Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on September 26, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Marine Construction - West Bulkhead Replacement at the Cape Cod Canal East Boat Basin in Sandwich, MA

Closed
W912WJ24B0013Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
CP25014
Solicitation # CP25014
Solicitation CP25014 is a unit price contract issued by the Port of Lake Charles (Lake Charles Harbor & Terminal District) for the Industrial Park East Rail Extension and Trans-loading Yard project located in Calcasieu Parish, Louisiana. The scope of work requires the contractor to provide all labor, materials, equipment, and supplies necessary to complete the project according to best industry practices and contract specifications. Key deliverables include mobilization, clearing and grubbing of 10 acres, drainage excavation, structural fill embankment, lime treatment of 37,000 square yards, and the installation of 602 linear feet of barbed wire fencing and double swinging driveway gates. The contract will be awarded to the lowest qualified bidder who complies with all requirements. Bidders must submit proposals by November 19, 2026, using the Louisiana Uniform Public Work Bid Form, ensuring every requested item has a unit price. The successful bidder must provide performance and payment bonds from an approved or A-rated Louisiana domiciled insurance company. Project administration includes a bi-monthly schedule update requirement and a retainage policy of 10 percent for contracts up to 500,000 dollars and 5 percent for those exceeding that amount. Compliance with the Clean Air Act, Federal Water Pollution Control Act, and Equal Opportunity clauses is required, with specific attention to FEMA assistance for subcontracts exceeding 150,000 dollars. Inspection and acceptance are managed by the Department, utilizing DOTD standards for earthwork and the International Roughness Index for concrete pavement.
Port of Lake Charles

POSTED

about 4 hours ago

DEADLINE

in 21 days

AI Contract Overview

Show more

This contract pertains to a marine construction project focused on the replacement of the west bulkhead at the East Boat Basin of the Cape Cod Canal in Sandwich, Massachusetts. Managed by the U.S. Army Corps of Engineers, New England District, the project is designated under solicitation number W912WJ24B0013 and is posted on September 23, 2024, with a response deadline of September 25, 2024. The scope involves significant structural work to upgrade or replace the existing bulkhead to ensure continued maritime safety and operational efficiency in the area. The contract is part of a broader set of ongoing amendments and clarifications related to similar military and infrastructure projects, including maintenance facilities and marine air group headquarters, indicating a comprehensive effort to address technical specifications, procurement details, and project timelines. The project emphasizes adherence to detailed technical specifications, including requirements for steel sheet piles, concrete pavement, and other structural components, with multiple amendments issued to clarify bidding procedures, update drawings, and extend proposal deadlines. The contract also involves procurement of electrical connectors with specified attributes such as high current capacity and compliance with safety standards. Overall, the contract reflects a well-coordinated effort to ensure precise execution of marine construction activities, with clear communication channels established for technical inquiries and project updates, underscoring the importance of compliance with detailed specifications and timely submission of proposals.

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

MA

Set-Aside

NONE

Documents

26

Amendment 0003 to Solicitation W912WJ24B0013

PDF, High priority: read this first3 pages · amendment
High

Amendment 0008 to Solicitation W912WJ24B0013

PDF, High priority: read this first2 pages · amendment
High

Amendment 0010 to Solicitation W912WJ24B0013

PDF, High priority: read this first3 pages · amendment
High

Drawing CD102 - Revised

PDF, High priority: read this first1 page · specifications
High

Drawing CD102 - Revision 2

PDF, High priority: read this first1 page · specifications
High

Drawing CD102 - Revision 3 (Cape Cod Canal)

PDF, High priority: read this firstspecifications
High

Drawing S-0001 - Revised

PDF, High priority: read this firstspecifications
High

Drawing S-402 - Existing Bulkhead Elevation and Demolition

PDF, High priority: read this firstspecifications
High

Drawing S-404 - Revised

PDF, High priority: read this firstspecifications
High

Drawing S-501 - Anchors and Sheeting

PDF, High priority: read this firstspecifications
High

S-404 New Bulkhead Elevations - West Bulkhead Replacement

PDF, High priority: read this first1 page · specifications
High

Section 31 23 00 - Excavation and Fill (East Boat Basin, Cape Cod Canal)

PDF, High priority: read this firstspecifications
High

W912WJ24B0013 Amendment 0001

PDF, High priority: read this firstamendment
High

W912WJ24B0013 Amendment 0002

PDF, High priority: read this firstamendment
High

W912WJ24B0013 Amendment 0004

PDF, High priority: read this firstamendment
High

W912WJ24B0013 Amendment 0005

PDF, High priority: read this firstamendment
High

W912WJ24B0013 Amendment 0006

PDF, High priority: read this firstamendment
High

W912WJ24B0013 Amendment 0007

PDF, High priority: read this firstamendment
High

W912WJ24B0013 Amendment 0009

PDF, High priority: read this firstamendment
High

W912WJ24B0013 Amendment 0011

PDF, High priority: read this firstamendment
High

W912WJ24B0013 - East Boat Basin West Bulkhead Replacement Plans

PDF, High priority: read this first31 pages · specifications
High

W912WJ24B0013 - West Bulkhead Replacement, East Boat Basin

PDF, High priority: read this firstifb
High

West Bulkhead Replacement - East Boat Basin, Cape Cod Canal

PDF, High priority: read this firstspecifications
High

Transmittal 24-WW11-0049-APP: 401 Water Quality Certification - East Boat Basin West Bulkhead Repair

PDF, Low priorityspecial-notice
Low

W912WJ24B0013 - West Bulkhead Replacement at Cape Cod Canal

PDF, Low priorityabstract-of-offers
Low

Drawing+CAP-68+-+Revised.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

24 updates
PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed. The point of contact changed.

Notice updated

The point of contact changed.

Notice updated

The notice description changed. The point of contact changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Response deadline changed from Sep 20, 2024 to Sep 25, 2024. The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Notice updated

The notice description changed.

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2SD Endist New England
Contacts2 people available
OfficeCONCORD, MA, 01742-2751, USA
Office AddressCONCORD, MA, 01742-2751, USA

Full Description

Show more
This amendment responds to a request for information.

More opportunities from Department Of Defense → W2SD Endist New England

Same awarding agency

NAICS: 237990
New
Federal
Construction Services for Confined Aquatic Disposal Cell Construction and Maintenance Dredging of the Providence River Federal Navigation Project, Providence, Rhode Island.
Solicitation # W912WJ27X1CUP
The U.S. Army Corps of Engineers, New England District, is seeking information from small and large businesses for a dredging project in Providence, Rhode Island, under NAICS code 237990. The project is estimated to cost between 80 million and 100 million dollars, with a solicitation expected around March 15, 2027. Construction is slated to begin in September 2027 and span approximately two years, divided into two dredging seasons ending August 31, 2029. The scope involves the mechanical dredging of approximately 5.5 million cubic yards of material using closed clamshell buckets. The work is divided into two primary sequences. First, the contractor must construct a new Confined Aquatic Disposal (CAD) cell at Edgewood Shoals North, which includes digging an access channel and excavating 3.2 million cubic yards of material for disposal at four designated sites. Second, the contractor will perform maintenance dredging of the Providence River and Harbor Federal Navigation Project to a depth of -40 feet MLLW plus two feet of allowable overdepth, removing approximately 2.3 million cubic yards of material to be placed in the newly constructed CAD cell. Strict operational requirements include maintaining a production rate of 300,000 cubic yards every 30 calendar days, working 24 hours a day, 7 days a week. All activities must adhere to prescribed environmental windows to protect aquatic wildlife, and extensions to these windows are not permitted. Interested firms must demonstrate experience with mechanical dredging at the required production rate and open water placement in New England during winter months. Capabilities packages are due by December 3, 2026.
Other Heavy and Civil Engineering Construction

POSTED

1 day ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS