Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Connecticut was posted on May 19, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Materials Testing and Special Inspection Services

Closed
RSD13 2026-004State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541380
New
Federal
Aeration Blower and Silencer Vibration and Shock Fixture Fabrication
Solicitation # N6660426Q0459
Solicitation N66604-26-Q-0459 is a firm-fixed-price request for quotes from the Naval Undersea Warfare Center Division, Newport, for the fabrication and assembly of two specific test fixtures: one CHT Aeration Blower Fixture Assembly and one Discharge Silencer Fixture Assembly. The contractor is responsible for procuring materials, including copper-nickel piping, and performing welding and assembly to replicate a shipboard environment in accordance with Mil-DTL-901E and Mil-Std-167A. The work will be performed at the contractor's facility and at NUWCDIVNPT, where the contractor must provide on-site technical personnel to support government-executed fitment evaluations. Key deliverables include a Fabrication and Inspection Report due within five business days of assembly completion and a final Summary Report detailing fabrication and fitment testing. The desired delivery date for the assemblies is January 15, 2027, with delivery terms set as FOB Destination, Newport, RI. Award is based on the lowest price technically acceptable, with the government reviewing past performance via the Supplier Performance Risk System. Offerors must be registered in SAM, provide a CAGE code for drawing access, and achieve CMMC Level 2 (Self) certification prior to award. Quotes are due by September 11, 2026, and must include all shipping costs within the unit price.
Nuwc Division Newport

POSTED

about 15 hours ago

DEADLINE

in 7 days

AI Contract Overview

Show more

The Regional School District 13 Board of Education is seeking qualified engineering professionals to provide Materials Testing and Special Inspection Services for a construction project at Memorial Elementary School in Middlefield, Connecticut. The solicitation combines both a Request for Qualifications and a Request for Proposals, indicating that interested firms must demonstrate their expertise and submit detailed proposals for the required services. The focus is on ensuring quality and compliance throughout the construction process via thorough testing and inspections. The solicitation, identified as RSD13 2026-004, was posted on May 19, 2026, with responses due by June 2, 2026. This opportunity is managed through the Connecticut Department of Administrative Services Procurement office. Potential respondents can contact Kim Neubig, the primary point of contact, for further information. The solicitation is publicly accessible through the Connecticut bid portal, providing transparency and access to all interested professionals within the state.

General Info

Regional School District 13 seeks engineering firms for materials testing and inspection at Memorial Elementary.

Agency

Connecticut → DAS ProcurementView Agency

NAICS

541380 - Testing Laboratories and ServicesView NAICS

Place of Performance

CT, USA

Set-Aside

NONE

Documents

(5)

Connecticut Nondiscrimination Certification Forms A-E

PDFnondiscrimination-certification

Exhibit D - Fee Proposal Form for Testing Services

XLSXfee-proposal

Statement of Special Inspections for Regional School District #13 Renovations

PDFstatement-of-special-inspections

Link to Construction Drawings

DOCXother

RFP 2026-004 Materials Testing and Special Inspection Services for Memorial Elementary School

PDFrfp

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyConnecticut → DAS Procurement
Contacts1 person available
OfficeCT, USA
Organization / Agency
Connecticut → DAS Procurement
View Agency Profile
Office AddressCT, USA
Contacts
Kim NeubigPrimary Contact

Full Description

Show more
The Regional School District 13 Board of Education (“RSD 13 BOE”) is requesting qualifications and proposals from engineering professionals for Materials Testing and Special Inspection Services in connection with the construction project at Memorial Elementary School located at 124 Hubbard Street, Middlefield, CT 06455. This solicitation is both a Request for Qualifications (“RFQ”) and a Request for Proposals (“RFP”) for the Materials Testing and Special Inspection Services necessary for the Project.

More opportunities from Connecticut → DAS Procurement

Same awarding agency

NAICS: 238220
New
SLED
Westside Classroom Building Boiler Replacement Project - Westside Campus
Solicitation # 2027-WCSU-ITB-002
Western Connecticut State University is soliciting bids for the replacement of a non-functioning boiler and associated equipment at the Westside Classroom Building on its Westside Campus in Danbury, Connecticut. The project requires the contractor to provide all labor and materials for the installation of a new in-kind boiler while ensuring a second existing boiler remains operational throughout the process. The contract is reserved for vendors holding a current SBE/MBE set-aside certificate from the State of Connecticut Department of Administrative Services. Award will be granted to the apparent lowest qualified bidder who meets all technical and qualification requirements. The project is supported by 350,000 dollars in state funding and is subject to strict state contract compliance, including the CT Department of Labor’s Prevailing Wage Rates. Specific spending allocation goals have been established, with an SBE goal of 10.45 percent (36,567 dollars) and an MBE sub-goal of 3.26 percent (11,398 dollars). Key requirements include a 10 percent bid bond at the time of proposal and performance and material bonds upon award. The installation must comply with ASME Boiler and Pressure Vessel Code, NFPA 31, BOCA, and NFPA 54 standards. Deliverables include a complete, code-compliant system with an 18-month warranty on general components and a 5-year warranty on the heat exchanger and burner. Bids must be submitted by October 13, 2026.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

1 day ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS