A Manufactured Home Communities Wastewater Collection System Improvements

PDF, High priority: read this first1 page · itb
High

24-0420-ITB-C: Manufactured Home Communities Wastewater System Improvements Project Package 2

PDF, High priority: read this first83 pages · itb
High

Agreement 24-0420: MHC Wastewater System Improvements Project Package 3

PDF, High priority: read this first5 pages · contract-document
High

ITB-C #24-0420-ITB-C Pricing Proposal - MHC Wastewater System Improvements

PDF, High priority: read this first13 pages · itb
High

Performance and Payment Bonds for Pinellas County, Florida

PDF, High priority: read this first6 pages · bond
High

P.I.D. 005015A - Appendix 1 Permits

PDF, High priority: read this first3 pages · specifications
High

PID 005015A - Four Seasons Estates Technical Specifications

PDF, High priority: read this first41 pages · specifications
High

PID 005015A - Four Seasons Estates Wastewater Collection System Improvements 100% Plans

PDF, High priority: read this first20 pages · specifications
High

PID 005015A - Grosse Pointe Estates Technical Specifications

PDF, High priority: read this first39 pages · specifications
High

PID 005015A - Grosse Pointe Estates Wastewater Collection System Improvements Plans

PDF, High priority: read this first17 pages · specifications
High

PID 005015A - Lake Seminole Estates Technical Specifications

PDF, High priority: read this first37 pages · specifications
High

PID 005015A - Lake Seminole Estates Wastewater Collection System Improvements Plans

PDF, High priority: read this first20 pages · specifications
High

PID 005015A - Oasis Mobile Home Park Wastewater Collection System Improvements 100% Plans

PDF, High priority: read this firstspecifications
High

PID 005015A - RESTORE Act Wastewater Collection System Improvements (Midway)

PDF, High priority: read this firstspecifications
High

PID 005015A - Restore Act Wastewater Collection System Improvements Midway AM/CAN 100% Plans

PDF, High priority: read this firstspecifications
High

P.I.D. No. 005015A - Manufactured Home Communities Wastewater System Improvements Special Notices

PDF, High priority: read this first27 pages · special-notice
High

PID No. 005015A - Oasis Park Wastewater Collection System Improvements Tech Specs

PDF, High priority: read this firstspecifications
High

Pinellas County Vendor Submittal Acknowledgment Form

PDF, High priority: read this first3 pages · vendor-submittal-form
High

Qualification Submittal Form for Non-FDOT Prequalified Contractors

PDF, High priority: read this first8 pages · qualification-submittal-form
High

Sample Application for Payment - Pinellas County

PDF, High priority: read this first1 page · application-for-payment
High

Sample Change Order Pinellas County

PDF, High priority: read this first1 page · change-order
High

Section 01 35 10 - Asset Onboarding

PDF, High priority: read this first4 pages · specifications
High

Bid No: 24-0420-ITB-C - Affidavit of Release and Guarantee

PDF, Low priority1 page · other
Low

E-Verify Affidavit for Contractor Compliance

PDF, Low priority1 page · affidavit
Low

Florida Trench Safety Act Certification and Disclosure Statement

PDF, Low priority2 pages · certification-disclosure
Low

SBE Compliance Form for Pinellas County Contract

PDF, Low priority1 page · sbe-compliance-form
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Pinellas Utilities
Contacts1 person available
OfficeN/A
Organization / Agency
Florida → Pinellas Utilities
Office AddressN/A

Full Description

Show more
The purpose of this project is to provide upgrades to outdated and problematic wastewater systems within fourteen (14) Manufactured Home Communities (MHCs). Specifically within Package 2, work includes the decommissioning, replacement, and construction of the existing MHC wastewater collection system, namely Lake Seminole Resort South Residence, Inc. (also known as (a.k.a.) Lake Seminole Estates). Additionally, there are four (4) additives which are labeled as optional work that is conditional based on availability of additional grant funds is the is the decommissioning, replacement, and construction of four (4) MHC’s wastewater collection system, namely Oasis Home Owners, Inc., Midway AM/CAN Home Owners, Inc., Grosse Pointe Co-Op, Inc., and Four Seasons Estates Resident Owned Community (ROC), Inc. The construction of this project is funded by the United States (U.S.) Department of the Treasury Award SLFRP4653 and the Florida Department of Environmental Protection’s (FDEP) Resilient Florida Grant No. 22FRP09; therefore substantial completion has a deadline of June 30, 2026.Project benefits include, but are not limited to, mitigating the adverse impacts from wetter climate conditions, flooding, and sea level rise by improving critical wastewater infrastructure to reduce sanitary sewer overflows. Overall replacement of the wastewater collection systems within these communities would eliminate leaking pipes, leaking manholes, and illegal connections from storm and roof drains. This would result in a contribution to higher water quality in the area and nearby water bodies, a contribution to the protection of living coastal and marine resources and their environments, and a more resilient wastewater collection system in an environmentally vulnerable area. 

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS