Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Manufacturer of Hot Food/Hot Soup Well Hardware

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of Defense → SUBSISTENCE FSE SUPPLY CHAINView Agency

NAICS

333241 - Food Product Machinery ManufacturingView NAICS

Place of Performance

FPO, AP, 96616, US

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → SUBSISTENCE FSE SUPPLY CHAIN
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Defense → SUBSISTENCE FSE SUPPLY CHAIN
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Design, manufacture, and supply of a single unit of military-spec hardware (NSN: 7310014964525) for hot food and soup service on naval vessels.

Similar Contracts

Same NAICS industry code

NAICS: 333241
New
DIBBS
SPRAY NOZZLE ASSYThe contract specifies the procurement of a single spray nozzle assembly identified by NSN 7320-01-528-6822 and part number SK-2670, with a required delivery within 20 days of contract award under solicitation SPE3SE-26-T-1052. All items must comply with the DLA Master List of Technical and Quality Requirements, which override any other standards such as ASTM D3951, and adherence to MIL-STD-129 for labeling and packaging is mandatory. Packaging must conform to RP001 DLA packaging standards, and palletization is required as specified. Mercury and mercury-containing compounds are strictly prohibited in the hardware unless explicitly exempted for approved functional uses such as batteries, specific instruments, or weapon systems, with additional containment requirements for portable devices. The manufacturer must provide the serial number of the machine used to ensure correct part supply. Delivery is FOB destination, with no variance allowed in quantity, and inspection and acceptance occur upon arrival at the specified location: USS ESSEX LHD 2, FPO AP 96643. Shipment must be made via traceable transportation methods, excluding parcel post, and must reference RDD 777 with VSM for tracking. The government’s freight shipping address and project code EE5 TP 2 are provided for logistics coordination, and the item must be delivered no later than July 24, 2026. The contract mandates strict compliance with defense information handling protocols under RD003 and prohibits the inclusion of any unapproved hazardous materials. All documentation and labeling must reflect the correct unit of issue and quantity per unit pack as defined in the order.
SUBSISTENCE FSE SUPPLY CHAIN

POSTED

1 day ago

DEADLINE

in 3 days
View Details
NAICS: 333241
New
DIBBS
LEFT HAND DOOR PLATThis contract pertains to the procurement of a left-hand door plate with part number 51081 and NSN 7310-01-583-1320, requiring the delivery of one unit under solicitation SPE3SE-26-T-1055. The item must be delivered FOB destination within 20 days of contract award, with no tolerance for variance in quantity, and is subject to final inspection and acceptance at the delivery point. All packaging and labeling must comply with ASTM D3951 and MIL-STD-129, prioritizing the DLA Master List of Technical and Quality Requirements over other standards, and palletization must adhere to DLA’s packaging guidelines. The item must not contain mercury or mercury-compound materials unless specifically exempted for functional uses such as batteries, fluorescent lights, or certain instruments, with portable mercury-containing devices requiring shockproof construction and secondary containment per NAVSEA 5100-003D. The delivery address is FPO AP 96673 aboard the USS NEW ORLEANS LPD 18, with shipping instructions referencing DLAD PROC NOTE C19 and C20. The contract mandates compliance with Defense Logistics Agency procurement protocols, including use of authorized units of issue and vendor systems like VSM. The required delivery date is July 27, 2026, with no specified need ship date, and the procurement is administered by the Department of Defense under NAICS code 333241, with primary contact Khuong Nguyen.
SUBSISTENCE FSE SUPPLY CHAIN

POSTED

1 day ago

DEADLINE

in 3 days
View Details
NAICS: 333241
New
DIBBS
TOASTER, ELECTRICThe contract specifies the procurement of two electric conveyor toasters model TQ-400 manufactured by HATCO Corp with CAGE code 20087, designated by NSN 7310-01-560-4677. The toasters must meet strict technical standards including a nominal toasting capacity of 360 slices per hour, operate on 120 volts AC at 60 Hz, and conform to the DLA Master List of Technical and Quality Requirements referenced by R and I numbers. Dimensions are fixed at 14.5 inches wide, 14.875 inches high, and 17.75 inches deep, with electric heating elements and continuous duty cycle compliance. Mercury and mercury-containing compounds are strictly prohibited except for specific exempted applications such as batteries, fluorescent lights, sensors, or instrument controls, and any portable devices containing mercury must include shock-proof construction with a secondary containment barrier per NAVSEA 5100-003D. All supplies must be packaged in accordance with ASTM D3951, labeled as per MIL-STD-129, and palletized following DLA packaging requirements. The toasters are to be delivered FOB destination within 20 days of contract award with zero quantity variance and inspected at the destination. Delivery is directed to COMNAVAIRLANT in Norfolk, Virginia, under RDD 777 with shipment required via the fastest traceable method, excluding parcel post. No unit of issue or price details are provided beyond the two units ordered, and the required delivery date is July 27, 2026. Government use identifiers and contact details for Joseph Pineiro at DLA are included for administrative purposes.
SUBSISTENCE FSE SUPPLY CHAIN

POSTED

1 day ago

DEADLINE

in 3 days
View Details
NAICS: 333241
New
DIBBS
REFRIGERATOR, MECHANICAThe contract is for a single mechanical food refrigerator unit identified by NSN 4110-01-366-9648, manufactured by COSPOLICH REFRIGERATOR CO with model number UCR20-2M-SN-MLR, operating on 115V AC, 60 Hz, single phase, and using R404A refrigerant. The unit must comply with strict environmental regulations prohibiting ozone-depleting substances as defined under Section 602(A) of the Clean Air Act; only EPA-approved refrigerant substitutes such as HCFC-22 or R-134A are acceptable. Mercury and mercury-containing compounds are strictly prohibited from intentional addition or direct contact with the equipment, except for limited functional uses in batteries, fluorescent lights, sensors, controls, weapon systems, or specific chemical reagents authorized by NAVSEA, with portable devices containing mercury requiring shock-proof construction and secondary containment per NAVSEA 5100-003D. Technical and quality requirements are governed by the DLA Master List of Technical and Quality Requirements, with the applicable revision determined by the solicitation or award date. The solicitation number is SPE3SE-26-T-1057, issued on July 23, 2026, with responses due by July 27, 2026, and delivery is required within 20 days after award. The point of contact is Madelyn Kane from the Department of Defense’s Subsistence FSE Supply Chain, and the place of performance is Norfolk, Virginia, with the procurement classified under NAICS code 333241.
SUBSISTENCE FSE SUPPLY CHAIN

POSTED

1 day ago

DEADLINE

in 3 days
View Details
NAICS: 333241
New
DIBBS
REFRIGERATOR-FREEZEThe contract specifies the procurement of ten refrigerator-freezer units identified by NSN 4110015424286 and part number RA305SST-1 from Avanti Products Inc, CAGE 6F215, under solicitation SPE3SE-26-T-1054. All units must comply with DLA packaging requirements and meet technical and quality standards referenced in the DLA Master List of Technical and Quality Requirements. Refrigerants are strictly limited to R134A and R404A for shipboard food service applications; R290A is prohibited due to its flammability. Mercury and mercury-containing compounds are banned from direct contact with the equipment except for specific functional uses in batteries, lights, sensors, and authorized instruments, with portable devices requiring shock-proof design and secondary containment per NAVSEA 5100-003D. Packaging must follow MIL-STD-2073-1E and marking must adhere to MIL-STD-129, with palletization controlled by DLA packaging standards. Delivery is FOB destination with zero quantity variance allowed, inspection and acceptance occurring at the delivery point. Units are scheduled for delivery within five days of invoice, with two separate delivery points: one to USNS ALAN SHEPARD at FPO AP 96678 by July 21, 2026, and another to Aberdeen Proving Ground, Maryland by July 23, 2026. For the latter, shipment must use traceable freight methods and cannot be sent via parcel post. The contract mandates compliance with defense information protection requirements, and all supplies must be free of government identification prior to delivery if rejected.
SUBSISTENCE FSE SUPPLY CHAIN

POSTED

1 day ago

DEADLINE

in 3 days
View Details
NAICS: 333241
New
DIBBS
ICE MAKING MACHINE, CUBThe contract is for a single cube ice making machine with an integrated bin, designated by NSN 4110-01-408-1745, to be delivered within 20 days of award. The unit must produce 400 pounds of ice per day and store 369 pounds, with physical dimensions of 30 inches wide, 64.5 inches high, and 31.5 inches deep. It operates on 115 volts AC, 60 hertz, single phase, and utilizes R404A refrigerant, which is the only approved refrigerant for shipboard food service equipment; R290A is expressly prohibited due to its flammability. The machine is configured as a navy shipboard unit, requiring a marine leveler and eight marine legs to meet environmental and safety standards. Mercury and mercury-containing compounds are strictly forbidden from intentional addition or direct contact with the equipment, except for specific exempted components such as batteries, fluorescent lights, sensors, or controls, which must contain a secondary boundary of containment as per NAVSEA 5100-003D. All technical and quality requirements are governed by the DLA Master List of Technical and Quality Requirements referenced in RP001 and RA001, with revisions controlled by the solicitation issue date. The solicitation number is SPE3SE-26-T-1059, posted on July 23, 2026, with responses due by July 27, 2026, under NAICS code 333241, and performance is to be delivered to FPO, 96694-1500. Primary point of contact is Madelyn Kane at DLA, reachable via email and phone provided.
SUBSISTENCE FSE SUPPLY CHAIN

POSTED

1 day ago

DEADLINE

in 3 days
View Details
NAICS: 333241
New
DIBBS
TOASTER, ELECTRICThe contract specifies the procurement of one electric toaster with part number CTS1000 and NSN 7310016287230 under solicitation SPE3SE-26-T-1048, issued by the Department of Defense’s Subsistence FSE Supply Chain. Delivery is required within 20 days to a military address at USS Tripoli LHA 7, FPO AP 96694-2900, with delivery terms FOB destination and no variance allowed in quantity. The item must comply with DLA’s Master List of Technical and Quality Requirements, which override all other standards including ASTM D3951, and must be packaged and labeled per MIL-STD-129 with palletization adhering to RP001. Mercury or mercury-containing compounds are strictly prohibited in or on the product except for limited exceptions such as functional batteries or specified instruments, and any portable fluorescent lamps must be shockproof with a secondary containment barrier in accordance with NAVSEA 5100-003D. Inspection and acceptance occur at the destination, and all packaging must reflect the specified unit of issue and quantity per unit pack. The contract also incorporates Covered Defense Information requirements and mandates compliance with DLA’s transportation and shipping procedures, including references to DLAD PROC NOTES C19 and C20. The point of contact is Khuong Nguyen, and the response deadline for the solicitation is July 27, 2026, with an original required delivery date of July 20, 2026.
SUBSISTENCE FSE SUPPLY CHAIN

POSTED

2 days ago

DEADLINE

in 3 days
View Details

More opportunities from Department Of Defense → SUBSISTENCE FSE SUPPLY CHAIN

Same awarding agency

NAICS: 423740
New
DIBBS
CHEST, ICE STORAGEThe contract specifies the procurement of 79 units of a chest-style ice storage unit identified by NSN 4110-01-579-0984 and part number YT45 CAGE 5REC4 RP001, with overall dimensions of 25.5 inches in length, 15.5 inches in height, and 15.5 inches in width. Each unit features roto-molded construction from compounded UV-stabilized polyethylene plastic, two inches of polyurethane foam insulation, a freezer-style gasket, heavy-duty T-latches, a lockable lid, molded-in self-stopping hinges, and is constructed from food-grade materials compatible with dry ice, finished in tan color and sized at 45 quarts. The supplier is NAUTIC-SPORT, INC. under part number ORCT040. All items must comply with DLA’s packaging requirements specified in RP001 and MIL-STD-2073-1E, with marking in accordance with MIL-STD-129 and no special markings required. The contract mandates firm fixed pricing with zero variance in quantity, destination delivery FOB, and inspection and acceptance at the point of delivery. Delivery is required within 30 days after award date, with the shipment directed to DLA Distribution Red River Receiving in Texarkana, Texas. The procurement falls under simplified acquisition procedures, and technical and quality requirements referenced from the DLA Master List control the contract’s compliance obligations. The contract data indicates a posted date of July 23, 2026, with a response deadline of July 28, 2026, and the government’s material need date is January 21, 2027.
Refrigeration Equipment and Supplies Merchant Wholesalers

POSTED

1 day ago

DEADLINE

in 4 days
View Details