MD 249 from Thomas Road to Stark Drive Drainage Improvement Design-Build Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Maryland State Highway Administration is seeking proposals for the MD 249 from Thomas Road to Stark Drive Drainage Improvement Design-Build Project. This single design-build contract, procured through a Competitive Sealed Proposals process, focuses on a two-mile stretch of MD 249 on Saint George Island in Saint Marys County. The project aims to address critical drainage issues and protect the roadway from tidal inundation, wave action, and shoreline erosion, which threaten roadway integrity and emergency access. Interested contractors and engineering firms are invited to a virtual informational meeting on September 9, 2026, at 1 PM. Registration is required via email at least two business days before the meeting. The solicitation is managed by the Maryland Department of Transportation, with a response deadline of September 30, 2026. Additional project details and documentation are available through the provided ArcGIS hub and the official state procurement portal.
General Info
Agency
NAICS
Place of Performance
MD, USASet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Response Deadline
Organization & Contact Information
Full Description
Category: Building and Facility Construction and Maintenance Services
Additional Instructions: This is a single Design-Build contract and will be procured through the Competitive Sealed Proposals process. This project extends approximately 2 miles along MD 249 (Piney Point Road) between Thomas Road and Stark Drive on Saint George Island in Saint Mary’s County, Maryland. The roadway is a low-lying minor collector with elevations ranging from approximately 2.0 to 4.7 feet above sea level across the four (4) project sites, making it highly susceptible to tidal inundation, wave action, and shoreline erosion due to its location between the Potomac and Saint Mary’s Rivers near the Chesapeake Bay. Projections indicate that by 2045, inundation could occur up to 226 times per year, increasing risks to roadway integrity, residential access, and emergency response. Additional information is available on the project at the following location: https://mdot-sha-md249-thomas-rd-to-stark-dr-sm2595174-maryland.hub.arcgis.com/