Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity was posted on March 3, 2011. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Maurice River Boom Deployment & Evaluation

Awarded
HSCG27-11-Q-5MA236Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 562910
New
Theatre Mold Remediation Scope of Work
Solicitation # AT25-0006
Solicitation AT25-0006 is a subcontracting opportunity with Adams and Associates, Inc. for comprehensive mold remediation at Theatre Building 1086 of the Atterbury Job Corps Center in Edinburgh, Indiana. The project was necessitated by a sprinkler system failure and requires the remediation of mold throughout the entire building, including the cleaning or replacement of damaged theater seating cushions. All work must be performed in accordance with ANSI/IICRC S520 standards, EPA guidelines, OSHA regulations, and the Micro Air Inc. Mold Testing report dated April 11, 2024. The contractor is required to provide a Certified Industrial Hygienist to conduct daily site visits and a final clearance walkthrough, as well as a detailed remediation plan covering containment, HEPA filtration, and waste handling. The contract will be awarded based on best value, with evaluation weights assigned to price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must submit a single lump sum proposal on company letterhead, including a detailed cost breakdown, a timeline for substantial completion, and proof of a valid Indiana Contractor's License. Mandatory requirements include compliance with the Davis Bacon Act wage rates, a 90-day bid guarantee, and specific automobile and workers compensation insurance coverage naming Adams and Associates, Inc. as an additional insured. Performance must begin within 14 days of the Notice to Proceed, and payment is issued on Net 30 terms following the submission of certified payroll and release of liens.
Atterbury Job Corps Center

POSTED

about 1 hour ago

DEADLINE

in 19 days
NAICS: 562910
New
Maui JCC Mold Remediation and Removal of Water-Damaged Materials
Solicitation # maui-jcc-mold-remediation-removal-water-damaged-materials
Management & Training Corporation (MTC) is soliciting bids for a fixed-price, single lump sum contract to perform mold remediation and removal of water-damaged materials at the Maui Job Corps Center, specifically within Building 11. The project is necessitated by significant water intrusion following a severe windstorm on August 15, 2026. The scope of work includes the removal of mold-affected porous materials such as drywall and ceiling tiles, the implementation of HEPA-filtered negative air pressure containment to protect adjoining areas, and the remediation of structural surfaces. The estimated price range for this effort is between $25,000 and $100,000. Bids will be evaluated based on overall best value, and a physical site visit is mandatory prior to submission. For bids of $25,000 or more, contractors must provide a bid bond equal to 20% of the base bid, and the awarded contractor will be required to provide performance and payment bonds from a surety with at least an A- rating. Compliance with the Davis-Bacon Act and specific Hawaii wage determinations is required. The project is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certifications. Awardees must submit a written remediation work plan for approval and provide documentation of acceptable drying conditions upon completion. Payment is based on an approved Schedule of Values, with a 10% retainage withheld until substantial completion.
Management & Training Corporation/Hawaii/Maui Job Corps Center

POSTED

about 1 hour ago

DEADLINE

in 3 days

AI Contract Overview

Show more

Request for Quotation HSCG27-11-Q-5MA236 is a total small business set-aside under NAICS 562910 for the deployment and evaluation of a modified protective boom strategy in the Maurice River, New Jersey. The selected contractor is responsible for providing all labor, materials, and equipment to install harbor and river booms according to the Sector Delaware Bay Area Contingency Plan, ensuring the system can protect the river from oil spills without interfering with marine traffic. The project includes a physical survey of the river, a safety meeting, the actual deployment exercise, and the recovery of all equipment. The exercise is scheduled to take place between March 10, 2011, and March 31, 2011, with an anticipated duration of twelve hours. Following the deployment, the contractor must submit five electronic copies of a comprehensive Boom Deployment and Evaluation Report by June 30, 2011. This report must include GPS coordinates for anchor points, resource requirements, and recommendations for updating the Area Contingency Plan. All work must comply with federal and state boating requirements and OSHA regulations.

General Info

Agency

N/A

Contract Value

$14,999

NAICS

562910 - Remediation Services

Place of Performance

USCG Sector 1 Washington Ave, PHILADELPHIA, PA, 19147, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Combined Synopsis

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts2 people available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
John M LukondiContracting Officer
Angel L. PolContracting Officer

Full Description

Show more
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. HSCG27-11-Q- 5MA236 is issued as a Request for Quotation (RFQ). The incorporated provisions and clauses are those in effect through the Federal Acquisition Circular 2005-48. This is a Total Small Business Set Aside procurement; the applicable NAICS number is 562910 and the small business size standard is 500 employees. The FOB Destination delivery is to: USCG Sector Delaware Bay, 1 Washington Ave, Philadelphia, PA 19147 between March 10, 2011 & March 31, 2011. Offers are due at USCG BSU Portsmouth, VA, by the Close of Business on March 1, 2011. Questions may be directed to John Lukondi, telephone 757.483.8555 or email: John.m.lukondi@uscg.mil Unit POC for technical questions or to arrange a site visit: Gerald Conrad @ 215.271.4824 The USCG BSU Portsmouth has a requirement to purchase: SCOPE OF WORK MAURICE RIVER NEW JERSEY - BOOM DEPLOYMENT & EVALUATION 1. GENERAL REQUIREMENTS: The work consists of consulting and providing all labor, materials, and equipment as required to deploy a modified protective boom strategy based on the boom deployment plan currently contained in the Sector Delaware Bay, Area Contingency Plan (ACP), for the Maurice River in New Jersey. See Section 14, "Boom Deployment Strategy" of this Scope of Work to see the deployment strategy from the ACP and the modified booming strategy to be utilized for one leg of the deployment. Boom deployment will begin prior to the onset of the Maurice River flood tide at Bivalve and continue into ebb tide. The contractor will validate the system's ability to protect the Maurice River in the event of an oil spill. The contractor must then provide five (5) copies of a Boom Deployment and Evaluation Report, on compact discs (cds) utilizing Microsoft Office Suite Program software, to the designated Coast Guard Project Manager. See Section 11 "Boom Deployment and Evaluation Report Requirements" of this Scope of Work for the minimum required contents of the report. 2. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK: Upon acceptance, the contractor shall commence boom deployment, protective strategy evaluation, and boom recovery (also referred to as "the exercise") to be conducted on an acceptable date (anticipated acceptable weather and tidal conditions) between March 10, 2011 and March 31, 2011. The anticipated duration of the exercise is twelve hours. The exercise can be suspended earlier by the Coast Guard Project Manager if evaluation results validate the ACP's booming strategy. The contractor shall then proceed to work diligently to complete and provide the report to the Coast Guard Project Manager by June 30, 2011. 3. SCOPE OF WORK: The selected contractor shall: a. Contact the Coast Guard Project Manager to identify an "acceptable date" for the exercise. b. At least three (3) days prior to the "acceptable date" for the exercise, physically survey the mouth and banks of Maurice River to identify hazards, concerns, and to validate boom anchor points. c. The day prior to the exercise, the contractor shall participate in a pre-boom deployment and evaluation safety meeting/conference to determine if conditions meet the criteria for a "Go exercise" situation. a. If conditions are not acceptable to conduct the exercise on the initially approved date; representatives from the Coast Guard, New Jersey Department of Environmental Protection (NJDEP), and the contractor will select an alternate date that has anticipated acceptable weather and tidal conditions to conduct the exercise. d. Transport all material, equipment and workers to and from work areas and deployment sites. e. Provide security for any pre-staged equipment and materials as appropriate. f. Have all equipment mobilized, pre-positioned and ready for deployment at least two (2) hours prior to the onset of the chosen Maurice River flood tide at Bivalve. g. Install all booms as required by the boom deployment plan in the Sector Delaware Bay ACP, with the exception of the Maurice River channel, (See Section 14(b)). Boom is to be anchored outside of the channel's edges but in such a way as to satisfactorily test the system but not interfere with marine traffic transiting through the area or using the Maurice River channel. According to current boom deployment plans, the contractor will: a. Install 18 inch harbor/river boom from a boom attachment pole (previously placed by NJDEP) approximately located at 39� 13.291'N, 75� 02.141'W to 39� 12.833'N, 75� 02.174'W. Estimated distance is approximately 2,700 feet. b. Install 18 inch harbor/river boom from a boom attachment pole (previously placed by NJDEP) approximately located at 39� 12.710'N, 75� 01.487'W to 39� 12.778'N, 75� 01.869'W. Estimated distance is approximately 1,840 feet. c. Install 18 inch harbor/river boom from 39� 12.785'N, 75� 01.906'W to 39� 12.833'N, 75� 02.174'W. Estimated distance is approximately 1,300 feet. h. Have personnel and equipment available to maintain and adjust the booms, and capture and control any "run-a-way" free floating boom(s) that could be a hazard to navigation. i. Have personnel available to immediately detach the boom from the anchor poles so as to prevent damage to them. j. The contractor shall provide for on-site health and safety needs. Provisions include: a. Minimum of two (2) portable toilets. b. Provide at least one 20 X 20 foot canopy or shelter for observers and VIPs. c. Attach boom lights every two hundred feet to any deployed boom after dusk. k. Validate appropriateness of staging area as identified the Sector Delaware Bay ACP. l. Validate driving directions to the staging area. m. Review the Sector Delaware Bay ACP and validate the type and amount of boom, workboats, anchors connecting hardware, cables and other equipment required to adequately boom the Maurice River, NJ. n. Prior to removing boom, the contractor shall meet with Coast Guard Project Manager and New Jersey Department of Environmental Protection personnel to provide deployment evaluation findings. a. If necessary, all parties will discuss the need for alternate boom deployment recommendations. b. If time and conditions permit, the contractor will adjust the boom to conform to alternate booming recommendations and evaluate the alternate recommended system. o. The contractor shall report to and conclude the evaluation when instructed by the Coast Guard Project Manager or on site delegate. p. Validate GPS coordinates for boom attachment points. q. Provide five (5) copies of the Boom Deployment and Evaluation Report so that, the electronic Environmental Sensitivity Maps and the Applied Science Associates (ASA) booming strategy plans, in the Sector Delaware Bay ACP, can be updated. r. Monitor marine radio channels 13 and 16 and be able to communicate with marine traffic transiting through the area and local Coast Guard units or assets. 4. SITE VISIT: All bidders should be familiar with the Maurice River, Delaware River and Delaware Bay. 5. DESIGNATED CONTACTS: The designated Coast Guard Project Manager is Mr. Gerald Conrad, 215-271-4824. Contractual inquiries concerning any phase of the specification before or after award shall be made to the Contracting Officer, SKC MALONE at (215) 677-4808. 6. CONDITIONS AFFECTING THE WORK: The prospective contractor should be familiar with the Maurice River, Delaware River and Delaware Bay and take any other steps as may be reasonably necessary to ascertain the nature and location of the work, the general and local conditions which can affect the cost of the work thereof. Failure to do so will not relieve bidders from responsibility for estimating properly the difficulty or cost of successfully performing the work. The government will assume no responsibility for any understanding or misrepresentations concerning conditions made by any of its officers or agents prior to the execution of the contract, unless included in the request for quotes, the specification or related documents. 7. AFTER AWARD OF THE CONTRACT: The contractor must immediately notify the designated Coast Guard Project Manager of the intended start date. The work shall be done in accordance with the specification as enumerated in Section 3. 8. ORAL MODIFICATION: No oral statement of any person other than the Contracting Officer shall in any manner or degree, modify or otherwise affect the terms of this contract. 9. WORKMANSHIP: All work shall be accomplished with the best standard practices, and by workmen thoroughly experienced in the required tasks. The work shall be supervised by experienced personnel and shall be satisfactory to the Contracting Officer. 10. PERMITS: The contractor shall assist the Coast Guard Project Manager, without additional expense to the government, to obtain all federal and state permits required for the prosecution of the work. Any permits and licenses required to implement the activity pursuant to paragraph 3(i), shall be sole responsibility of the contractor. The contractor shall provide the permits three (3) days prior to the commencement of the exercise. The contractor shall comply with all applicable federal, state and local laws. 11. BOOM DEPLOYMENT and EVALUATION REPORT REQUIREMENTS: At a minimum, the report should include, but not be limited to the following: a. The name of the booming location (Maurice River). b. The river mile of Maurice River from the mouth of the Delaware Bay. c. The latitude and longitude of the Maurice River. d. The latitude and longitude of anchor connection poles. e. The best method of access to the boom anchor connection poles (e.g. land or water). f. Any issues/information regarding the staging area(s) that service the Maurice River. g. Validate the driving directions to the staging area. h. Any tidal or current issues that impact boom deployments. i. Any boom tending recommendations such as, "daily" or "continuous" tending needed. j. An overview description/statement on the Maurice River to include the types of; private and commercial development on the banks; and vessel traffic found on the river. k. The necessary deployment resources such as the type and size of workboats; the number, type, and weight of anchors; and the type, size, and quantity of boom needed to protect the Maurice River. Recommendations should take into consideration; tidal cycles, time of day, seasonal issues and weather conditions. l. Any other equipment or materials needed to attach boom to the anchor poles or to protect the Maurice River. m. Chart and satellite "images" of the Maurice River with the boom deployment methods/strategies drawn on the image. n. The estimated amount of time needed to deploy boom at the location, from the time that all personnel, equipment, and materials are on scene. 12. UPON COMPLETION OF WORK: Notify the designated Coast Guard Project Manager when work is completed. 13. SAFETY REQUIREMENTS: The contractor shall conform to all federal and state boating requirements and any applicable OSHA regulations. 14. BOOM DEPLOYMENT STRATEGY: a. Protective Boom Strategy Contained In Sector Delaware Bay Area Contingency Plan b. Modified Booming Strategy To Be Utilized (Note: No boom across Maurice River channel) c. Latitude and Longitude Points for Maurice River Channel Edges Company's quotes should include: (1) The solicitation number; (2) The time specified in the solicitation for receipt of offers; (3) The name, address, and telephone number of the offeror; (4) A technical description of the items being offered in sufficient detail to evaluate compliance with the requirements in the solicitation. This may include product literature, or other documents, if necessary; (5) Terms of any express warranty; (6) Price, availability and any discount terms; (7) "Remit to" address, if different than mailing address; (8) A completed copy of the representations and certifications at FAR 52.212-3 (see FAR 52.212-3(j) for those representations and certifications that the offeror shall complete electronically); (9) Acknowledgment of Solicitation Amendments; (10) Past performance information, when included as an evaluation factor, to include recent and relevant contracts for the same or similar items and other references (including contract numbers, points of contact with telephone numbers and other relevant information); (11) If the offer is not submitted on the SF 1449, include a statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation. Offers that fail to furnish required representations or information, or reject the terms and conditions of the solicitation may be excluded from consideration; (12) Company Tax Information Number and DUNS Number. (13) One copy of liability insurance certificate (14) One copy of business/contractor's license All responsible sources may submit a quotation, which if timely received, shall be considered by this agency. Quotes may be mailed, faxed or emailed. The following FAR provisions/clauses apply to this solicitation. Offerors may obtain full text versions of these clauses electronically at http://www.acquisition.gov/far/ FAR 52.204-7 Central Contractor Registration (Apr 2008) FAR 52.212-1 Instructions to Offerors-Commercial Items (JUN 2008); there are no addenda to this provision. FAR 52.212-2 Evaluation-Commercial Items-Pricing (Jan 1999) is incorporated and the evaluation criteria will be pricing and delivery. FAR 52.212-3 Offeror Representations and Certifications-Commercial Items (Sep 2010) with Alt 1 must be included with your offer. FAR 52.212-4 Contract Terms and Conditions-Commercial Items (June 2010); there are no addenda to this clause. FAR 52.212-5 Contract Terms and Conditions Required to Implement Statues or Executive Orders, Commercial Items (Dec 2010). The following clauses listed in 52.212-5 are incorporated (if any): 52.219-6, Notice of Total Small Business Set-Aside (Jun 2003)(15 U.S.C. 644); 52.222-3 Convict Labor (Jun 2003) (E.O. 11755); 52.222-19, Child Labor - Cooperation with Authorities and Remedies (Jul 2010)(E.O. 13126); 52.222-21, Prohibition of Segregated Facilities (Feb 1999); 52.222-26 Equal Opportunity (Mar 2007)(E.O. 11246); 52.222-35, Affirmative Action for Disabled Veterans and Veterans of the Vietnam Era (Sep 2010)(29 U.S.C. 793); 52.222-36 Affirmative Action for Workers with Disabilities(Oct 2010); 52.222-37, Employment Reports on Disabled Veterans and Veterans of the Vietnam Era (Sep 2010)(38 U.S.C. 4212); 52.222-41 Service Contract Act of 1965 (Nov 2007)(41 U.S.C.351, et seq); 52.222-44 Fair Labor Standards Act and Service Contract Act - Price Adjustment (Sep 2009)(29 U.S.C. and 41 U.S.C. 351); 52.223.18, Contractor Policy to Ban Text Messaging While Driving (Sep 2010) (E.O. 13513); 52.225-1 Buy American Act - Supplies (Feb 2009)(41 U.S.C. 10a-10d); 52.225-3, Buy American Act-Free Trade Agreements-Israeli Trade Act (Feb 2009); 52.225-13, Restrictions on Certain Foreign Purchases (Jun 2008)(E.O. 12722, 12724,13059, 13067, 13121, and 13129); 52.232-33 Payments by Electronic Funds Transfer Central Contractor Registration (Oct 2003)(21 U.S.C. 3332). Department of Labor Wage Determination No: 2005-2449, Revision No: 10, Dated 09/14/2010 and its successors applies. The following Homeland Security Acquisition Regulations (HSAR) are incorporated as addenda to this solicitation: HSAR 3052.209-70 Prohibition on Contracts with Corporate Expatriates (Jun 2006). Copies of HSAR clauses may be obtained electronically at http://www.dhs.gov.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS