McKenzie Meadows Restoration Project Phase

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The McKenzie Meadows Restoration Project Phase 1 aims to restore natural floodplain function and elevate the water table across a 212-acre site in Lassen County, California, near Westwood. Primary restoration activities include partial channel fill, installation of rock and sod riffles, and the removal of obsolete railroad grades and berms that obstruct natural water flow. These actions are designed to reestablish hydrologic connectivity, improve aquatic habitat conditions, and support native fish and wildlife species. The project is statutorily exempt from full environmental review under California Environmental Quality Act Section 21080.56 due to its habitat restoration purpose, and it has received concurrence from the California Department of Fish and Wildlife. Regulatory authorization is secured through U.S. Army Corps of Engineers Nationwide Permit 27 under Clean Water Act Section 404, along with a Section 401 Water Quality Certification issued by the Central Valley Regional Water Quality Control Board using WDID No. 5A18CR00035. The project is led by the Regional Water Quality Control Board, Region 5 – Redding, with primary point of contact being Senior Environmental Scientist Lynn Coster and Almanor District Manager Steve DeBonis from Sierra Pacific Industries, Inc., who is also identified as the responsible party for implementation. Performance will occur on-site at McKenzie Meadows with inspections and acceptance conducted by federal and state regulatory agencies, including the U.S. Army Corps of Engineers and the Central Valley Regional Water Quality Control Board. No formal contract value, pricing structure, solicitation number, or detailed performance timeline has been publicly disclosed, as the current documentation serves as a forecast and environmental notice rather than a binding solicitation. No FAR clauses, contract administration data, payment details, invoicing procedures, or offeror certifications are included in the available materials, indicating the procurement process is in a preliminary phase with formal contracting arrangements yet to be established.

General Info

McKenzie Meadows Restoration Project restores floodplain function on 212 acres in Lassen County using permitted habitat improvements.

Agency

California → Regional Water Quality Control Board, Region 5 - Redding

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

5A18CR00035 McKenzie Meadows Restoration Project CEQA Notice of Determination

PDFceqa-notice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Regional Water Quality Control Board, Region 5 - Redding
Contacts2 people available
OfficeN/A
Organization / Agency
California → Regional Water Quality Control Board, Region 5 - Redding
Office AddressN/A
Contacts
Lynn CosterSenior Environmental Scientist
Steve DeBonisAlmanor District Manager

Full Description

Show more
The Project proposes restoring meadow floodplain function and water table elevation within the 212-acre area of McKenzie Meadows. Restoration activities will include partial channel fill, rock riffles, sod riffles, and removal of several sections of old railroad grade/berm that are negatively impacting water flow through the meadow.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
AIRFIELD 2029 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure improvements at the Port of Seattle, focusing on modernization and safety enhancements across multiple systems. Key components include replacing airfield lighting circuits with low megger readings with new LED fixtures and signs to improve reliability and energy efficiency, replacing deteriorating pavement and critical utilities to maintain operational integrity, and implementing comprehensive wildlife hazard management measures such as removing turf edge dams, installing anti-perching devices on signs, and regrading areas with new storm drainage to eliminate ponding and reduce bird attractants. Additionally, failing flush fire hydrant access hatches will be replaced to ensure rapid and unobstructed access for emergency response. The project is part of the AIRFIELD 2029 ALL PROJECTS initiative, classified under NAICS code 237990 for other heavy and civil engineering construction, and is managed by the Aviation Project Management Group under the Port of Seattle. Solicitations are open with a posted date of July 31, 2026, and inquiries should be directed to Yanet Maldonado, the primary point of contact. The work is critical to maintaining airfield safety, regulatory compliance, and long-term operational readiness, with all efforts centered on upgrading aging infrastructure to meet current aviation standards.
Aviation Project Management Group

POSTED

about 7 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
AIRFIELD 2030 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure upgrades at the Port of Seattle, focusing on enhancing safety, efficiency, and compliance. Key components include replacing aging airfield lighting circuits with low megger readings with modern LED fixtures and signs to improve visibility and reduce maintenance costs. Concurrently, failing pavement sections and critical utilities will be removed and replaced to ensure structural integrity and operational reliability. Wildlife hazard mitigation measures involve removing turf edge dams along runways, taxiways, and access roads, installing anti-perching devices on signs to deter birds, and addressing ponding issues through regrading and new storm drainage infrastructure. Additionally, deteriorating flush fire hydrant access hatches will be replaced to ensure rapid access for emergency response teams. The project is categorized under NAICS code 237990 and falls under the Aviation Project Management Group, with the Port of Seattle as the overseeing agency. The solicitation is posted as a forecast with no set-aside classification, indicating it is open to all eligible contractors. Primary point of contact for inquiries is Yanet Maldonado, reachable via email or phone, and additional details can be accessed through the provided portal link. The project is anticipated to begin after the posted date in July 2026, with all work taking place at the airport facility.
Aviation Project Management Group

POSTED

about 7 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Ground Grid Substations Surface Restoration and Vegetation Abatement
Solicitation # CS 07-26-04
The contract pertains to the restoration of surface conditions and vegetation abatement at substation sites in California, addressing significant issues including dense weed and woody vegetation growth within fenced areas, reduced crushed-rock depth below minimum effective levels, and the accumulation of organic material that compromises surface resistivity. The work encompasses removing invasive vegetation, reestablishing proper crushed-rock coverage to meet safety and operational standards, and eliminating organic buildup to ensure proper electrical grounding performance and site integrity. All tasks must be executed in compliance with utility safety and environmental protocols to safeguard personnel and infrastructure. The solicitation, identified as CS 07-26-04, was posted on July 31, 2026, with responses due by September 2, 2026, and is managed by the Engineering and Operations division of Alameda County, California. Work performance will occur at various substations within the state, with primary point of contact being Bill Staton, Electrical Equipment Superintendent, reachable at 510-748-3958 or staton@alamedamp.com, and secondary contact Jeffrey Braun, Support Services Manager, at 510-748-3971 or braun@alamedamp.com. The project is administered under a state and local government entity with no set-aside designation specified, and details can be accessed via the provided online portal.