Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Department Of Defense was posted on November 5, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Marine Wharf and Pier Reconstruction

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Bid Ref. #27-041 North T-Hangar Development Project
Solicitation # 27-041
The North T-Hangar Development Project, solicitation number 27-041, is a construction project for the City of Albany located at the Southwest Georgia Regional Airport. The scope of work is divided into a Base Bid and four Additive Bids. The Base Bid covers pavement reconstruction of an existing taxiway and roadway, construction of new asphalt taxilanes, and site improvements including grading, drainage, storm drain pipe installation, pavement marking, chain-link fencing, erosion control, and grassing. The Additive Bids consist of the construction of three separate T-hangar buildings (Hangar No. 1, 2, and 3) and a 4-inch-thick Portland cement concrete mow pad. The project is financed through the City of Albany and the Georgia Department of Transportation. Sealed bids are due by 2:30 p.m. on December 17, 2026. Required submissions include a bid form, addendum acknowledgement, DBE subcontractor participation form, indemnity agreement, governing law and venue form, certificate of non-collusion, drug-free workplace form, and a debarred bidders integrity form. Bidders must provide a bid bond and, upon award, a 100% performance bond and a 100% labor and materials payment bond. The contractor must maintain commercial general liability insurance of at least one million dollars. Performance timelines vary based on the award combination, ranging from 77 calendar days for the Base Bid alone to 204 calendar days for the Base Bid plus all four Additive Bids. Award decisions prioritize local bidders in the event of a tie, provided the project is not federally funded.
City of Albany

POSTED

about 4 hours ago

DEADLINE

in 30 days

AI Contract Overview

Show more

The Marine Wharf and Pier Reconstruction project is a subcontract opportunity issued by the Department of Defense through the W2SD Endist Baltimore. Located in Baltimore, the scope of work involves the demolition and reconstruction of Piers 2, 3, and the South Wharf. These upgrades are specifically designed to support the operational requirements of Offshore Patrol Cutters and National Security Cutters. Key technical requirements for the project include marine pile driving, deck construction, the installation of fender systems, and the integration of mooring hardware. Interested parties must submit their responses by November 20, 2025, at 4:00 PM. The project is categorized under NAICS code 237990 for other heavy and civil engineering construction.

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Baltimore, MD, USA

Set-Aside

NONE

Documents

This scope was carved out of PANNAD25P0000027686.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Sources Sought Notice - USCG Waterfront Optimization, Coast Guard Yard, Curtis Bay MD

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • ADVANCE NOTICE: Rail Modernization ProgramOpen now, due in 317 days
  • Imperial Irrigation District – East Highline ReservoirOpen now, due in 21 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2SD Endist Baltimore
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Demolition and reconstruction of Piers 2, 3, and South Wharf to support Offshore Patrol Cutters and National Security Cutters, including marine pile driving, deck construction, fender systems, and mooring hardware.

More opportunities from Department Of Defense → W2SD Endist Baltimore

Same awarding agency

NAICS: 236220
New
Federal
Capitol Perimeter Enhancements (CPE) Design-Build Construction Project
Solicitation # W912DR27H1CWYPLA
The U.S. Army Corps of Engineers, Baltimore District, is conducting a market survey for the Capitol Perimeter Enhancements (CPE) Design-Build Construction Project located on Capitol Hill in Washington, DC. This high-visibility, mission-critical project focuses on installing Anti-Terrorism and Force Protection (AT/FP) measures, including active and passive vehicle barriers, anti-ram fencing, security kiosks, and structural infrastructure. The work is divided into a base bid for the West Front Extension and six optional project areas covering Senate Parks, Louisiana Avenue, First Street NE, First Street SE, and Delaware Avenue SW. The estimated construction magnitude is between $45 million and $75 million, with an expected performance period of approximately 1,095 calendar days. Because the project cost exceeds $35 million, the government is evaluating the potential use of a Project Labor Agreement (PLA) in accordance with Executive Order 14063 and FAR Subpart 22.5. Construction must adhere to strict governing standards, including DoD Minimum Antiterrorism Standards for Buildings, the Architectural Barriers Act, and Unified Facilities Criteria, with the Architect of the Capitol Design Guidelines taking precedence in the event of conflict. Additionally, the project requires mandatory adherence to Cultural Landscape Reports and tree preservation protocols to maintain the aesthetics of the U.S. Capitol grounds. This current solicitation is for market research and planning purposes only and does not constitute a formal Request for Proposals.
Commercial and Institutional Building Construction

POSTED

4 days ago

DEADLINE

in 17 days
View Details
NAICS: 236220
New
Federal
Capitol Perimeter Enhancements (CPE) Design-Build Construction Project
Solicitation # W912DR27H1CWY
The Capitol Perimeter Enhancements (CPE) Design-Build Construction Project is a high-visibility, mission-critical physical security infrastructure initiative managed by the U.S. Army Corps of Engineers, Baltimore District. Located on Capitol Hill in Washington, DC, the project focuses on installing Anti-Terrorism and Force Protection measures across six project areas. The scope includes a base bid for the West Front Extension and six options covering Senate Parks, Louisiana Avenue, First Street NE, First Street SE, and Delaware Avenue SW. Key deliverables involve the installation of passive and active vehicle barriers, anti-ram fencing and benches, security officer kiosks, electrical service, communications, storm drainage, and landscaping. This specific notice is a Sources Sought notice only and is not a request for proposals or a binding contract award. The government is seeking capability statements from firms under NAICS 236220 to evaluate technical capabilities, specifically regarding the ability to manage multiple active urban work zones concurrently while maintaining 24/7 public traffic and agency operations. Interested respondents must submit a PDF package not exceeding five pages, including company profiles, UEI and CAGE codes, and socioeconomic designations, to the designated points of contact by December 4, 2026.
Commercial and Institutional Building Construction

POSTED

4 days ago

DEADLINE

in 17 days
View Details
NAICS: 237990
Federal
Mid-Bay James Island Restoration Phase 2
Solicitation # W912DR27BA001
Solicitation W912DR27BA001 is a firm fixed price construction contract issued by the U.S. Army Corps of Engineers, Baltimore District, for Phase 2 of the Mid-Bay James Island Ecosystem Restoration project in Dorchester County, Maryland. The project, with an estimated magnitude of construction between 150 million and 250 million dollars, involves complex marine work at a remote location accessible only by boat. Key deliverables include the installation of approximately 22,000 linear feet of perimeter dikes using stone, geotextile, and sand, the excavation and stockpiling of roughly 650,000 cubic yards of sand from a local borrow area, and the construction of spillway structures for controlled water release. The scope also includes various option line items for dredging an access channel and turning basin. Bids must be submitted electronically via the Procurement Integrated Enterprise Environment portal by 11:00 AM EST on December 14, 2026. The evaluation process includes a price preference for HUBZone small business concerns and requires a subcontracting plan for large businesses. While payment and performance bonds are due within 10 days of award, the awardee is strictly prohibited from mobilizing at the site before September 15, 2027, pending a formal Notice to Proceed. Performance periods range from 1,095 to 1,155 calendar days depending on the line item. The contractor is required to adhere to strict environmental protections, union prevailing wage rates, and comprehensive quality control standards, including accredited laboratory testing and specific hydrographic and topographic survey accuracies.
Other Heavy and Civil Engineering Construction

POSTED

8 days ago

DEADLINE

in 27 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS