Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

McKenzie Meadows Restoration Project Phase

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The McKenzie Meadows Restoration Project Phase 1 is a forecasted environmental initiative located in Lassen County, California, near Westwood. Managed by the California Regional Water Quality Control Board, Region 5 in Redding, the project aims to restore meadow floodplain function and elevate the water table across a 212-acre area. Key restoration activities include the removal of old railroad grades and berms that obstruct water flow, as well as the implementation of partial channel fills and the installation of rock and sod riffles to improve hydrologic connectivity and enhance habitat for native fish and wildlife. The project is statutorily exempt from the California Environmental Quality Act review under Public Resources Code section 21080.56 due to its focus on habitat restoration. Regulatory compliance is supported by the U.S. Army Corps of Engineers through Nationwide Permit 27 under Clean Water Act Section 404 and a Section 401 Water Quality Certification with WDID No. 5A18CR00035. While the project is currently listed as a forecast with no specified contract value or fixed performance schedule, it involves coordination between the Central Valley Regional Water Quality Control Board and the U.S. Army Corps of Engineers, with primary points of contact including Lynn Coster and Steve DeBonis.

General Info

McKenzie Meadows Restoration Project restores floodplain function on 212 acres in Lassen County using permitted habitat improvements.

Agency

California → Regional Water Quality Control Board, Region 5 - Redding

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

5A18CR00035 McKenzie Meadows Restoration Project CEQA Notice of Determination

PDFceqa-notice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Regional Water Quality Control Board, Region 5 - Redding
Contacts2 people available
OfficeN/A
Organization / Agency
California → Regional Water Quality Control Board, Region 5 - Redding
Office AddressN/A
Contacts
Lynn CosterSenior Environmental Scientist
Steve DeBonisAlmanor District Manager

Full Description

Show more
The Project proposes restoring meadow floodplain function and water table elevation within the 212-acre area of McKenzie Meadows. Restoration activities will include partial channel fill, rock riffles, sod riffles, and removal of several sections of old railroad grade/berm that are negatively impacting water flow through the meadow.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The U.S. Army Corps of Engineers Honolulu District is soliciting sealed bids for a firm-fixed-price contract to perform maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes the dredging and ocean disposal of approximately 4,260 cubic yards of material, with disposal at an approved offshore site south of Oahu. Additionally, the contractor will perform revetted mole repairs involving clearing and grubbing, vegetation and root removal, stone rework, and filling voids with additional stone. The estimated value of the work ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the Notice to Proceed. This solicitation is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Bidders must provide a bid guarantee and are required to furnish performance and payment bonds upon award. Key deliverables include pre- and post-dredge multi-beam surveys conducted by a third-party qualified surveyor and the submission of an operations plan within 30 days of the Notice to Proceed. The contract mandates strict adherence to USACE accuracy standards and quality control measures, including a punch-out inspection and final acceptance inspection. Liquidated damages for delays are set at 2,297 dollars per calendar day. Bids must be submitted in sealed envelopes to the Fort Shafter office, as electronic submissions are not permitted.
Healy Tibbitts Builders, Inc.

POSTED

about 4 hours ago

DEADLINE

in 14 days
View Details
NAICS: 237990
New
SLED
Reclamation District No. 1600 DMP Drainage Pipe Replacement ProjectReclamation District 1600 is undertaking the Deferred Maintenance Program Drainage Pipe Replacement Project in Yolo County, California. The project consists of the in-kind replacement of a single 48-inch gravity drainage pipe located southeast of Knights Landing along the Tule Canal at Levee Mile 0.36. The primary objective is to maintain the existing pipe size, function, and alignment to ensure the continued conveyance of water from agricultural lands east of Woodland to the Tule Canal within the Yolo Bypass. Construction is scheduled to begin on August 3, 2026, with a phased timeline including mobilization, site preparation, excavation and demolition, pipe installation, levee restoration, and final demobilization. The project has undergone a comprehensive environmental review under the California Environmental Quality Act, resulting in a Mitigated Negative Declaration. This assessment determined that there are no significant unmitigable environmental impacts, provided that specific avoidance and minimization measures are implemented. Key requirements for the contractor include mandatory worker environmental awareness training, the installation of temporary exclusion fencing to protect aquatic habitats, the execution of a Spill Prevention, Containment, and Countermeasure Plan, and adherence to strict in-water work windows. Additionally, the contractor must utilize vibratory pile drivers for cofferdams and maintain daily inspections of silt curtains to control turbidity in compliance with Basin Plan standards and Cal-OSHA safety requirements.
Reclamation District 1600

POSTED

about 13 hours ago

DEADLINE

N/A
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS