Market Intelligence Notice – Pre-Engineered Metal Buildings (PEMB)
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The U.S. Army Corps of Engineers, Savannah District, is seeking market intelligence to identify industry capabilities for the construction of various military facilities using Pre-Engineered Metal Building (PEMB) and modern industrialized construction methodologies. This Request for Information (RFI) is intended for planning purposes to improve cost, schedule, and lifecycle outcomes and does not constitute a formal solicitation. Forecasted projects include a Multi-Purpose Machine Gun Range and Live Fire Exercise Shoothouse at Fort Bragg, as well as several facilities at Moody Air Force Base, including a flight simulator, precision guided munitions igloos, an egress trainer, and squadron operations facilities. All facilities must be designed for a minimum 40-year lifespan per UFC 1-200-02, and specific secure spaces must comply with Intelligence Community Directive 705 standards for Special Access Program (SAP) and Sensitive Compartmented Information Facility (SCIF) requirements. Interested respondents must complete an online survey and submit a PDF capability statement by December 18, 2026. The capability statement should include a corporate overview, commercial best practices, supply chain logistics for long-lead items, and detailed responses to specific questions regarding industrialized construction, collaborative delivery models, and experience with secure facilities. There is no set-aside status specified for this notice. Submissions must be sent to the designated Agreement Officer and must clearly mark any proprietary or confidential information on each page.
General Info
Place of Performance
Set-Aside
Documents
1AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownEverything you need to bid on this one
Open the full contract in your free workspace.
- 1 solicitation documentRead every page
- AI contract breakdown12 sections, Uniform Contract Format
- Buyer contactEmail and phone
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Sources Sought
Submission deadline
Response Deadline
Organization & Contact Information
Full Description
Market Intelligence Notice – Pre-Engineered Metal Buildings (PEMB)
Disclaimer: This RFI is issued solely for information and planning purposes. It does not constitute a solicitation or a commitment to issue a solicitation in the future. The Government will not pay for any information or administrative costs incurred in response to this RFI.
1.0 Objective
The U.S. Army Corps of Engineers (USACE), Savannah District (SAS) is seeking market intelligence to identify and assess industry capabilities relevant to the construction of various facilities on military installations utilizing the Pre-Engineered Metal Building construction methodology. The Government is pursuing modern industrialized construction approaches intended to improve schedule, cost, and lifecycle outcomes for this facility type.
For purposes of this RFI, respondents should clearly identify whether they view these features as:
- Fully compatible with their standard commercial or industrialized building system;
- Achievable with modifications; or
- Better addressed through an alternative technical solution that provides equal or better performance.
Where respondents recommend alternatives, the response should explain how the proposed approach would satisfy or improve upon the Government's desired performance outcomes for schedule; cost; capacity/readiness; quality and durability; energy consumption; repeatability/scalability; site and installation impact; and compliance/turnover.
Information provided by respondents will be used to help the Government understand available market participants, solution types, and industry interest, and will inform future industry engagements, acquisition planning, and assessment of potential use of 10 U.S.C. § 2808a, Facility Construction or Repair: Transactions Other Than Contracts and Grants.
2.0 Forecasted Project(s) Overview
The projects identified below represent current candidates for industrialized construction methodologies across multiple military installations. This listing is non-exhaustive and subject to change. Solutions deployed under this initiative may be adapted and scaled across additional facilities as future requirements are defined. Note: Projects may include secure spaces.
Auto Multi-Purpose Machine Gun Range
Construct a modified standard design Multipurpose Machine Gun (MPMG) Range at Fort Bragg, North Carolina. Primary facilities include the MPMG Range, Range Control Tower, Range Operations and Storage Building, Range Classroom Building, Covered Mess, Ammunition Breakdown Building, Covered Bleacher, and building information systems. Supporting facilities include site improvements, paving, erosion control measures, electric service, and information systems. Facilities will be designed to a minimum life span of 40 years in accordance with Department of War’s (DoW) Unified Facilities Criteria (UFC 1-200-02), including energy efficiencies, building envelope and integrated building systems performance. Demolish 2 buildings at Fort Bragg, NC (459 Total ft2)
LFSHX - Live Fire Exercise Shoothouse
Construct standard design Live Fire Exercise Shoothouse. Primary facilities include the shoothouse, range operations control area, after action review building (small), operations/storage building (small), ammunition breakdown building, and latrine (aerated vault type). Supporting facilities include electric service, site improvements, and information systems. Access for persons with disabilities will be provided in the control and maintenance buildings. Air conditioning/heating: 4 tons. Supporting facilities cost is high due to the distance to the nearest utility hookups. Facilities will be designed to a minimum life span of 40 years in accordance with DoW's Unified Facilities Criteria (UFC 1-200- 02) including energy efficiencies, building envelope and integrated building systems performance.
38RQS Guardian Angel Squadron Ops
Construction of two new rescue squadron operations facilities, aircrew flight equipment facility, rescue maritime facility, open sided covered storage facility and an addition to the existing rescue squadron facility, building 663. Supporting facilities will include site preparations, site improvement, utilities, parking and walkways, landscaping, communications, allied support for modular buildings and all other work necessary for complete and usable facilities. Facility renovation of buildings 606 and 607 will include realignment of existing space, including work to interior walls, all utility/support systems including heating and cooling systems and fire detection and suppression systems. This Project also includes allied support construction for relocatable modular buildings to be used as swing space for the duration of construction, modular buildings include command and control, communication building, medical office, and portable armory unit.
F35A Flight Simulator
Construct a six-bay flight simulator facility for F-35A aircraft on Moody AFB. Facility will include space for 6 aircraft flight simulator bays, administration, records, classrooms, brief/debrief rooms, classified server room, and storage space for F-35A pilot flight simulator training. This facility will include Secure and Special Access Program spaces which must comply with the Intelligence Community Directive 705 criteria and standards. Supporting facilities will include demolition, site improvements, utilities, parking, and communications.
F35A Precision Guided Munitions
Construct Precision Guided Munition and Igloo Facilities at Moody AFB. Two Igloo facilities will be constructed with concrete headwall and precast, reinforced slabs on the top. Igloos are earth covered with earth fill surrounding the three closed sides with a 2:1 slide slope. The Igloo facilities will include motorized blast-proof steel doors, conduit infrastructure of Intrusion Detection System (IDS), lightning protection and grounding systems. Passive ventilation and floor drains are included for moisture. Sensitive and/or Special Access Program spaces shall comply with the Intelligence Community Directive 705 criteria and standards. Supporting facilities include utilities, access roads, pavement, parking, site improvements, communications infrastructure, signage, lighting, and unexploded ordnance clearance.
F35A Consolidated AGE Support Facility
Construct a new Aerospace Ground Equipment (AGE) consolidated facility to include administrative offices, parts storage, shop space, covered storage and open storage. This facility will include Secure and Special Access Program spaces which must comply with the Intelligence Community Directive 705 criteria and standards. Supporting facilities will include demolition, site improvements, landscaping, utilities, parking, and communications.
F35A Egress Trainer
Alter and renovate the internal space for the existing Field Training facility and construct an egress trainer. Alteration and renovation will include the addition of a bathroom and locker room, new carpet and paint, selective floor and ceiling replacement, and selective partition demolition. The addition will construct an attached egress trainer with a 21 feet ceiling height and a crane. Supporting facilities will include site improvements, utilities, and communications.
3.0 Requested Information & Market Intelligence Questionnaire
Section - General Information
Provide responses to the survey linked herein.
https://forms.osi.apps.mil/r/NX8GA8QFN5
Section - Capabilities
Respondents are asked to structure Capability Statements to include the following elements:
- Corporate Overview - A brief summary of your firm's core capabilities, relevant experience, and capacity to perform the type of work contemplated under this RFI.
- Commercial Best Practices. To the extent available, provide information regarding commercial best practices applicable to the contemplated construction delivery method, including:
- Typical pricing/payment structures
- Geographic coverage
- Typical project schedule timelines, long lead items, and key decision points
- Key considerations and risk associated with permitting, logistics, staffing/labor availability, and construction execution.
- Supply Chain and Logistics: Describe your supply chain for long lead items such as HVAC and electrical components; chillers, air handling units, computer room air conditioning (CRAC) units, transformers, etc. What are your typical lead times for material and fabrication?
- Survey Responses – Please provide detailed responses to Survey Questions 12 through 16 (listed below and on the survey form). Respondents are asked to integrate these responses directly into their capability statements; separate or stand-alone survey responses are not required. Additional Information – Respondents may include other information that demonstrates their relevant capabilities, experience, and capacity.
Survey Questions 12-16
12. How does your firm leverage industrialized construction (e.g., preassembly, modular cladding, or off-site fabrication) to accelerate on-site erection schedules and control quality?
13. Describe your firm’s practical experience with collaborative delivery models, such as Design-Build, Progressive Design-Build or Construction Manager at Risk (CMAR), where your team was integrated into the design phase. What specific pre-construction services did you provide?
14. For the projects listed in response to Q13, identify the major subcontractor(s) used and describe their qualifications. Detail the teaming relationship and contract structure between the construction contractor, the owner, and the Designer of Record. Explain how your team's involvement improved the final design quality, accelerated the delivery schedule, and reduced overall project cost.
15. How does your team fully coordinate and integrate structural, envelop, and utility designs between different interfacing construction types (such as stacked volumetric modules and traditional stick-built or foundation systems)? What engineering models do you utilize to analyze structural settlement or consolidation across these interfaces?
16. Describe up to three comparable Sensitive Compartmented Information Facility (SCIF) or Special Access Program Facility (SAPF) projects your proposed team has delivered. For each, identify—at an unclassified, releasable level—the facility type, scope, your contractual responsibilities, and which proposed personnel performed the work. What issues delayed design completion and construction completion, and what did you have to modify during construction?
4.0 Response Submission Instructions
- Format: Responses to the survey must be submitted via the link provided. The capability statement must be submitted in PDF format, single-spaced, using 11-point font or larger.
- Submission Deadline: December 18, 2026, 4:00 PM EST
- Submission Channel: Complete the survey at https://forms.osi.apps.mil/r/NX8GA8QFN5
- Submit capability statement via email to the Agreement Officer (AO) at •••••@•••••.•••Sign up to see this detail and copy •••••@•••••.•••Sign up to see this detail with the subject line: "USACE OTA Market Intelligence Response PEMB - [Company Name]".
- Proprietary Information: Any proprietary, sensitive, or business-confidential information must be clearly marked as such on each page to ensure proper handling by USACE SAS.
Similar Contracts
Same NAICS industry code
More opportunities from Department Of Defense → W074 Endist Savannah
Same awarding agency
Get AI-powered intelligence on this solicitation and the ones like it
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
